Federal contract award

N0002408C2110

TAS::17 1611::TAS CVN 78 SHIP CONSTRUCTION

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVSEA HQ
NAICS336611 — Ship Building and Repairing
PSC1901 — AIRCRAFT CARRIERS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS INCENTIVE FEE
Obligations$6.7B
Current contract value$6.7B
Potential contract value / ceiling$6.7B
Start dateAug 1, 2008
Current end dateSep 30, 2022
Potential end dateSep 30, 2022
Latest award activityMay 14, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 2,729 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 14, 2026P00311$5.3MCVN 78 SHIP CONSTRUCTION
Apr 15, 2026A02468$0TRANSFER OF GOVERNMENT PROPERTY FROM CVN 78 DETAIL DESIGN AND CONSTRUCTION CONTRACT TO FACILITIES USE CONTRACT
Jun 26, 2025A02467$0CVN 78 SHIP CONSTRUCTION-PERIODIC RELEASE MODIFICATION A02466.
Mar 28, 2025A02466$-887.7KCVN 78 SHIP CONSTRUCTION THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDS NO LONGER REQUIRED ON CLIN 1215 SLIN 21 AND ON CLIN 1313 SLIN 09.
Feb 13, 2025P00310$3.0MCVN 78 SHIP CONSTRUCTION
Jan 13, 2025P00309$2.5MCVN 78 SHIP CONSTRUCTION
Oct 23, 2024P00308$1.7MCVN 78 SHIP CONSTRUCTION
Sep 23, 2024P00307$4.0MCVN 78 SHIP CONSTRUCTION
Sep 11, 2024P00306$2.0MCVN 78 SHIP CONSTRUCTION
May 23, 2024A02465$0CVN 78 SHIP CONSTRUCTION - PERIODIC RELEASE MODIFICATION
Mar 28, 2024A02464$-375.3KSHIP CONSTRUCTION
Mar 14, 2024A02463$-3.7MSHIP CONSTRUCTION
Jan 17, 2024A02462$0CVN 78 SHIP CONSTRUCTION
Jan 16, 2024P00304$-144.4KCVN 78 SHIP CONSTRUCTION
Dec 18, 2023AZ0071$0CVN 78 SHIP CONSTRUCTION
Nov 2, 2023A02461$0SHIP CONSTRUCTION
Oct 12, 2023P00303$0CVN 78 SHIP CONSTRUCTION
Sep 25, 2023P00302$287.0KCVN 78 SHIP CONSTRUCTION
Sep 19, 2023P00301$-700.0KCVN 78 SHIP CONSTRUCTION
Aug 31, 2023AZ0070$0CVN 78 SHIP CONSTRUCTION
Aug 23, 2023A02460$0CVN 78 SHIP CONSTRUCTION
Aug 23, 2023AZ0069$0CVN 78 SHIP CONSTRUCTION
Aug 21, 2023AZ0067$0CVN 78 SHIP CONSTRUCTION
Aug 21, 2023AZ0068$0CVN 78 SHIP CONSTRUCTION
Aug 16, 2023A02459$0CVN 78 SHIP CONSTRUCTION
Aug 7, 2023A02457$55.3KCVN 78 SHIP CONSTRUCTION
Aug 7, 2023A02458$0CVN 78 SHIP CONSTRUCTION
Aug 4, 2023A02455$0CVN 78 SHIP CONSTRUCTION
Aug 4, 2023A02456$1.6MCVN 78 SHIP CONSTRUCTION
Aug 2, 2023A02454$8.0MCVN 78 SHIP CONSTRUCTION
Jul 10, 2023P00300$0CVN 78 DETAIL DESIGN AND CONSTRUCTION - BILL FEE ADJUSTMENT
May 30, 2023A02453$0CVN 78 SHIP CONSTRUCTION
Mar 1, 2023AZ0066$0CVN 78 SHIP CONSTRUCTION
Nov 22, 2022A02452$0CVN 78 SHIP CONSTRUCTION
Nov 14, 2022AZ0064$0CVN 78 SHIP CONSTRUCTION
Nov 14, 2022AZ0065$0CVN 78 SHIP CONSTRUCTION
Oct 31, 2022A02451$0CVN 78 SHIP CONSTRUCTION
