Federal contract award

N0002411C2300

BASIC AWARD

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeSUP OF SHIPBUILDING CONV AND REPAIR
NAICS336611 — Ship Building and Repairing
PSC1905 — Combat Ships and Landing Vessels
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIXED PRICE INCENTIVE
Obligations$5.0B
Current contract value$5.0B
Potential contract value / ceiling$5.8B
Start dateDec 29, 2010
Current end dateDec 31, 2026
Potential end dateDec 31, 2026
Latest award activityMay 27, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 697 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 27, 2026A00456$0LCS 15 RBP - 4Q25
May 6, 2026A00455$0POOL NEGOTIATION 4/28/2026
Apr 23, 2026P00229$-754.0KDEOBLIGATION OF UNUSED FUNDS
Mar 30, 2026P00228$0LCS 15 REA SETTLEMENT
Feb 4, 2026A00454$0RFDS 685A, 691 AND 733
Dec 8, 2025P00227$-1.0MBASIC SEAFRAME CONSTRUCTION SHIP #1
Oct 28, 2025A00453$0BASIC SEAFRAME CONSTRUCTION SHIP #1
Oct 14, 2025P00226$0BASIC SEAFRAME CONSTRUCTION SHIP #1
Sep 17, 2025P00225$-260.8KBASIC SEAFRAME CONSTRUCTION SHIP #1
Aug 8, 2025P00224$0BASIC SEAFRAME CONSTRUCTION SHIP #1
Aug 4, 2025A00452$0BASIC SEAFRAME CONSTRUCTION SHIP #1
Jun 25, 2025P00223$4.3MBASIC SEAFRAME CONSTRUCTION SHIP #1
May 15, 2025P00222$-2.1MBASIC SEAFRAME CONSTRUCTION SHIP #1
May 9, 2025P00221$0BASIC SEAFRAME CONSTRUCTION SHIP #1
May 8, 2025A00451$0BASIC SEAFRAME CONSTRUCTION SHIP #1
May 1, 2025P00220$2.8MBASIC SEAFRAME CONSTRUCTION SHIP #1
Feb 13, 2025P00219$5.2MBASIC SEAFRAME CONSTRUCTION SHIP #1
Jan 16, 2025A00450$-70.8KBASIC SEAFRAME CONSTRUCTION SHIP #1
Jan 6, 2025P00218$-8.5MBASIC SEAFRAME CONSTRUCTION SHIP #1
Oct 24, 2024A00449$0BASIC SEAFRAME CONSTRUCTION SHIP #1
Oct 15, 2024A00448$0BASIC SEAFRAME CONSTRUCTION SHIP #1
Oct 8, 2024P00217$6.0MBASIC SEAFRAME CONSTRUCTION SHIP #1
Sep 27, 2024A00447$0BASIC SEAFRAME CONSTRUCTION SHIP #1
Sep 27, 2024P00216$6.4MBASIC SEAFRAME CONSTRUCTION SHIP #1
Sep 24, 2024P00215$-2.2MBASIC SEAFRAME CONSTRUCTION SHIP #1
Sep 18, 2024P00214$3.4MBASIC SEAFRAME CONSTRUCTION SHIP #1
Aug 23, 2024P00213$4.6MBASIC SEAFRAME CONSTRUCTION SHIP #1
Jul 22, 2024A00446$0BASIC SEAFRAME CONSTRUCTION SHIP #1
Jul 18, 2024AZ0011$0BASIC SEAFRAME CONSTRUCTION SHIP #1
Jun 27, 2024P00212$2.2MBASIC SEAFRAME CONSTRUCTION SHIP #1
Jun 4, 2024A00445$0BASIC SEAFRAME CONSTRUCTION SHIP #1
May 8, 2024P00211$1.6MBASIC SEAFRAME CONSTRUCTION SHIP #1
Apr 11, 2024A00444$0BASIC SEAFRAME CONSTRUCTION SHIP #1
Apr 11, 2024P00210$1.3MBASIC SEAFRAME CONSTRUCTION SHIP #1
Apr 2, 2024A00443$0BASIC SEAFRAME CONSTRUCTION SHIP #1
Mar 27, 2024P00209$0BASIC SEAFRAME CONSTRUCTION SHIP #1
Mar 25, 2024P00208$6.9MBASIC SEAFRAME CONSTRUCTION SHIP #1
