Federal contract award
GSFC0200208DNAS502105
NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA GODDARD SPACE FLIGHT CENTER |
| NAICS | 541710 |
| PSC | AR23 — SPACE SCIENCE AND APPLICATIONS - ADVANCED DEVELOPMENT |
| Parent award / vehicle | Not reported |
| Set-aside | Not reported |
| Pricing type | COST NO FEE |
| Obligations | $486.7M |
| Current contract value | $466.1M |
| Potential contract value / ceiling | $466.1M |
| Start date | Jul 17, 2002 |
| Current end date | Sep 30, 2027 |
| Potential end date | Sep 30, 2027 |
| Latest award activity | May 13, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 200 of 200 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 13, 2026 | 200 | $0 | OBLIGATE ADDITIONAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE FOR JWST SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM (NIRCAM) |
| Sep 15, 2025 | 199 | $0 | OBLIGATE ADDITIONAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE FOR JWST SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM (NIRCAM) |
| Jul 1, 2025 | 198 | $25.0M | OBLIGATE ADDITIONAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE FOR JWST SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM (NIRCAM) |
| May 8, 2025 | 197 | $1.0M | JWST SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM (NIRCAM) |
| Apr 30, 2025 | 196 | $0 | REMOVAL OF CLAUSES/DRDS IAW PCD-25-01 AND PCD 25-02 - JWST SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM (NIRCAM) |
| Mar 5, 2025 | 195 | $500.0K | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Jul 11, 2024 | 194 | $2.0M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Apr 19, 2024 | 193 | $1.5M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Feb 6, 2024 | 192 | $1.0M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Dec 14, 2023 | 191 | $0 | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Sep 19, 2023 | 190 | $1.0M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Aug 25, 2023 | 189 | $400.0K | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Apr 28, 2023 | 188 | $2.0M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Feb 14, 2023 | 187 | $0 | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Dec 12, 2022 | 186 | $2.0M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Jul 26, 2022 | 185 | $2.0M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| May 24, 2022 | 184 | $4.0M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Dec 27, 2021 | 183 | $1.5M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Dec 2, 2021 | 182 | $0 | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM EO 14042 |
| Aug 12, 2021 | 180 | $2.5M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Apr 2, 2021 | 179 | $2.0M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Jan 12, 2021 | 178 | $0 | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Dec 18, 2020 | 177 | $2.0M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Jul 24, 2020 | 176 | $1.5M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Feb 28, 2020 | 175 | $2.0M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Nov 21, 2019 | 174 | $2.0M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Jul 31, 2019 | 173 | $2.0M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Feb 27, 2019 | 172 | $2.0M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Dec 6, 2018 | 171 | $2.0M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Oct 16, 2018 | 170 | $0 | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Sep 17, 2018 | 169 | $1.0M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Mar 16, 2018 | 168 | $2.0M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Dec 18, 2017 | 167 | $2.0M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Oct 25, 2017 | 166 | $1.0M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Sep 20, 2017 | 165 | $500.0K | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Jun 13, 2017 | 164 | $1.2M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Mar 15, 2017 | 163 | $1.5M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Dec 7, 2016 | 162 | $1.0M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Oct 24, 2016 | 161 | $1.0M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Jun 23, 2016 | 160 | $750.0K | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Apr 13, 2016 | 159 | $1.0M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Feb 11, 2016 | 158 | $1.2M | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Dec 22, 2015 | 157 | $123.0K | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Nov 25, 2015 | 156 | $650.0K | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| Oct 13, 2015 | 155 | $450.0K | SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM |
| May 29, 2015 | 154 | $1.5M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jan 29, 2015 | 153 | $1.5M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Nov 18, 2014 | 152 | $2.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Aug 11, 2014 | 151 | $900.0K | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jul 10, 2014 | 150 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jun 25, 2014 | 149 | $1.5M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Apr 17, 2014 | 148 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Mar 10, 2014 | 147 | $4.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Feb 3, 2014 | 146 | $2.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jan 13, 2014 | 145 | $500.0K | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Dec 2, 2013 | 144 | $2.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Sep 16, 2013 | 143 | $4.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Sep 6, 2013 | 142 | $6.5M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jul 22, 2013 | 141 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| May 17, 2013 | 140 | $6.2M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Apr 3, 2013 | 139 | $4.1M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Feb 25, 2013 | 138 | $9.4M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Feb 1, 2013 | 137 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jan 24, 2013 | 136 | $6.8M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Dec 20, 2012 | 135 | $3.8M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Nov 26, 2012 | 134 | $2.9M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Nov 19, 2012 | 133 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Aug 20, 2012 | 132 | $13.4M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Aug 7, 2012 | 131 | $2.8M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jun 22, 2012 | 130 | $6.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| May 25, 2012 | 129 | $2.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Apr 12, 2012 | 128 | $5.3M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Mar 2, 2012 | 127 | $7.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jan 25, 2012 | 126 | $7.9M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Dec 9, 2011 | 125 | $2.6M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Nov 30, 2011 | 124 | $2.5M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Oct 20, 2011 | 123 | $4.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Sep 22, 2011 | 122 | $7.1M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Sep 6, 2011 | 121 | $1.2M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Aug 11, 2011 | 119 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Aug 11, 2011 | 120 | $1.4M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jun 28, 2011 | 118 | $2.9M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| May 23, 2011 | 117 | $2.9M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| May 10, 2011 | 116 | $2.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Apr 22, 2011 | 115 | $1.7M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Apr 18, 2011 | 114 | $500.0K | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Apr 8, 2011 | 113 | $1.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Mar 24, 2011 | 112 | $2.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Feb 28, 2011 | 111 | $2.5M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Feb 7, 2011 | 110 | $4.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jan 11, 2011 | 109 | $5.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Dec 16, 2010 | 108 | $3.2M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Nov 23, 2010 | 107 | $4.9M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Oct 15, 2010 | 106 | $5.7M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Sep 27, 2010 | 105 | $10.