Explore federal awards
Date filters select awards with transaction activity in the period. Amounts below are lifetime award obligations. IDV values remain separate.
Export these results to CSV · 16 matching records
SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO DO A PUMP HOUSE ALTERNATIVES STUDY AT THE ROTATION, PROCESSING, AND SURGE FACILITY (RPSF) AT KENNEDY SPACE CENTER…National Aeronautics and Space Administration$507.0K obligationsEnds Sep 30, 2026
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF INTERIOR RENOVATIONS AT THE BOOSTER FABRICATION FACILITY (BFF), KSC, FLNational Aeronautics and Space Administration$1.1M obligationsEnds Dec 25, 2026
COMPRESSOR 9 DESIGN-BUILD REQUEST FOR PROPOSAL AND FUNCTIONAL REQUIREMENTS DOCUMENTNational Aeronautics and Space Administration$288.1K obligationsEnds Sep 30, 2026
A/E DESIGNDepartment of Commerce$106.5K obligationsEnds Oct 31, 2024
ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF THE CONSTRUCTION OF SAFETY AND RELIABILITY UPGRADE, KSC INSTITUTIONAL POWER SYSTEMS, PHASE 4A, PROJECT CONTROL NUMBER (PCN)…National Aeronautics and Space Administration$187.1K obligationsEnds Apr 15, 2026
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF SAFETY AND RELIABILITY UPGRADES, KSC INSTITUTIONAL POWER SYSTEMS, PHASE 6, REVISION A. PROJECT CONTROL NUMBER (PCN) 98996.6National Aeronautics and Space Administration$270.3K obligationsEnds Nov 18, 2028
SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO REVISED NASA UNIFIED FACILITIES GUIDE SPECIFICATION (UFGS) SECTIONS VARIOUS DISCIPLINES AT KENNEDY SPACE CENTER, FLORIDANational Aeronautics and Space Administration$212.8K obligationsEnds Jun 23, 2026
ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF REPLACE SS-1113 A/B AT THE BOOSTER FABRICATION FACILITY CHILLER NOTE: SIGNED MOD IS 80KSC023FA152 - CORRECTION PENDINGNational Aeronautics and Space Administration$228.6K obligationsEnds Apr 30, 2026
ENGINEERING SERVICES DURING CONSTRUCTION OF SAFETY AND RELIABILITY UPGRADE, KSC INSTITUTIONAL POWER SYSTEMS, PHASE 4, PROJECT CONTROL NUMBER 98966.4.National Aeronautics and Space Administration$302.1K obligationsEnds Jun 30, 2026
SOUTHEAST REGIONAL ARCHITECT AND ENGINEERING DESIGN INDEFINITE DELIVERY INDEFINITE QUANTITY. PROJECT CONTROL NUMBER 99311.National Aeronautics and Space Administration$1.3M obligationsEnds Dec 27, 2028
ARCHITECT-ENGINEER SERVICES, DESIGN LOW VOLTAGE UPGRADES BOOSTER FABRICATION FACILITY: PROJECT CONTROL NUMBER: 99604National Aeronautics and Space Administration$409.1K obligationsEnds Dec 22, 2025
CONDUCT A VISUAL INSPECTION OF ALL COMPONENTS (E.G. STRUCTURAL, CIVIL, MECHANICAL, PLUMBING AND ELECTRICAL) FOR EACH ASSET IN APPENDIX I. IDENTIFY AND DOCUMENT CURRENT CONDITION…Department of the Interior$149.2K obligationsEnds Jun 26, 2026
THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND TRAVEL TO PERFORM A CONDITION ASSESSMENT (CA) AT GEORGE WASHINGTON NATIONAL PARKWAY & NATIONAL MALL & MEMORIAL PARKS (NPS)…Department of the Interior$180.5K obligationsEnds Dec 31, 2025
A&E TASK ORDER FOR ATF STEAM AUGMENTATIONNational Aeronautics and Space Administration$309.1K obligationsEnds Oct 24, 2025
ENGINEERING SERVICES DURING THE CONSTRUCTION OF BOOSTER FABRICATION FACILITY (BFF) SWITCHGEAR REPLACEMENT - SUBSTATIONS 1114, 1115, AND 1116National Aeronautics and Space Administration$278.3K obligationsEnds Jun 30, 2026
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) FOR SAFETY AND RELIABILITY UPGRADE, KSC INSTITUTIONAL POWER SYSTEMS, PHASE 5, KSC, FLNational Aeronautics and Space Administration$321.6K obligationsEnds Jul 28, 2027