Federal contract award

W15QKN15C0066

IGF::OT::IGF CARTRIDGE, 120MM, ADVANCED MULTI-PURPOSE (AMP), XM1147, HIGH EXPLOSIVE MULTI-PURPOSE WITH TRACER (HEMP-T)

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QK ACC-RI-PICATINNY
NAICS332993 — Ammunition (except Small Arms) Manufacturing
PSCAD14 — AMMUNITION - ENGINEERING DEVELOPMENT
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$223.6M
Current contract value$223.6M
Potential contract value / ceiling$365.0M
Start dateJul 28, 2015
Current end dateFeb 13, 2027
Potential end dateDec 23, 2027
Latest award activityApr 2, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 50 of 50 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 2, 2026P00048$0CLINS 0036 AND 9936 DELIVERY EXTENDED FROM 31 MARCH 2026 TO 29 MAY 2026.
Dec 15, 2025P00047$0UPDATE DELIVERY SCHEDULE CLIN 0036 AND CLIN 9936
Oct 16, 2025P00046$1.4MADDED CLIN 9936 TO PROVIDE FOR OVERRUN FUNDING TO COMPLETE CLIM 0036 KRAFT PAPER QUALIFICATION. UPDATE KRAFT PAPER QUALIFICATION DELIVERY DATE TO 12/31/2025. ADD CLIN 0040 TO SEGREGATE CONSIDERATION DUE ON P00041 SO CONTRACTOR CAN ACCOUNT FOR DELIVERY IN WAWF.
Aug 19, 2025P00045$-96.2KGRANT A DELIVERY SCHEDULE EXTENSION FOR CLINS 0021, 0023, 0031AA, 0031AB, 0031AC,0032, 0033, 0034, 0035, 0039 FOUND IN SECTION B, SUPPLIES OR SERVICES AND PRICE/COST. INCORPORATE (5) 1147'S AS CONSIDERATION. DEOBLIGATE SUBCLIN 000414 ARN AS TO MATCH DCMA A MODIFICATION ISSUED 01/04/2024. THIS RECTIFIES TOTAL OBLIGATED AMOUNT.
Jun 3, 2025P00044$0CHANGE INSPECTION AND ACCEPTANCE FROM: "DESTINATION" TO: "ORIGIN" ON CLINS 0006, 0013, 0018, 0023, AND 0035. UPDATE PCO INFORMATION.
Feb 14, 2025P00043$8.6MADD CLIN 0039, FOR ADDITIONAL QUANTITY BEING ADDED TO EXISTING CLIN 0032 FULL RATE PRODUCTION.
Sep 27, 2024P00041$80.6MORDER 5,000 CARTRIDGES AND TESTING
Sep 27, 2024P00042$1.3MMODIFICATION TO INCORPORATE WARHEAD TESTING INTO SECTION C C.7.4.3.22
May 23, 2024P00040$21.7MEXERCISE OPTION
Jan 30, 2024A00002$-96.2KCARTRIDGE, 120MM, ADVANCED MULTI-PURPOSE (AMP), XM1147, HIGH EXPLOSIVE MULTI-PURPOSE WITH TRACER (HEMP-T)
Dec 11, 2023P00039$21.2MEXCERCISE OPTION
Aug 15, 2022P00038$0INCORPORATE REQUEST FOR VARIANCE (RFV), PROCURING ACTIVITY NO. R22K8003 AND REQUEST FOR VARIANCE (RFV), PROCURING ACTIVITY NO. R22K8005.
Oct 27, 2021P00037$0UPDATE SECTION J, ATTACHMENT 0021, AMP CDRL DISTRIBUTION LIST, POINT OF CONTACTS.
Aug 30, 2021A00001$0UPDATE SECTION J, ATTACHMENT 0021, AMP CDRL DISTRIBUTION LIST, POINT OF CONTACTS.
Jul 26, 2021P00036$0INCORPORATE ENGINEERING CHANGE PROPOSAL (ECP), PROCURING ACTIVITY NO. R20Q5007/ INCORPORATE PERFORMANCE SPECIFICATION PRF13053500, DATED 15 JUNE 2021.
May 26, 2021P00035$87.7KCHANGE PLACE OF PERFORMANCE OF FAT FUZE TESTING UNDER CLIN 00012. ADD CLIN 0029 TO ADD THE COST OF CONTRACTOR PERFORMING THE FAT FUZE TESTING.
May 4, 2021P00034$8.0KADD COST TO MODIFY GOVERNMENT PROPERTY, AND UPDATE CONTRACT DATA REQUIREMENTS LISTS (CDRLS)