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Aug 9, 2010 | 104 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jul 20, 2010 | 103 | $2.3M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jun 21, 2010 | 102 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jun 10, 2010 | 101 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jun 1, 2010 | 100 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| May 6, 2010 | 99 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Mar 23, 2010 | 98 | $-2.3M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Mar 22, 2010 | 97 | $10.8M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Mar 19, 2010 | 96 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Feb 16, 2010 | 95 | $5.3M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jan 29, 2010 | 94 | $4.5M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jan 11, 2010 | 93 | $5.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Dec 18, 2009 | 92 | $500.0K | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Dec 3, 2009 | 91 | $4.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Nov 13, 2009 | 90 | $4.9M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Oct 13, 2009 | 89 | $4.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Sep 23, 2009 | 87 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Sep 23, 2009 | 88 | $1.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Sep 22, 2009 | 86 | $300.0K | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Sep 21, 2009 | 85 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Aug 13, 2009 | 84 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jul 30, 2009 | 83 | $10.0M | TAS::80 0119::TAS RECOVERY ACT FUNDS NEXT GENERATION SPACE TELESCOPE NIR CAM - PHASE A EFFORT |
| Jul 14, 2009 | 82 | $1.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jun 15, 2009 | 81 | $2.5M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| May 20, 2009 | 80 | $1.5M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Apr 20, 2009 | 79 | $4.1M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Apr 8, 2009 | 78 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Mar 20, 2009 | 77 | $1.5M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Mar 12, 2009 | 76 | $2.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Mar 9, 2009 | 75 | $540.0K | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Feb 18, 2009 | 74 | $900.0K | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Nov 24, 2008 | 73 | $8.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Oct 29, 2008 | 72 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Oct 22, 2008 | 71 | $8.6M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Aug 5, 2008 | 70 | $6.9M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jul 15, 2008 | 69 | $2.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jun 16, 2008 | 68 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jun 6, 2008 | 67 | $2.1M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Apr 18, 2008 | 66 | $6.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Apr 17, 2008 | 65 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Feb 28, 2008 | 64 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jan 30, 2008 | 63 | $8.4M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jan 23, 2008 | 62 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jan 8, 2008 | 61 | $2.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jan 3, 2008 | 60 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Dec 14, 2007 | 59 | $1.1M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Nov 27, 2007 | 58 | $3.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Oct 16, 2007 | 57 | $6.5M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Sep 12, 2007 | 55 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Sep 11, 2007 | 56 | $2.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Aug 1, 2007 | 54 | $0 | NEXT GENERATION SPACE TELESCOPE NIR CAM - PHASE A EFFORT |
| Jul 11, 2007 | 52 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jul 5, 2007 | 53 | $7.2M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| May 31, 2007 | 51 | $3.4M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| May 7, 2007 | 50 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Mar 29, 2007 | 49 | $6.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Mar 15, 2007 | 48 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Feb 22, 2007 | 47 | $4.6M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jan 3, 2007 | 46 | $7.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Nov 30, 2006 | 45 | $3.6M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Oct 30, 2006 | 44 | $4.2M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Oct 10, 2006 | 43 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Aug 17, 2006 | 42 | $1.7M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jun 27, 2006 | 41 | $3.4M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jun 26, 2006 | 40 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jun 12, 2006 | 39 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| May 16, 2006 | 38 | $873.0K | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Mar 27, 2006 | 35 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Mar 22, 2006 | 37 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Mar 2, 2006 | 36 | $7.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Feb 9, 2006 | 34 | $2.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jan 12, 2006 | 33 | $2.4M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Dec 14, 2005 | 32 | $4.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Nov 29, 2005 | 30 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Nov 17, 2005 | 31 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Oct 31, 2005 | 27 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Oct 26, 2005 | 29 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Oct 11, 2005 | 28 | $4.6M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Sep 19, 2005 | 25 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Sep 15, 2005 | 26 | $1.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Aug 5, 2005 | 24 | $1.5M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jul 22, 2005 | 23 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jun 30, 2005 | 22 | $4.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| May 12, 2005 | 20 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| May 12, 2005 | 21 | $1.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Mar 11, 2005 | 19 | $10.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Feb 24, 2005 | 18 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jan 27, 2005 | 17 | $3.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jan 13, 2005 | 16 | $500.0K | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Nov 8, 2004 | 15 | $6.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Aug 11, 2004 | 14 | $5.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jul 21, 2004 | 13 | $1.6M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jun 8, 2004 | 12 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Mar 11, 2004 | 11 | $9.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jan 22, 2004 | 10 | $1.5M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Nov 10, 2003 | 9 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Oct 27, 2003 | 8 | $3.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Sep 17, 2003 | 7 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| May 30, 2003 | 6 | $4.0M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Mar 28, 2003 | 5 | $1.7M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Mar 19, 2003 | 4 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Feb 25, 2003 | 3 | $600.0K | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Feb 5, 2003 | 2 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jan 28, 2003 | 1 | $0 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
| Jul 17, 2002 | 0 | $1.8M | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. |
Estimated positioning window
Nov 1, 2026 – Mar 30, 2027
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2027-09-30 (333 days from calculation)
- +35 points
- 0 historical awards in this buyer and category group
- +0 points
- 200 recorded award transactions
- +10 points
- Latest award action: 2026-05-13
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Review the award scope and buyer evidence before making a bid/no-bid decision.