Federal contract award

GSFC0200208DNAS502105

NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA GODDARD SPACE FLIGHT CENTER
NAICS541710
PSCAR23 — SPACE SCIENCE AND APPLICATIONS - ADVANCED DEVELOPMENT
Parent award / vehicleNot reported
Set-asideNot reported
Pricing typeCOST NO FEE
Obligations$486.7M
Current contract value$466.1M
Potential contract value / ceiling$466.1M
Start dateJul 17, 2002
Current end dateSep 30, 2027
Potential end dateSep 30, 2027
Latest award activityMay 13, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 200 of 200 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 13, 2026200$0OBLIGATE ADDITIONAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE FOR JWST SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM (NIRCAM)
Sep 15, 2025199$0OBLIGATE ADDITIONAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE FOR JWST SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM (NIRCAM)
Jul 1, 2025198$25.0MOBLIGATE ADDITIONAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE FOR JWST SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM (NIRCAM)
May 8, 2025197$1.0MJWST SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM (NIRCAM)
Apr 30, 2025196$0REMOVAL OF CLAUSES/DRDS IAW PCD-25-01 AND PCD 25-02 - JWST SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM (NIRCAM)
Mar 5, 2025195$500.0KSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Jul 11, 2024194$2.0MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Apr 19, 2024193$1.5MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Feb 6, 2024192$1.0MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Dec 14, 2023191$0SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Sep 19, 2023190$1.0MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Aug 25, 2023189$400.0KSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Apr 28, 2023188$2.0MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Feb 14, 2023187$0SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Dec 12, 2022186$2.0MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Jul 26, 2022185$2.0MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
May 24, 2022184$4.0MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Dec 27, 2021183$1.5MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Dec 2, 2021182$0SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM EO 14042
Aug 12, 2021180$2.5MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Apr 2, 2021179$2.0MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Jan 12, 2021178$0SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Dec 18, 2020177$2.0MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Jul 24, 2020176$1.5MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Feb 28, 2020175$2.0MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Nov 21, 2019174$2.0MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Jul 31, 2019173$2.0MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Feb 27, 2019172$2.0MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Dec 6, 2018171$2.0MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Oct 16, 2018170$0SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Sep 17, 2018169$1.0MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Mar 16, 2018168$2.0MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Dec 18, 2017167$2.0MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Oct 25, 2017166$1.0MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Sep 20, 2017165$500.0KSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Jun 13, 2017164$1.2MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Mar 15, 2017163$1.5MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Dec 7, 2016162$1.0MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Oct 24, 2016161$1.0MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Jun 23, 2016160$750.0KSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Apr 13, 2016159$1.0MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Feb 11, 2016158$1.2MSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Dec 22, 2015157$123.0KSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Nov 25, 2015156$650.0KSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
Oct 13, 2015155$450.0KSWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
May 29, 2015154$1.5MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jan 29, 2015153$1.5MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Nov 18, 2014152$2.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Aug 11, 2014151$900.0KNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jul 10, 2014150$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jun 25, 2014149$1.5MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Apr 17, 2014148$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Mar 10, 2014147$4.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Feb 3, 2014146$2.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jan 13, 2014145$500.0KNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Dec 2, 2013144$2.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Sep 16, 2013143$4.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Sep 6, 2013142$6.5MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jul 22, 2013141$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
May 17, 2013140$6.2MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Apr 3, 2013139$4.1MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Feb 25, 2013138$9.4MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Feb 1, 2013137$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jan 24, 2013136$6.8MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Dec 20, 2012135$3.8MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Nov 26, 2012134$2.9MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Nov 19, 2012133$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Aug 20, 2012132$13.4MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Aug 7, 2012131$2.8MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jun 22, 2012130$6.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
May 25, 2012129$2.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Apr 12, 2012128$5.3MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Mar 2, 2012127$7.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jan 25, 2012126$7.9MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Dec 9, 2011125$2.6MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Nov 30, 2011124$2.5MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Oct 20, 2011123$4.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Sep 22, 2011122$7.1MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Sep 6, 2011121$1.2MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Aug 11, 2011119$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Aug 11, 2011120$1.4MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jun 28, 2011118$2.9MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
May 23, 2011117$2.9MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
May 10, 2011116$2.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Apr 22, 2011115$1.7MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Apr 18, 2011114$500.0KNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Apr 8, 2011113$1.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Mar 24, 2011112$2.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Feb 28, 2011111$2.5MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Feb 7, 2011110$4.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jan 11, 2011109$5.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Dec 16, 2010108$3.2MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Nov 23, 2010107$4.9MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Oct 15, 2010106$5.7MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Sep 27, 2010105$10.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Aug 9, 2010104$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jul 20, 2010103$2.3MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jun 21, 2010102$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jun 10, 2010101$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jun 1, 2010100$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
