Federal contract award
N0002411C2300
BASIC AWARD
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | SUP OF SHIPBUILDING CONV AND REPAIR |
| NAICS | 336611 — Ship Building and Repairing |
| PSC | 1905 — Combat Ships and Landing Vessels |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIXED PRICE INCENTIVE |
| Obligations | $5.0B |
| Current contract value | $5.0B |
| Potential contract value / ceiling | $5.8B |
| Start date | Dec 29, 2010 |
| Current end date | Dec 31, 2026 |
| Potential end date | Dec 31, 2026 |
| Latest award activity | May 27, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 200 of 697 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 27, 2026 | A00456 | $0 | LCS 15 RBP - 4Q25 |
| May 6, 2026 | A00455 | $0 | POOL NEGOTIATION 4/28/2026 |
| Apr 23, 2026 | P00229 | $-754.0K | DEOBLIGATION OF UNUSED FUNDS |
| Mar 30, 2026 | P00228 | $0 | LCS 15 REA SETTLEMENT |
| Feb 4, 2026 | A00454 | $0 | RFDS 685A, 691 AND 733 |
| Dec 8, 2025 | P00227 | $-1.0M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Oct 28, 2025 | A00453 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Oct 14, 2025 | P00226 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Sep 17, 2025 | P00225 | $-260.8K | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Aug 8, 2025 | P00224 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Aug 4, 2025 | A00452 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Jun 25, 2025 | P00223 | $4.3M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| May 15, 2025 | P00222 | $-2.1M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| May 9, 2025 | P00221 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| May 8, 2025 | A00451 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| May 1, 2025 | P00220 | $2.8M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Feb 13, 2025 | P00219 | $5.2M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Jan 16, 2025 | A00450 | $-70.8K | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Jan 6, 2025 | P00218 | $-8.5M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Oct 24, 2024 | A00449 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Oct 15, 2024 | A00448 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Oct 8, 2024 | P00217 | $6.0M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Sep 27, 2024 | A00447 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Sep 27, 2024 | P00216 | $6.4M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Sep 24, 2024 | P00215 | $-2.2M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Sep 18, 2024 | P00214 | $3.4M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Aug 23, 2024 | P00213 | $4.6M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Jul 22, 2024 | A00446 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Jul 18, 2024 | AZ0011 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Jun 27, 2024 | P00212 | $2.2M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Jun 4, 2024 | A00445 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| May 8, 2024 | P00211 | $1.6M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Apr 11, 2024 | A00444 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Apr 11, 2024 | P00210 | $1.3M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Apr 2, 2024 | A00443 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Mar 27, 2024 | P00209 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Mar 25, 2024 | P00208 | $6.9M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Mar 18, 2024 | P00207 | $1.8M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Feb 23, 2024 | P00206 | $1.2M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Feb 5, 2024 | P00205 | $-1.7M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Jan 11, 2024 | A00442 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Jan 