Date filters select awards with transaction activity in the period. Amounts below are lifetime award obligations. IDV values remain separate.
SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO DO A PUMP HOUSE ALTERNATIVES STUDY AT THE ROTATION, PROCESSING, AND SURGE FACILITY (RPSF) AT KENNEDY SPACE CENTER…National Aeronautics and Space Administration$507.0K obligationsEnds Sep 30, 2026
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF INTERIOR RENOVATIONS AT THE BOOSTER FABRICATION FACILITY (BFF), KSC, FLNational Aeronautics and Space Administration$1.1M obligationsEnds Dec 25, 2026
COMPRESSOR 9 DESIGN-BUILD REQUEST FOR PROPOSAL AND FUNCTIONAL REQUIREMENTS DOCUMENTNational Aeronautics and Space Administration$288.1K obligationsEnds Sep 30, 2026
ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF THE CONSTRUCTION OF SAFETY AND RELIABILITY UPGRADE, KSC INSTITUTIONAL POWER SYSTEMS, PHASE 4A, PROJECT CONTROL NUMBER (PCN)…National Aeronautics and Space Administration$187.1K obligationsEnds Apr 15, 2026
ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) BUILDING 4583 ELECTRICAL REVITALIZATONNational Aeronautics and Space Administration$141.2K obligationsEnds Jul 31, 2027
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF SAFETY AND RELIABILITY UPGRADES, KSC INSTITUTIONAL POWER SYSTEMS, PHASE 6, REVISION A. PROJECT CONTROL NUMBER (PCN) 98996.6National Aeronautics and Space Administration$270.3K obligationsEnds Nov 18, 2028
SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO REVISED NASA UNIFIED FACILITIES GUIDE SPECIFICATION (UFGS) SECTIONS VARIOUS DISCIPLINES AT KENNEDY SPACE CENTER, FLORIDANational Aeronautics and Space Administration$212.8K obligationsEnds Jun 23, 2026
ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF REPLACE SS-1113 A/B AT THE BOOSTER FABRICATION FACILITY CHILLER NOTE: SIGNED MOD IS 80KSC023FA152 - CORRECTION PENDINGNational Aeronautics and Space Administration$228.6K obligationsEnds Apr 30, 2026
ENGINEERING SERVICES DURING CONSTRUCTION OF SAFETY AND RELIABILITY UPGRADE, KSC INSTITUTIONAL POWER SYSTEMS, PHASE 4, PROJECT CONTROL NUMBER 98966.4.National Aeronautics and Space Administration$302.1K obligationsEnds Jun 30, 2026
SOUTHEAST REGIONAL ARCHITECT AND ENGINEERING DESIGN INDEFINITE DELIVERY INDEFINITE QUANTITY. PROJECT CONTROL NUMBER 99311.National Aeronautics and Space Administration$1.3M obligationsEnds Dec 27, 2028
ARCHITECT-ENGINEER SERVICES, DESIGN LOW VOLTAGE UPGRADES BOOSTER FABRICATION FACILITY: PROJECT CONTROL NUMBER: 99604National Aeronautics and Space Administration$409.1K obligationsEnds Dec 22, 2025
ARCHITECT-ENGINEER SERVICES FOR THE DEVELOPMENT OF A DESIGN PACKAGE (DESIGN-BID-BUILD) FOR THE REFURBISHMENT OF THE BASCULE BRIDGE AT STENNIS SPACE CENTER, MSNational Aeronautics and Space Administration$516.6K obligationsEnds Aug 8, 2025
TASK ORDER 80MSFC24FA112 MSFC REVITALIZE ELECTRICAL SYSTEMS BUILDING 4583 BASE AWARDNational Aeronautics and Space Administration$399.0K obligationsEnds Jul 18, 2025
A&E TASK ORDER FOR ATF STEAM AUGMENTATIONNational Aeronautics and Space Administration$309.1K obligationsEnds Oct 24, 2025
NEAT WP3 ALTITUDE CHAMBERNational Aeronautics and Space Administration$309.9K obligationsEnds Jun 13, 2025
ENGINEERING SERVICES DURING THE CONSTRUCTION OF BOOSTER FABRICATION FACILITY (BFF) SWITCHGEAR REPLACEMENT - SUBSTATIONS 1114, 1115, AND 1116National Aeronautics and Space Administration$278.3K obligationsEnds Jun 30, 2026
ATF HV ARC FLASHNational Aeronautics and Space Administration$285.7K obligationsEnds Feb 28, 2025
ATF LV AFA - ARC FLASH PHASE 2National Aeronautics and Space Administration$396.7K obligationsEnds Jul 31, 2025
A/E SERVICES - ISP STEAM PIPE FLEXIBILITY ANALYSIS PHASE IINational Aeronautics and Space Administration$194.3K obligationsEnds May 31, 2024
LV ARC FLASH ANALYSIS PHASE 1National Aeronautics and Space Administration$1.0M obligationsEnds Dec 31, 2024
NASA TIERED MAINTENANCE PH IIINational Aeronautics and Space Administration$1.6M obligationsEnds Dec 31, 2024
B301 LN2 STORAGENational Aeronautics and Space Administration$435.4K obligationsEnds Jan 31, 2025
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) FOR SAFETY AND RELIABILITY UPGRADE, KSC INSTITUTIONAL POWER SYSTEMS, PHASE 5, KSC, FLNational Aeronautics and Space Administration$321.6K obligationsEnds Jul 28, 2027