Mar 18, 2024P00207$1.8MBASIC SEAFRAME CONSTRUCTION SHIP #1
Feb 23, 2024P00206$1.2MBASIC SEAFRAME CONSTRUCTION SHIP #1
Feb 5, 2024P00205$-1.7MBASIC SEAFRAME CONSTRUCTION SHIP #1
Jan 11, 2024A00442$0BASIC SEAFRAME CONSTRUCTION SHIP #1
Jan 10, 2024P00204$2.6MBASIC SEAFRAME CONSTRUCTION SHIP #1
Dec 21, 2023P00203$2.8MBASIC SEAFRAME CONSTRUCTION SHIP #1
Dec 13, 2023P00202$0BASIC SEAFRAME CONSTRUCTION SHIP #1
Nov 21, 2023P00201$1.8MBASIC SEAFRAME CONSTRUCTION SHIP #1
Nov 8, 2023P00200$-2.9MBASIC SEAFRAME CONSTRUCTION SHIP #1
Sep 29, 2023AZ0010$197.1KBASIC SEAFRAME CONSTRUCTION SHIP #1
Sep 27, 2023P00198$2.5MBASIC SEAFRAME CONSTRUCTION SHIP #1
Sep 27, 2023P00199$-1.2MBASIC SEAFRAME CONSTRUCTION SHIP #1
Sep 25, 2023P00197$1.2MBASIC SEAFRAME CONSTRUCTION SHIP #1
Sep 25, 2023PZ0020$9.5MBASIC SEAFRAME CONSTRUCTION SHIP #1
Sep 15, 2023P00196$1.3MBASIC SEAFRAME CONSTRUCTION SHIP #1
Sep 14, 2023A00441$0BASIC SEAFRAME CONSTRUCTION SHIP #1
Aug 24, 2023PZ0019$2.7MBASIC SEAFRAME CONSTRUCTION SHIP #1
Aug 11, 2023P00195$8.8MBASIC SEAFRAME CONSTRUCTION SHIP #1
Aug 8, 2023AZ0009$0BASIC SEAFRAME CONSTRUCTION SHIP #1
Jul 12, 2023P00194$3.2MBASIC SEAFRAME CONSTRUCTION SHIP #1
Jul 11, 2023A00440$11.6MBASIC SEAFRAME CONSTRUCTION SHIP #1
Jun 29, 2023P00193$5.8MBASIC SEAFRAME CONSTRUCTION SHIP #1
Jun 15, 2023P00192$750.0KBASIC SEAFRAME CONSTRUCTION SHIP #1
Jun 8, 2023P00191$1.8MBASIC SEAFRAME CONSTRUCTION SHIP #1
Jun 2, 2023A00439$0BASIC SEAFRAME CONSTRUCTION SHIP #1
May 4, 2023P00190$7.8MBASIC SEAFRAME CONSTRUCTION SHIP #11
Apr 20, 2023PZ0018$2.4MBASIC SEAFRAME CONSTRUCTION SHIP #1
Mar 30, 2023A00438$0BASIC SEAFRAME CONSTRUCTION SHIP #11
Mar 28, 2023P00189$0BASIC SEAFRAME CONSTRUCTION SHIP #11
Mar 22, 2023P00188$10.8MBASIC SEAFRAME CONSTRUCTION SHIP #11
Mar 16, 2023P00187$779.9KBASIC SEAFRAME CONSTRUCTION SHIP #11
Mar 10, 2023A00437$394.8KBASIC SEAFRAME CONSTRUCTION SHIP #11
Feb 17, 2023P00186$782.9KBASIC SEAFRAME CONSTRUCTION SHIP #11
Feb 15, 2023P00185$-3.1MBASIC SEAFRAME CONSTRUCTION SHIP #11
Dec 12, 2022P00184$-2.2MBASIC SEAFRAME CONSTRUCTION SHIP #11
Dec 9, 2022A00436$0BASIC SEAFRAME CONSTRUCTION SHIP #11
Nov 1, 2022P00183$-1.0MDEOBS, FUNDING, LM CAGE CODE UPDATE
Oct 27, 2022A00435$0BASIC SEAFRAME CONSTRUCTION SHIP #11
Oct 6, 2022ARZ998$0BASIC AWARD
Oct 5, 2022A00434$0BASIC SEAFRAME CONSTRUCTION SHIP #11
Sep 22, 2022P00182$6.2MLCS 11 CG FUNDING
Aug 31, 2022P00181$3.0MLCS DE-OB AND WARRANTY FUNDING
Aug 26, 2022P00180$17.3MLCS 25 SIF
Aug 2, 2022A00433$-2.2MBASIC SEAFRAME CONSTRUCTION SHIP #11
Jul 20, 2022P00179$19.7MBASIC SEAFRAME CONSTRUCTION SHIP #11
Jun 24, 2022A00432$0BASIC SEAFRAME CONSTRUCTION SHIP #11
May 23, 2022P00178$2.8MWARRANTY CLIN 0805 FUNDING.