10, 2024 | P00204 | $2.6M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Dec 21, 2023 | P00203 | $2.8M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Dec 13, 2023 | P00202 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Nov 21, 2023 | P00201 | $1.8M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Nov 8, 2023 | P00200 | $-2.9M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Sep 29, 2023 | AZ0010 | $197.1K | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Sep 27, 2023 | P00198 | $2.5M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Sep 27, 2023 | P00199 | $-1.2M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Sep 25, 2023 | P00197 | $1.2M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Sep 25, 2023 | PZ0020 | $9.5M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Sep 15, 2023 | P00196 | $1.3M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Sep 14, 2023 | A00441 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Aug 24, 2023 | PZ0019 | $2.7M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Aug 11, 2023 | P00195 | $8.8M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Aug 8, 2023 | AZ0009 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Jul 12, 2023 | P00194 | $3.2M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Jul 11, 2023 | A00440 | $11.6M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Jun 29, 2023 | P00193 | $5.8M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Jun 15, 2023 | P00192 | $750.0K | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Jun 8, 2023 | P00191 | $1.8M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Jun 2, 2023 | A00439 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| May 4, 2023 | P00190 | $7.8M | BASIC SEAFRAME CONSTRUCTION SHIP #11 |
| Apr 20, 2023 | PZ0018 | $2.4M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Mar 30, 2023 | A00438 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #11 |
| Mar 28, 2023 | P00189 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #11 |
| Mar 22, 2023 | P00188 | $10.8M | BASIC SEAFRAME CONSTRUCTION SHIP #11 |
| Mar 16, 2023 | P00187 | $779.9K | BASIC SEAFRAME CONSTRUCTION SHIP #11 |
| Mar 10, 2023 | A00437 | $394.8K | BASIC SEAFRAME CONSTRUCTION SHIP #11 |
| Feb 17, 2023 | P00186 | $782.9K | BASIC SEAFRAME CONSTRUCTION SHIP #11 |
| Feb 15, 2023 | P00185 | $-3.1M | BASIC SEAFRAME CONSTRUCTION SHIP #11 |
| Dec 12, 2022 | P00184 | $-2.2M | BASIC SEAFRAME CONSTRUCTION SHIP #11 |
| Dec 9, 2022 | A00436 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #11 |
| Nov 1, 2022 | P00183 | $-1.0M | DEOBS, FUNDING, LM CAGE CODE UPDATE |
| Oct 27, 2022 | A00435 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #11 |
| Oct 6, 2022 | ARZ998 | $0 | BASIC AWARD |
| Oct 5, 2022 | A00434 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #11 |
| Sep 22, 2022 | P00182 | $6.2M | LCS 11 CG FUNDING |
| Aug 31, 2022 | P00181 | $3.0M | LCS DE-OB AND WARRANTY FUNDING |
| Aug 26, 2022 | P00180 | $17.3M | LCS 25 SIF |
| Aug 2, 2022 | A00433 | $-2.2M | BASIC SEAFRAME CONSTRUCTION SHIP #11 |
| Jul 20, 2022 | P00179 | $19.7M | BASIC SEAFRAME CONSTRUCTION SHIP #11 |
| Jun 24, 2022 | A00432 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #11 |
| May 23, 2022 | P00178 | $2.8M | WARRANTY CLIN 0805 FUNDING. |
| Apr 29, 2022 | P00177 | $677.5K | FIRE INSULATION RESOLUTION |
| Apr 15, 2022 | A00431 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #11 |
| Mar 30, 2022 | A00430 | $0 | POP EXTENSION |
| Mar 28, 2022 | P00176 | $925.0K | CLIN 0404 IPDA FUNDING AND POP EXTENSION. |
| Mar 16, 2022 | P00175 | $2.1M | CORRECTION OF DEFECTS FOR LCS 19 |
| Mar 8, 2022 | A00429 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #11 |
| Jan 19, 2022 | P00174 | $1.7M | LCS POST DELIVERY SUPPORT |
| Dec 21, 2021 | A00428 | $64.5K | LCS 25 COSAL INC 3 ORDER |