May 6, 201099$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Mar 23, 201098$-2.3MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Mar 22, 201097$10.8MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Mar 19, 201096$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Feb 16, 201095$5.3MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jan 29, 201094$4.5MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jan 11, 201093$5.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Dec 18, 200992$500.0KNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Dec 3, 200991$4.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Nov 13, 200990$4.9MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Oct 13, 200989$4.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Sep 23, 200987$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Sep 23, 200988$1.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Sep 22, 200986$300.0KNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Sep 21, 200985$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Aug 13, 200984$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jul 30, 200983$10.0MTAS::80 0119::TAS RECOVERY ACT FUNDS NEXT GENERATION SPACE TELESCOPE NIR CAM - PHASE A EFFORT
Jul 14, 200982$1.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jun 15, 200981$2.5MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
May 20, 200980$1.5MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Apr 20, 200979$4.1MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Apr 8, 200978$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Mar 20, 200977$1.5MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Mar 12, 200976$2.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Mar 9, 200975$540.0KNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Feb 18, 200974$900.0KNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Nov 24, 200873$8.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Oct 29, 200872$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Oct 22, 200871$8.6MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Aug 5, 200870$6.9MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jul 15, 200869$2.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jun 16, 200868$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jun 6, 200867$2.1MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Apr 18, 200866$6.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Apr 17, 200865$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Feb 28, 200864$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jan 30, 200863$8.4MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jan 23, 200862$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jan 8, 200861$2.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jan 3, 200860$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Dec 14, 200759$1.1MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Nov 27, 200758$3.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Oct 16, 200757$6.5MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Sep 12, 200755$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Sep 11, 200756$2.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Aug 1, 200754$0NEXT GENERATION SPACE TELESCOPE NIR CAM - PHASE A EFFORT
Jul 11, 200752$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jul 5, 200753$7.2MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
May 31, 200751$3.4MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
May 7, 200750$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Mar 29, 200749$6.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Mar 15, 200748$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Feb 22, 200747$4.6MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jan 3, 200746$7.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Nov 30, 200645$3.6MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Oct 30, 200644$4.2MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Oct 10, 200643$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Aug 17, 200642$1.7MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jun 27, 200641$3.4MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jun 26, 200640$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jun 12, 200639$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
May 16, 200638$873.0KNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Mar 27, 200635$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Mar 22, 200637$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Mar 2, 200636$7.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Feb 9, 200634$2.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jan 12, 200633$2.4MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Dec 14, 200532$4.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Nov 29, 200530$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Nov 17, 200531$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Oct 31, 200527$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Oct 26, 200529$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Oct 11, 200528$4.6MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Sep 19, 200525$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Sep 15, 200526$1.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Aug 5, 200524$1.5MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jul 22, 200523$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jun 30, 200522$4.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
May 12, 200520$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
May 12, 200521$1.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Mar 11, 200519$10.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Feb 24, 200518$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jan 27, 200517$3.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jan 13, 200516$500.0KNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Nov 8, 200415$6.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Aug 11, 200414$5.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jul 21, 200413$1.6MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jun 8, 200412$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Mar 11, 200411$9.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jan 22, 200410$1.5MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Nov 10, 20039$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Oct 27, 20038$3.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Sep 17, 20037$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
May 30, 20036$4.0MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Mar 28, 20035$1.7MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Mar 19, 20034$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Feb 25, 20033$600.0KNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Feb 5, 20032$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jan 28, 20031$0NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
Jul 17, 20020$1.8MNEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.

Estimated positioning window

Nov 1, 2026 – Mar 30, 2027

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2027-09-30 (333 days from calculation)
+35 points
0 historical awards in this buyer and category group
+0 points
200 recorded award transactions
+10 points
Latest award action: 2026-05-13
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.