Oct 13, 2022A02450$0CVN 78 SHIP CONSTRUCTION
Oct 11, 2022A02449$0CVN 78 SHIP CONSTRUCTION
Aug 17, 2022A02448$1.8KCVN 78 SHIP CONSTRUCTION
Aug 1, 2022P00299$-12.0KCVN 78 DE-OBLIGATE FUNDING FROM CLIN 0208
Jul 14, 2022A02447$0CVN 78 SHIP CONSTRUCTION MATERIAL TRANSFER TO CVN 80
Jun 27, 2022A02446$135.3KCVN 78 SHIP CONSTRUCTION
Jun 9, 2022P00298$500.0KCVN 78 OBLIGATE FUNDING TO CLIN 0001
May 19, 2022P00297$749.1KCVN 78 OBLIGATE FUNDING TO CLIN 0001
Apr 18, 2022A02445$-749.1KCVN 78 SHIP CONSTRUCTION
Apr 1, 2022A02444$0CVN 78 SHIP CONSTRUCTION
Feb 25, 2022P00296$967.9KDATE EXTENSION FOR RDT&E ENGINEERING UNDER CLIN 0209. OBLIGATE FUNDING TO CLIN 0001.
Feb 24, 2022A02443$0CVN 78 SHIP CONSTRUCTION
Feb 23, 2022A02442$0CVN 78 SHIP CONSTRUCTION
Feb 22, 2022A02441$0CVN 78 SHIP CONSTRUCTION
Jan 4, 2022A02440$0CVN 78 SHIP CONSTRUCTION
Dec 22, 2021A02439$0CVN 78 SHIP CONSTRUCTION
Dec 16, 2021P00295$0DELIVERY EXTENSION FOR CLIN 0209
Dec 7, 2021A02438$0CVN 78 SHIP CONSTRUCTION
Nov 29, 2021A02437$0CVN 78 SHIP CONSTRUCTION
Nov 15, 2021P00294$0CVN 78 SHIP CONSTRUCTION
Oct 29, 2021AZ0063$0CVN 78 SHIP CONSTRUCTION
Oct 29, 2021P00293$8.5MOBLIGATE FUNDING TO CLIN 0001, CLIN 0306, CLIN 0909, AND CLIN 1314 EXTEND THE PERIOD OF PERFORMANCE FOR CLIN 0306
Oct 28, 2021AZ0062$629.0KCVN 78 SHIP CONSTRUCTION
Oct 22, 2021AZ0061$1.7MCVN 78 SHIP CONSTRUCTION
Oct 21, 2021AZ0060$714.9KCVN 78 SHIP CONSTRUCTION
Oct 20, 2021AZ0059$0CVN 78 SHIP CONSTRUCTION
Oct 14, 2021AZ0058$0CVN 78 SHIP CONSTRUCTION
Oct 13, 2021P00291$123.0KFUNDING TO CLIN 0306
Oct 5, 2021AZ0057$0CVN 78 SHIP CONSTRUCTION
Oct 4, 2021A02436$0CVN 78 SHIP CONSTRUCTION
Sep 16, 2021AZ0056$5.5MCVN 78 SHIP CONSTRUCTION
Sep 10, 2021A02435$0CVN 78 SHIP CONSTRUCTION
Sep 2, 2021P00290$1.1MESTABLISH CLIN 0209 AND FUND CLIN 0208 AND CLIN 209
Sep 1, 2021AZ0055$870.7KCVN 78 SHIP CONSTRUCTION
Sep 1, 2021P00289$0CLIN 1111 BILL FEE ADJUSTMENT
Aug 24, 2021P00288$3.0MCVN 78 SHIP CONSTRUCTION
Aug 8, 2021AZ0054$0CVN 78 SHIP CONSTRUCTION
Jul 27, 2021P00287$2.5MCVN 78 SHIP CONSTRUCTION
Jul 12, 2021A02434$30.0KCVN 78 SHIP CONSTRUCTION
Jul 2, 2021AZ0053$0CVN 78 SHIP CONSTRUCTION
Jun 24, 2021AZ0052$0CVN 78 SHIP CONSTRUCTION
Jun 21, 2021A02433$110.0KCVN 78 SHIP CONSTRUCTION
Jun 2, 2021P00286$405.0KINCREMENTAL FUNDING TO CLIN 0208
Jun 1, 2021AZ0051$0CVN 78 SHIP CONSTRUCTION
May 28, 2021A02431$361.6KCVN 78 SHIP CONSTRUCTION
May 28, 2021A02432$2.5KCVN 78 SHIP CONSTRUCTION
May 26, 2021AZ0050$0CVN 78 SHIP CONSTRUCTION
May 6, 2021AZ0049$0CVN 78 SHIP CONSTRUCTION
Apr 30, 2021P00285$847.8KINCREMENTAL FUNDING TO CLIN 0208 AND EXTEND LINE ITEM 0306.