| Dec 21, 2021 | P00173 | $0 | POST-DELIVERY SUPPORT FOR LCS |
| Dec 16, 2021 | A00426 | $0 | 3RD QUARTER 2021 REVISED BILLING. |
| Dec 16, 2021 | A00427 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #11 |
| Dec 1, 2021 | P00172 | $5.0M | CORRECTION OF DEFECTS FOR LCS 19 |
| Nov 17, 2021 | A00425 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #11 |
| Nov 5, 2021 | A00424 | $0 | POP ADJUSTMENT FOR MATERIAL ORDERS |
| Nov 3, 2021 | A00423 | $0 | RFD-631 |
| Oct 19, 2021 | A00422 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #11 |
| Oct 18, 2021 | P00171 | $1.0M | LCS CONSTRUCTION |
| Oct 1, 2021 | A00421 | $0 | CHANGE ORDER TO BUILD SPECIFICATION |
| Sep 30, 2021 | P00170 | $317.0K | POST DELIVERY SUPPORT FOR LCS SHIPS |
| Sep 21, 2021 | A00420 | $0 | REVISED BILLING 2ND QUARTER 2021 |
| Aug 17, 2021 | P00169 | $2.8M | LCS POST-DELIVERY AVAILABILITY REQUIREMENTS |
| Jul 28, 2021 | P00168 | $0 | DELIVERY TERMS FOR LCS 23 |
| Jul 21, 2021 | A00419 | $0 | RFD 604 611 612 613 |
| Jul 7, 2021 | P00167 | $17.9M | LCS CONFIGURATION MANAGEMENT CHANGES |
| Jul 1, 2021 | A00418 | $0 | BSCN 085 |
| Jun 16, 2021 | P00166 | $2.2M | INCENTIVE FEE FUNDING |
| Jun 15, 2021 | P00165 | $7.1M | FUNDING FOR WARRANTY REPAIRS |
| May 21, 2021 | P00164 | $3.0M | EXERCISE OPTION FOR LCS 25 INDUSTRIAL POST DELIVERY AVAILABILITY SUPPORT |
| May 20, 2021 | A00417 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| May 17, 2021 | A00416 | $0 | RFD-610 |
| May 12, 2021 | A00415 | $0 | RFD 607 |
| May 6, 2021 | A00414 | $0 | LCS 23 QUARTER DECK MATERIAL POP EXTENSION |
| May 3, 2021 | P00163 | $7.8M | CONFIGURATION MANAGEMENT CHANGES |
| Apr 30, 2021 | A00413 | $0 | PCW-1433 |
| Apr 29, 2021 | A00412 | $12.0M | FUNDING PLUS UP. |
| Apr 22, 2021 | A00411 | $0 | 2019 EPA |
| Apr 19, 2021 | A00410 | $125.0K | LCS-25 WATERFRONT CHANGE PROCESS |
| Apr 15, 2021 | P00162 | $0 | ADMINISTRATIVE UPDATE FOR LCS 21 |
| Apr 14, 2021 | A00409 | $0 | 12 REQUEST FOR DEVIATIONS |
| Apr 9, 2021 | A00408 | $0 | PCW-1431 |
| Apr 8, 2021 | A00407 | $466.1K | PCW-1119R5 |
| Apr 7, 2021 | A00406 | $11.8K | PCW-1387 |
| Mar 24, 2021 | P00161 | $7.5M | FUNDING FOR COST-ONLY CORRECTION OF DEFECTS IN SUPPORT OF LCS 19 |
| Mar 18, 2021 | P00160 | $1.5M | OBLIGATE FUNDING, CLARIFY SOW, AND ADD PERIOD OF PERFORMANCE |
| Mar 10, 2021 | A00404 | $0 | PCW-1424 |
| Mar 10, 2021 | A00405 | $0 | RFDS 581 & 583 |
| Feb 16, 2021 | A00403 | $0 | LCS 21 QUARTERDECK MATERIAL POP EXTENSION |
| Feb 2, 2021 | A00402 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Feb 1, 2021 | A00401 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Jan 28, 2021 | A00400 | $0 | RFD 505A |
| Jan 26, 2021 | AZ0008 | $0 | LCS 19 WFCP DEFIN |
| Jan 19, 2021 | A00399 | $0 | RFD 596 |
| Jan 14, 2021 | A00398 | $0 | RFD-534 |
| Jan 13, 2021 | A00397 | $114.2K | PCW-1381 |
| Dec 29, 2020 | P00159 | $6.8M | FUND LCS 21 AND 25 INCENTIVES AND ESTABLISH OPTION WARRANTY CLINS 0801-0804 |
| Dec 17, 2020 | A00396 | $0 | RFD 543 |
| Dec 15, 2020 | A00395 | $131.0K | LCS-23 INCREMENT 3 INITIAL SHIPBOARD SPARES LOADOUT AND LCS-25 QUARTERDECK PROCUREMENT |
| Dec 10, 2020 | A00394 | $0 | RFD 554, 555 |
| Nov 24, 2020 | P00158 | $9.0M | FUNDING FOR REVISED BILLING PRICES |
| Nov 20, 2020 | A00392 | $0 | REVISED BILLING 3Q20 LCS 21-25 |
| Nov 20, 2020 | A00393 | $37.4K | FULLY FUND AND IMPLEMENT PCW-1375 |
| Nov 4, 2020 | A00391 | $0 | RFDS 585, 586, AND 589 |
| Nov 3, 2020 | A00390 | $0 | RFD 580, 582, 588 |
| Oct 21, 2020 | A00389 | $-6.8K | LCS 19 INC 3 CPIR UPDATE |
| Oct 9, 2020 | A00387 | $346.4K | FUNDS CORRECTION TO A00371 |
| Oct 9, 2020 | A00388 | $0 | LCS-21 RFD-558 |
| Oct 5, 2020 | P00157 | $3.8M | OPTION EXERCISE IN SUPPORT OF POST-AWARD AVAILABILITY EFFORTS FOR LCS 23 |