Mar 30, 2021P00032$0UPDATE CLIN 0025AB DELIVERY DESTINATIONS, UPDATE THE STATEMENT OF WORK TO THE MOST CURRENT DOCUMENTS, AND UPDATE SECTION E CLAUSES 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT AND 52.246-4015 AMMUNITION DATA CARDS (ADC).
Mar 30, 2021P00033$560.0KINCORPORATE AWARD FEE FOR DESIGN TEST AND EVALUATION (DT&E)
Jan 12, 2021P00030$0CHANGES THE CONTRACTING OFFICER FOR CONTRACT, AND UPDATE DD254
Dec 9, 2020P00029$12.0MEXERCISE LOW RATE INITIAL PRODUCTION (LRIP) OPTION, LRIP BALLISTIC FIRST ARTICLE TEST CARTRIDGES OPTION, LRIP BALLISTIC FIRST ARTICLE TEST FUZES OPTION, LRIP COMPONENT FIRST ARTICLE TEST REPORT OPTION
Nov 20, 2020P00027$0ADD FEDERAL ACQUISITION REGULATION (FAR) CLAUSE 52.204-25 ENTITLED "PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT", DATED AUG 2020.
Nov 20, 2020P00028$203.9KMODIFICATION TO INCREASE TOTAL COST DUE TO COST OVERRUN.
Apr 15, 2020P00026$1.8MMODIFICATION TO INCREASE TOTAL COST DUE TO COST OVERRUN.
Apr 30, 2019P00025$12.8MMODIFICATION TO INCREASE TOTAL COST DUE TO COST OVERRUN AND REDUCE FEE TO MINIMUM FEE UNDER EMD PHASE II.
Feb 21, 2019P00024$2.0MMODIFICATION INCORPORATING INCREMENTAL FUNDING FOR EMD PHASE II
Sep 25, 2018P00023$668.5KINCREMENTAL FUNDING
Jun 22, 2018P00022$2.8MINCREMENTAL FUNDING MOD FOR EMD PHASE II
Mar 12, 2018P00021$7.9MINCREMENTAL FUNDING MOD FOR EMD PHASE II
Feb 15, 2018P00018$0IGF::OT::IGF
Jan 12, 2018P00020$7.0MINCREMENTAL FUNDING FOR EMD PHASE II
Nov 3, 2017P00019$4.5MINCREMENTAL FUNDING FOR EMD PHASE II
Apr 5, 2017P00017$0IGF::OT::IGF
Jan 25, 2017P00016$19.8MIGF::OT::IGF
Jan 23, 2017P00015$923.9KIGF::OT::IGF, THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION 1.
Dec 21, 2016P00013$0IGF::OT::IGF
Dec 21, 2016P00014$0IGF::OT::IGF
Sep 21, 2016P00012$0IGF::OT::IGF
Jul 27, 2016P00009$0IGF::OT::IGF
Jun 28, 2016P00011$0IGF::OT::IGF INCORPORATE CHANGES TO STATEMENT OF WORK (SOW).
May 24, 2016P00010$0IGF::OT::IGF INCORPORATE ENGINEERING CHANGE PROPOSAL (ECP) R16Q3002
Mar 30, 2016P00008$0IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE OPSEC REQUIREMENT.
Feb 11, 2016P00007$6.9MIGF::OT::IGF
Feb 3, 2016P00006$0IGF::OT::IGF
Nov 24, 2015P00005$1.0MIGF::OT::IGF
Nov 18, 2015P00004$0IGF::OT::IGF
Nov 5, 2015P00003$0IGF::OT::IGF
Oct 20, 2015P00001$0IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO ADD DFARS CLAUSE 252.225-7013 - DUTY FREE ENTRY.
Oct 19, 2015P00002$2.6MIGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING.
Jul 28, 20150$5.3MIGF::OT::IGF CARTRIDGE, 120MM, ADVANCED MULTI-PURPOSE (AMP), XM1147, HIGH EXPLOSIVE MULTI-PURPOSE WITH TRACER (HEMP-T)

Estimated positioning window

Dec 23, 2026 – Jun 23, 2027

Recompete signal:
55/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 55/100. Available recorded signals: 50 points.

Contract end 2027-12-23 (417 days from calculation)
+25 points
1 historical awards in this buyer and category group
+0 points
50 recorded award transactions
+10 points
Latest award action: 2026-04-02
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Check the stated set-aside against the solicitation and current certifications.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.