Apr 27, 2021P00284$315.7KFUNDING CLIN 0306
Apr 23, 2021A02430$12.0KCVN 78 SHIP CONSTRUCTION
Apr 23, 2021AZ0048$0CVN 78 SHIP CONSTRUCTION
Apr 21, 2021A02429$20.0KCVN 78 SHIP CONSTRUCTION
Apr 20, 2021AZ0047$84.3KCVN 78 SHIP CONSTRUCTION
Apr 15, 2021A02428$136.0KCVN 78 SHIP CONSTRUCTION - 0406 CLIN MATERIAL TIS
Apr 6, 2021A02427$138.2KCVN 78 SHIP CONSTRUCTION
Mar 23, 2021AZ0046$379.4KCVN 78 SHIP CONSTRUCTION
Mar 17, 2021AZ0045$0CVN 78 SHIP CONSTRUCTION
Mar 16, 2021A02426$0CVN 78 SHIP CONSTRUCTION
Mar 11, 2021A02425$1.8KCVN 78 SHIP CONSTRUCTION
Mar 3, 2021A02424$72.5KCVN 78 SHIP CONSTRUCTION
Feb 24, 2021P00281$698.0KFUNDING CLIN 0208 ENGINEERING SUPPORT
Feb 23, 2021AZ0044$195.0KCVN 78 SHIP CONSTRUCTION
Feb 19, 2021A02423$37.5KCVN 78 SHIP CONSTRUCTION
Feb 18, 2021A02422$458.1KCVN 78 SHIP CONSTRUCTION
Feb 10, 2021A02421$11.4KCVN 78 SHIP CONSTRUCTION
Feb 3, 2021P00279$6.9MCVN 78 SHIP CONSTRUCTION
Jan 28, 2021A02420$320.8KCVN 78 SHIP CONSTRUCTION
Jan 13, 2021A02419$34.3KCVN 78 SHIP CONSTRUCTION
Dec 17, 2020A02418$500.0KCVN 78 DD&C PSA/SRA FMR 2120.02 INCREASE FUNDING TO SUPPORT LEAD MAINTENANCE ACTIVITIES
Dec 17, 2020AZ0043$0CVN 78 SHIP CONSTRUCTION
Dec 16, 2020A02417$3.5KCVN 78 SHIP CONSTRUCTION
Dec 14, 2020A02416$213.3KCVN 78 SHIP CONSTRUCTION
Dec 11, 2020A02415$321.0KCVN 78 SHIP CONSTRUCTION
Dec 9, 2020A02414$160.8KCVN 78 SHIP CONSTRUCTION
Dec 4, 2020A02413$64.0KCVN 78 SHIP CONSTRUCTION
Nov 16, 2020P00276$0CVN 78 SHIP CONSTRUCTION
Nov 13, 2020AZ0042$0CVN 78 SHIP CONSTRUCTION
Oct 21, 2020AZ0041$0CVN 78 SHIP CONSTRUCTION
Oct 16, 2020P00275$0REALIGN R&D FUNDED DESIGN DEVELOPMENT HOURS, ESTIMATED COST, AND FIXED FEE FUNDING FROM 0207 TO 0208 AND PROVIDE FUNDS TO NEW SLINS 020804, 020805, AND 020806.