Apr 29, 2022P00177$677.5KFIRE INSULATION RESOLUTION
Apr 15, 2022A00431$0BASIC SEAFRAME CONSTRUCTION SHIP #11
Mar 30, 2022A00430$0POP EXTENSION
Mar 28, 2022P00176$925.0KCLIN 0404 IPDA FUNDING AND POP EXTENSION.
Mar 16, 2022P00175$2.1MCORRECTION OF DEFECTS FOR LCS 19
Mar 8, 2022A00429$0BASIC SEAFRAME CONSTRUCTION SHIP #11
Jan 19, 2022P00174$1.7MLCS POST DELIVERY SUPPORT
Dec 21, 2021A00428$64.5KLCS 25 COSAL INC 3 ORDER
Dec 21, 2021P00173$0POST-DELIVERY SUPPORT FOR LCS
Dec 16, 2021A00426$03RD QUARTER 2021 REVISED BILLING.
Dec 16, 2021A00427$0BASIC SEAFRAME CONSTRUCTION SHIP #11
Dec 1, 2021P00172$5.0MCORRECTION OF DEFECTS FOR LCS 19
Nov 17, 2021A00425$0BASIC SEAFRAME CONSTRUCTION SHIP #11
Nov 5, 2021A00424$0POP ADJUSTMENT FOR MATERIAL ORDERS
Nov 3, 2021A00423$0RFD-631
Oct 19, 2021A00422$0BASIC SEAFRAME CONSTRUCTION SHIP #11
Oct 18, 2021P00171$1.0MLCS CONSTRUCTION
Oct 1, 2021A00421$0CHANGE ORDER TO BUILD SPECIFICATION
Sep 30, 2021P00170$317.0KPOST DELIVERY SUPPORT FOR LCS SHIPS
Sep 21, 2021A00420$0REVISED BILLING 2ND QUARTER 2021
Aug 17, 2021P00169$2.8MLCS POST-DELIVERY AVAILABILITY REQUIREMENTS
Jul 28, 2021P00168$0DELIVERY TERMS FOR LCS 23
Jul 21, 2021A00419$0RFD 604 611 612 613
Jul 7, 2021P00167$17.9MLCS CONFIGURATION MANAGEMENT CHANGES
Jul 1, 2021A00418$0BSCN 085
Jun 16, 2021P00166$2.2MINCENTIVE FEE FUNDING
Jun 15, 2021P00165$7.1MFUNDING FOR WARRANTY REPAIRS
May 21, 2021P00164$3.0MEXERCISE OPTION FOR LCS 25 INDUSTRIAL POST DELIVERY AVAILABILITY SUPPORT
May 20, 2021A00417$0BASIC SEAFRAME CONSTRUCTION SHIP #1
May 17, 2021A00416$0RFD-610
May 12, 2021A00415$0RFD 607
May 6, 2021A00414$0LCS 23 QUARTER DECK MATERIAL POP EXTENSION
May 3, 2021P00163$7.8MCONFIGURATION MANAGEMENT CHANGES
Apr 30, 2021A00413$0PCW-1433
Apr 29, 2021A00412$12.0MFUNDING PLUS UP.