| Sep 23, 2020 | P00156 | $0 | LCS 21 INCENTIVE ADJUSTMENT |
| Sep 22, 2020 | P00155 | $-393.1K | DEOBLIGATE FUNDS AND ADD SECTION 889 PROVISION AND CLAUSE |
| Sep 16, 2020 | A00386 | $0 | 18 REQUEST FOR DEVIATIONS |
| Sep 14, 2020 | A00385 | $1.3M | PCW-1366R2 |
| Sep 11, 2020 | A00383 | $0 | 2Q20 REVISED BILLING |
| Sep 11, 2020 | A00384 | $124.0K | LCS-25 INCREMENT 2 COSAL PROCUREMENT |
| Sep 9, 2020 | A00382 | $48.6K | PCW-1212R1 |
| Aug 25, 2020 | A00380 | $0 | PCW-1432C2 |
| Aug 25, 2020 | A00381 | $0 | POST DELIVERY REVISED BILLING PRICES AND WEIGHTS LCS-5 THROUGH LCS-13. |
| Aug 20, 2020 | A00378 | $2.5M | FUNDING FOR LCS 17 |
| Aug 20, 2020 | A00379 | $0 | PCW-1405R1 AND CLIN 0012BC POP EXTENSION |
| Aug 18, 2020 | A00377 | $0 | RFDS 534&542 |
| Aug 13, 2020 | A00375 | $39.5K | PCW-1378 |
| Aug 13, 2020 | A00376 | $69.7K | LCS-21 PROVISIONED ITEMS ORDER COSAL INCREMENT 3 |
| Aug 11, 2020 | A00374 | $-3.8K | PCW-1335 AND MAKE OR BUY PLAN UPDATE |
| Jul 31, 2020 | AZ0007 | $-86.2K | LCS-17 WATERFRONT CHANGE PROCESS DEFINITIZATION |
| Jul 14, 2020 | P00154 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Jul 6, 2020 | A00373 | $0 | PERIOD OF PERFORMANCE EXTENSION FOR TRS-3D ORDERING CLINS. |
| Jul 2, 2020 | P00153 | $-575.2K | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Jul 1, 2020 | A00372 | $-1.3M | CHANGE ORDER FOR THE OPTIMIZED STERN RAMPS. |
| Jun 24, 2020 | A00371 | $-3.8M | LCS 5 - 13 DD250 SETTLEMENT |
| Jun 11, 2020 | A00369 | $-67.8K | PCWS 1216 AND 1334 |
| May 28, 2020 | P00151 | $-34.8K | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| May 28, 2020 | P00152 | $34.8K | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| May 14, 2020 | A00368 | $0 | FLEX DECKS / LCS 19 AGREEMENT |
| May 14, 2020 | P00150 | $500.0K | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| May 8, 2020 | A00367 | $125.0K | LCS 23 WATERFRONT CHANGE MAX PRICE ESTABLISHMENT |
| May 6, 2020 | A00366 | $72.4K | LCS-23 QUARTERDECK COSAL PROCUREMENT |
| May 5, 2020 | A00365 | $1.0M | LCS 25 INC COSAL PROCUREMENT |
| Apr 30, 2020 | A00364 | $0 | 1ST QUARTER REVISED BILLING PRICE |
| Apr 29, 2020 | A00363 | $225.0K | LCS 17 FUEL PROCUREMENT |
| Apr 29, 2020 | P00149 | $2.5M | LCS 19 SIF AND IIP FUNDING. |
| Apr 15, 2020 | A00362 | $-37.9K | PCW-1333 CONTROL STATION REQUIREMENT |
| Apr 10, 2020 | A00361 | $0 | POST DELIVERY HULLS REVISED BILLING |
| Apr 2, 2020 | A00360 | $724.7K | LCS 11, 13, 15 FUEL PROCUREMENT |
| Mar 19, 2020 | A00359 | $-50.8K | MULTIPLE DEVIATIONS |
| Mar 13, 2020 | A00357 | $105.8K | LCS 23 COSAL INC 2 |
| Mar 13, 2020 | A00358 | $66.7K | GEAR SET STORAGE POP EXTENSION |
| Feb 28, 2020 | A00356 | $-15.9K | RFDS 521-524&532 |
| Feb 26, 2020 | P00148 | $4.6M | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Feb 6, 2020 | A00355 | $0 | 4Q19 REVISED BILLING |
| Jan 30, 2020 | A00354 | $67.1K | LCS 21 QUARTERDECK PROCUREMENT |
| Jan 21, 2020 | A00353 | $0 | TRS-3D COMPONENT PERIOD OF PERFORMANCE EXTENSION |
| Jan 17, 2020 | A00352 | $125.0K | LCS-21 WATERFRONT CHANGE PROCESS MAX PRICE |
| Jan 8, 2020 | P00147 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Jan 7, 2020 | A00351 | $-3.2K | RFD 519, VENDOR RFD FOR PARK MARKING |
| Dec 20, 2019 | A00350 | $0 | 3RD QTR REVISED BILLING |
| Dec 9, 2019 | P00146 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
| Dec 3, 2019 | P00145 | $0 | BASIC SEAFRAME CONSTRUCTION SHIP #1 |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
80/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 80/100. Available recorded signals: 75 points.
- Contract end 2026-12-31 (67 days from calculation)
- +35 points
- 36 historical awards in this buyer and category group
- +15 points
- 697 recorded award transactions
- +10 points
- Latest award action: 2026-05-27
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.