Sep 30, 2020P00273$0REALIGN R&D FUNDED DESIGN DEVELOPMENT HOURS, ESTIMATED COST, AND FIXED FEE FUNDING FROM CLIN 0206 TO 0207 AND REVISING 0003 POP.
Sep 30, 2020P00274$1.4MOBLIGATE FUNDING ON CLIN 0001.
Sep 24, 2020A02412$527.8KCVN 78 SHIP CONSTRUCTION
Sep 23, 2020A02411$8.1MCVN 78 SHIP CONSTRUCTION
Sep 22, 2020A02410$372.4KCVN 78 SHIP CONSTRUCTION
Sep 21, 2020AZ0040$1.7MCVN 78 SHIP CONSTRUCTION
Sep 18, 2020A02409$2.1MCVN 78 SHIP CONSTRUCTION
Sep 17, 2020A02408$8.6KCVN 78 SHIP CONSTRUCTION
Sep 16, 2020A02407$1.3MCVN 78 SHIP CONSTRUCTION
Sep 13, 2020P00271$5.8MCVN 78 SHIP CONSTRUCTION
Sep 10, 2020A02405$2.8MCVN 78 SHIP CONSTRUCTION
Sep 10, 2020A02406$70.6KCVN 78 SHIP CONSTRUCTION
Sep 9, 2020A02404$1.7MCVN 78 SHIP CONSTRUCTION
Sep 9, 2020AZ0038$0CVN 78 SHIP CONSTRUCTION
Sep 9, 2020AZ0039$0CVN 78 SHIP CONSTRUCTION
Sep 8, 2020AZ0037$0CVN 78 SHIP CONSTRUCTION
Jul 30, 2020P00268$-2.2MCVN 78 SHIP CONSTRUCTION
Jul 29, 2020AZ0036$352.3KCVN 78 SHIP CONSTRUCTION
Jul 13, 2020P00267$0CVN 78 SHIP CONSTRUCTION ENGINEERING SUPPORT DEOBLIGATION AND OBLIGATION
Jul 9, 2020A02403$719.8KCVN 78 SHIP CONSTRUCTION
Jun 30, 2020A02401$459.8KCVN 78 SHIP CONSTRUCTION
Jun 30, 2020A02402$559.6KCVN 78 SHIP CONSTRUCTION
Jun 26, 2020A02400$265.0KCVN 78 SHIP CONSTRUCTION
Jun 25, 2020A02398$207.7KCVN 78 SHIP CONSTRUCTION
Jun 25, 2020A02399$209.0KCVN 78 SHIP CONSTRUCTION
Jun 24, 2020A02397$21.5KCVN 78 SHIP CONSTRUCTION
Jun 22, 2020A02396$909.6KCVN 78 SHIP CONSTRUCTION
Jun 17, 2020AZ0035$0CVN 78 SHIP CONSTRUCTION
Jun 12, 2020P00266$616.1KADDITIONAL TEST MATERIAL AND FUNDING TO SUPPORT CVN 78 TESTING.
