IAW THE ATTACHED SOW, RENOVATE EXISTING LATRINE/SHOWER, ADD A NEW LATRINE WITH LAUNDRY, REPLACE BROKEN OVERHEAD DOOR, ADD 240V OUTLET, INFILL TWO WINDOWS AND ONE EXTERIOR DOOR…Department of Defense$455.3K obligationsEnds Aug 13, 2026
IAW THE SOW, THE PROJECT CONSISTS OF REPLACING UP THE ENTIRE EXISTING PVC ROOFING SYSTEM WITH NEW 80 MIL ROLLED GOODS PVC FLAT ROOF FROM A SINGLE SOURCE MANUFACTURER WITH A…Department of Defense$542.2K obligationsEnds Apr 27, 2027
IAW THE ATTACHED SOW, THE PROJECT CONSISTS OF REPLACING ALL THE STRAIGHT MISSION BARREL TILE WITH A MINIMUM 50-YEAR MANUFACTURERS LIMITED WARRANTY FOR BUILDING 130 IN ENTIRETY.Department of Defense$1.8M obligationsEnds Jul 23, 2027
IAW WITH ATTACHED SOW: THIS PROJECT WILL UPDATE SEVERAL INTERIOR AND EXTERIOR REPAIRS TO THE MENTIONED RANGE SHED FACILITIESDepartment of Defense$956.2K obligationsEnds Jul 27, 2026
ROOFS REPAIR B2506, 2507, 2509, 385Department of Defense$1.0M obligationsEnds Jun 8, 2026
PROPANE PLANT REPAIRS (PROJECT #44252)Department of Defense$1.5M obligationsEnds Aug 21, 2026
REPLACE ROOFS BLD 2785, 2818, 9049, 9097Department of Defense$2.9M obligationsEnds Apr 27, 2026
CONSTRUCT OH CANOPY LAAF M6141, M6144Department of Defense$668.0K obligationsEnds Jun 22, 2026
THE PROJECT CONSISTS OF REPLACING THE EXISTING FAILING ASPHALT ROOF SYSTEM IN ENTIRETY, REPLACING THE ROTTEN SOFFITS AND FASCIA, REPLACING GUTTER AND DOWNSPOUT SYSTEMS, AND OTHER…Department of Defense$458.8K obligationsEnds Jul 6, 2026
WTC REPAIR TRAINING SHEDSDepartment of Defense$849.8K obligationsEnds May 12, 2026
REPLACEMENT WTC RI TRAINING SHEDDepartment of Defense$229.5K obligationsEnds Jun 30, 2026
MAIDIQ CONSTRUCTION FORT BENNINGDepartment of Defense$271.7K obligationsEnds Feb 27, 2026
REPAIR FIRE ALARM SYSTEM, BARRACKS, B914Department of Defense$1.1M obligationsEnds Feb 13, 2026
IAW THE SCOPE OF WORK: THE OBJECTIVE OFDepartment of Defense$315.5K obligationsEnds Dec 31, 2025
IAW THE ATTACHED SOW: THE OBJECTIVE OF THIS MECHANICAL SCOPE IS TO REPLACE THE EXISTING 2 PIPE BOILER/CHILLER FAN COIL SYSTEM WITH A WATER SOURCE HEAT PUMP SYSTEM.Department of Defense$2.1M obligationsEnds Apr 28, 2026
IAW THE ATTACHED SOW, REPAIR ROADS AT CAMP MERRILLDepartment of Defense$747.8K obligationsEnds Oct 19, 2026
IAW THE SOW ATTACHED: THE PROJECT CONSISTS OF REPLACING THE EXISTING FLAT AND METAL ROOF SYSTEM FOR BUILDING 20 IN ENTIRETY AND TO MAKE NECESSARY REPAIRS OF ALL DEFICIENCIES IN…Department of Defense$385.5K obligationsEnds Jul 3, 2026
REPAIRS TO FOUNTAINS MWH B4Department of Defense$922.0K obligationsEnds Jul 16, 2026
THE OBJECTIVE OF THIS MECHANICAL SCOPE IS TO REPLACE THE EXISTING FIELD CONTROLLERS, COMMUNICATIONS TRUNK AND INTEGRATE ALL POINTS INTO THE UMCS.Department of Defense$336.4K obligationsEnds Aug 4, 2026
IAW SOW: THE OBJECTIVE OF THIS MECHANICAL SCOPE IS TO REMOVE AND INSTALL NEW HVAC EQUIPMENT, INCLUDING (3) AIR HANDLING UNITS, (5) MAKE-UP AIR UNITS, (2) PUMPS, AND ALL HVAC…Department of Defense$1.0M obligationsEnds Aug 4, 2026
IAW THE SOW: THE OBJECTIVE OF THIS MECHANICAL SCOPE IS TO ADD FANS AND EXHAUST TO PROMOTE BETTER AIR MOVEMENT THROUGHOUT THE BUILDING.Department of Defense$912.1K obligationsEnds Jul 6, 2026
REPAIR MOVER TARGET SHEDS CARMOUCHEDepartment of Defense$393.2K obligationsEnds Sep 1, 2025
REPIR HVAC, INSTALL HIGH SPEED DOORS PARDepartment of Defense$394.9K obligationsEnds Oct 1, 2025
IAW THE ATTACHED SOW: THIS PROJECT IS TO REPLACE THE ENTIRE EXISTING FIRE ALARM SYSTEM WITH NEW FIRE ALARM AND MASS NOTIFICATION SYSTEMS IN BUILDING 1051 CDC.Department of Defense$0 obligationsEnds Apr 28, 2025
IAW THE ATTACHED SOW: THE PROJECT CONSISTS OF REPAIRING THE TOWER LOCATED AT PORTER RANGE. THE CONTRACTOR WILL DEMOLISH THE EXISTING TOWER DOWN TO THE BARE METAL STRUCTURAL…Department of Defense$254.3K obligationsEnds May 18, 2026