Date filters select awards with transaction activity in the period. Amounts below are lifetime award obligations. IDV values remain separate.
(F&E) F11 FUNDED DESIGN CHANGE, SITE SPECIFIC: NORFOLK, VA (ORF) ELD JCN:1302445-18068679, PER ELD.Department of Transportation$6.8K obligationsEnds Nov 10, 2026
EG FUNDED. SITE SURVEY, REPORT AND DESIGN FOR EG PO LED POWER SYSTEM REPLACEMENT PROJECT AT MCCOMB, MS (MCBA) RCAG JCN: 24016488Department of Transportation$30.3K obligationsEnds Oct 31, 2026
F11 FUNDING FOR SALT LAKE CITY (SLC) ATCT/TRACON CPDS MODIFICATIONS REV 1- EQUIPMENT AND INSTALLATION FUNDING JCN: 25013989 VENDOR: WELLS GLOBAL LLCDepartment of Transportation$5.1M obligationsEnds Dec 31, 2026
DESIGN FOR THE CRITICAL POWER DISTRIBUTION SYSTEM AT WASHINGTON DC (DCA) ATCT.Department of Transportation$174.1K obligationsEnds Apr 30, 2027
F35 FUNDING FOR INSTALLATION FOR CHICAGO (ORD) ATCT CPDS PHASE II REV 1 JCN# 1401417Department of Transportation$9.5M obligationsEnds Dec 30, 2026
CRITICAL POWER DISTRIBUTION SYSTEM (CPDS) MODERNIZATION PROJECT AT WARRENTON COMMAND CENTER (DCC). JCN: 25015989Department of Transportation$347.4K obligationsEnds Dec 8, 2026
SAMPSON, NC - RCAG SHELTER & TOWER INSTALL IN SAMPSON, NC IN ACCORDANCE WITH THE SOW AND DRAWINGS.Department of Transportation$880.8K obligationsEnds Apr 30, 2027
EG SITE SURVEY TRAVEL AND REPORT FUNDING FOR OCEANA, VA (QVR) ARSR JCN: 26003415Department of Transportation$94.6K obligationsEnds Dec 31, 2026
F11 FUNDING FOR NEMC EG REPLACEMENT COST FOR ATLN CPDS. JCN 1700177.Department of Transportation$6.6M obligationsEnds Apr 15, 2027
ACEPS TYPE II PHASE 2 INSTALLATIONDepartment of Transportation$16.6M obligationsEnds Sep 30, 2026
BIL: ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF OUTDOOR EG WITH SUBBASE TANK AND ERMS AT COVINGTON, KY (CJN) ALS, JCN: 1503033Department of Transportation$13.1K obligationsEnds Aug 7, 2026
REPLACE VOR WITH DME SHELTER & ANTENNA AT THE NATCHEZ, MS (HEZ) DME IN ACCORDANCE WITH THE SPECS AND DRAWINGS.Department of Transportation$602.6K obligationsEnds Nov 5, 2026
ENGINEERING SUPPORT FACILITY (ESF) FOR INITIAL TRAINING ON NEW EQUIPMENT BEING DEPLOYED IN THE NAS - FUNDING FOR OPTION 4 YEAR FLOOR SPACE AND UTILITIESDepartment of Transportation$275.5K obligationsEnds May 11, 2027
ZTL ACEPS II PHASE 2 STANDBY POWER SYSTEM MODIFICATION, DESIGN AND INSTALLATIONDepartment of Transportation$8.4M obligationsEnds Feb 18, 2027
BIL (SCT) TRACON - ASCO REPLACEMENT IDIQ INSTALLATION, PER VENDOR PROPOSAL #163-2024, DATED 8/26/24.Department of Transportation$111.1K obligationsEnds Jul 31, 2026
DALLAS TRACON REPLACE OBSOLETE STATIC SWITCHES AND THE TEST UPS AND BATTERIESDepartment of Transportation$2.0M obligationsEnds Sep 19, 2026
WELLS GLOBAL WILL PROVIDE THE MANPOWER, EQUIPMENT, MATERIALS, TOOLS, AND OTHER NECESSARY RESOURCES TO DELIVER THE PRODUCTS, SERVICES, AND SYSTEMS OUTLINED IN THE ACEPS II PHASE 2…Department of Transportation$1.9M obligationsEnds Jan 25, 2027
(IIJA) ZMP ACEPS II PHASE 1 AND 2 COMBINED, CLINS 00029E, MATERIALS ONLY, TEMP POWER SYSTEM, PHASE 1 TRAINING MATERIALS/BINDERS, CLIN 00029F MATERIALS ONLY, TEMP POWER SYSTEM…Department of Transportation$19.7K obligationsEnds Sep 30, 2027
CONSTRUCTION OF MOBILE POWER UNIT-3 (208V) FOR OEX JCN 22002584Department of Transportation$691.5K obligationsEnds May 30, 2026
(IIJA) FUNDED VOR EMERGENCY RESTORATION, SITE SPECIFIC: NEAH BAY, WA (TOU)VOR, JCN: 18032189, PER ELD PMO. ELD F35 IIJA FUNDED TOU VOR ELD SYSTEM THAT IS DOWN AND OUT OF SERVICE…Department of Transportation$209.2K obligationsEnds Sep 30, 2026
INSTALLATION SERVICES FOR THE HOUSTON ARTCC ACEPS II PHASE IDepartment of Transportation$12.5M obligationsEnds Sep 10, 2026
BIL FUNDS, 2024 DC BUS BASELINE SITE SURVEY, DESIGN, AND INSTALLATION FUNDING FOR JACKSON, TN (MKLA) RCAG JCN: 24015598Department of Transportation$131.0K obligationsEnds Sep 30, 2026
(IIJA) FUNDED SITE SURVEY AND TRAVEL, SITE SPECIFIC: PHILADELPHIA INTERNATIONAL AIRPORT PHILADELPHIA, PA(VII) MALSR, JCN: 25020930, PER ELD PMO.Department of Transportation$0 obligationsEnds Dec 31, 2025
ACEPS TYPE II PHASE 1 SITE SPECIFIC DESIGN, CPC REDUCTION AND INSTALLATION FOR THE KANSAS CITY ARTCCDepartment of Transportation$12.1M obligationsEnds Jun 30, 2026
DEVELOP A SITE-SPECIFIC PERMANENT POWER SYSTEMS INSTALLATION DESIGN PACKAGE FOR THE CLEVELAND ARTCC (ZOB), UTILIZING THE FAA ACEPS TYPE II, PHASE 2 NATIONAL STANDARD DESIGN AS A…Department of Transportation$1.8M obligationsEnds Dec 30, 2026