Jun 10, 2020A02395$-343.8KCVN 78 SHIP CONSTRUCTION
Jun 8, 2020A02394$82.7KCVN 78 SHIP CONSTRUCTION
May 28, 2020A02392$420.3KCVN 78 SHIP CONSTRUCTION
May 26, 2020AZ0034$0CVN 78 SHIP CONSTRUCTION
Apr 21, 2020AZ0033$1.7MCVN 78 SHIP CONSTRUCTION
Apr 16, 2020A02391$515.2KCVN 78 SHIP CONSTRUCTION
Apr 15, 2020A02390$945.5KCVN 78 SHIP CONSTRUCTION
Apr 13, 2020A02388$884.5KCVN 78 SHIP CONSTRUCTION
Apr 13, 2020A02389$366.6KCVN 78 SHIP CONSTRUCTION
Mar 27, 2020A02387$0CVN 78 SHIP CONSTRUCTION
Mar 20, 2020A02386$41.6KCVN 78 SHIP CONSTRUCTION
Mar 11, 2020AZ0032$0CVN 78 SHIP CONSTRUCTION
Mar 10, 2020A02385$127.5KCVN 78 SHIP CONSTRUCTION
Mar 3, 2020A02384$10.3KCVN 78 SHIP CONSTRUCTION
Feb 6, 2020A02383$50.0KCVN 78 SHIP CONSTRUCTION
Feb 4, 2020AZ0031$0CVN 78 SHIP CONSTRUCTION
Jan 28, 2020A02382$1.3KCVN 78 SHIP CONSTRUCTION
Jan 24, 2020A02381$152.1KCVN 78 SHIP CONSTRUCTION
Jan 16, 2020P00259$500.0KCVN 78 SHIP CONSTRUCTION
Dec 18, 2019P00257$112.0KFUND SLIN 020607 $112K
Dec 12, 2019AZ0030$0CVN 78 SHIP CONSTRUCTION
Dec 11, 2019AZ0029$0CVN 78 SHIP CONSTRUCTION
Dec 9, 2019A02380$0CVN 78 SHIP CONSTRUCTION
Nov 27, 2019P00253$0CVN 78 SHIP CONSTRUCTION
Nov 21, 2019A02378$1.3MCVN 78 SHIP CONSTRUCTION
Nov 21, 2019A02379$434CVN 78 SHIP CONSTRUCTION
Nov 15, 2019A02376$161.7KCVN 78 SHIP CONSTRUCTION
Nov 15, 2019A02377$20.3KCVN 78 SHIP CONSTRUCTION
Nov 15, 2019AZ0028$854.9KCVN 78 SHIP CONSTRUCTION
Nov 14, 2019A02375$489.4KCVN 78 SHIP CONSTRUCTION
Oct 31, 2019A02374$2.5MCVN 78 SHIP CONSTRUCTION
Oct 28, 2019A02373$190.6KCVN 78 SHIP CONSTRUCTION
Oct 25, 2019AZ0027$0CVN 78 SHIP CONSTRUCTION
Oct 24, 2019A02372$55.2KCVN 78 SHIP CONSTRUCTION
Oct 9, 2019A02371$50.7KCVN 78 SHIP CONSTRUCTION
Sep 30, 2019A02370$31.3KCVN 78 SHIP CONSTRUCTION
Sep 27, 2019A02369$114.8KCVN 78 SHIP CONSTRUCTION
Sep 26, 2019P00245$1.4MCVN 78 SHIP CONSTRUCTION
Sep 25, 2019A02366$300.0KCVN 78 SHIP CONSTRUCTION
Sep 25, 2019A02367$11.6KCVN 78 SHIP CONSTRUCTION
Sep 25, 2019A02368$54.1KCVN 78 SHIP CONSTRUCTION
Sep 20, 2019A02365$29.7KCVN 78 SHIP CONSTRUCTION
Sep 20, 2019P00244$394.0KCVN 78 SHIP CONSTRUCTION
Sep 19, 2019A02364$32.7KCVN 78 SHIP CONSTRUCTION
Sep 18, 2019A02363$852CVN 78 SHIP CONSTRUCTION
Sep 18, 2019AZ0026$171.7KCVN 78 SHIP CONSTRUCTION
Sep 17, 2019A02361$128.3KCVN 78 SHIP CONSTRUCTION
Sep 17, 2019A02362$19.2KCVN 78 SHIP CONSTRUCTION
Sep 13, 2019A02359$17.0KCVN 78 SHIP CONSTRUCTION
Sep 13, 2019A02360$7.3KCVN 78 SHIP CONSTRUCTION
Sep 12, 2019A02357$22.9KCVN 78 SHIP CONSTRUCTION
Sep 12, 2019A02358$408.9KCVN 78 SHIP CONSTRUCTION
Sep 11, 2019A02356$463.8KCVN 78 SHIP CONSTRUCTION
Sep 11, 2019P00242$200.0KTRANSFER UNUSED LOE FROM 0303 TO 0306, OBLIGATE FUNDS UNDER 0306