Apr 22, 2021A00411$02019 EPA
Apr 19, 2021A00410$125.0KLCS-25 WATERFRONT CHANGE PROCESS
Apr 15, 2021P00162$0ADMINISTRATIVE UPDATE FOR LCS 21
Apr 14, 2021A00409$012 REQUEST FOR DEVIATIONS
Apr 9, 2021A00408$0PCW-1431
Apr 8, 2021A00407$466.1KPCW-1119R5
Apr 7, 2021A00406$11.8KPCW-1387
Mar 24, 2021P00161$7.5MFUNDING FOR COST-ONLY CORRECTION OF DEFECTS IN SUPPORT OF LCS 19
Mar 18, 2021P00160$1.5MOBLIGATE FUNDING, CLARIFY SOW, AND ADD PERIOD OF PERFORMANCE
Mar 10, 2021A00404$0PCW-1424
Mar 10, 2021A00405$0RFDS 581 & 583
Feb 16, 2021A00403$0LCS 21 QUARTERDECK MATERIAL POP EXTENSION
Feb 2, 2021A00402$0BASIC SEAFRAME CONSTRUCTION SHIP #1
Feb 1, 2021A00401$0BASIC SEAFRAME CONSTRUCTION SHIP #1
Jan 28, 2021A00400$0RFD 505A
Jan 26, 2021AZ0008$0LCS 19 WFCP DEFIN
Jan 19, 2021A00399$0RFD 596
Jan 14, 2021A00398$0RFD-534
Jan 13, 2021A00397$114.2KPCW-1381
Dec 29, 2020P00159$6.8MFUND LCS 21 AND 25 INCENTIVES AND ESTABLISH OPTION WARRANTY CLINS 0801-0804
Dec 17, 2020A00396$0RFD 543
Dec 15, 2020A00395$131.0KLCS-23 INCREMENT 3 INITIAL SHIPBOARD SPARES LOADOUT AND LCS-25 QUARTERDECK PROCUREMENT
Dec 10, 2020A00394$0RFD 554, 555
Nov 24, 2020P00158$9.0MFUNDING FOR REVISED BILLING PRICES
Nov 20, 2020A00392$0REVISED BILLING 3Q20 LCS 21-25
Nov 20, 2020A00393$37.4KFULLY FUND AND IMPLEMENT PCW-1375
Nov 4, 2020A00391$0RFDS 585, 586, AND 589
Nov 3, 2020A00390$0RFD 580, 582, 588
Oct 21, 2020A00389$-6.8KLCS 19 INC 3 CPIR UPDATE
Oct 9, 2020A00387$346.4KFUNDS CORRECTION TO A00371
Oct 9, 2020A00388$0LCS-21 RFD-558
Oct 5, 2020P00157$3.8MOPTION EXERCISE IN SUPPORT OF POST-AWARD AVAILABILITY EFFORTS FOR LCS 23
Sep 23, 2020P00156$0LCS 21 INCENTIVE ADJUSTMENT
Sep 22, 2020P00155$-393.1KDEOBLIGATE FUNDS AND ADD SECTION 889 PROVISION AND CLAUSE
Sep 16, 2020A00386$018 REQUEST FOR DEVIATIONS
Sep 14, 2020A00385$1.3MPCW-1366R2
Sep 11, 2020A00383$02Q20 REVISED BILLING
Sep 11, 2020A00384$124.0KLCS-25 INCREMENT 2 COSAL PROCUREMENT
Sep 9, 2020A00382$48.6KPCW-1212R1
Aug 25, 2020A00380$0PCW-1432C2
Aug 25, 2020A00381$0POST DELIVERY REVISED BILLING PRICES AND WEIGHTS LCS-5 THROUGH LCS-13.
Aug 20, 2020A00378$2.5MFUNDING FOR LCS 17
Aug 20, 2020A00379$0PCW-1405R1 AND CLIN 0012BC POP EXTENSION
Aug 18, 2020A00377$0RFDS 534&542
Aug 13, 2020A00375$39.5KPCW-1378
Aug 13, 2020A00376$69.7KLCS-21 PROVISIONED ITEMS ORDER COSAL INCREMENT 3
Aug 11, 2020A00374$-3.8KPCW-1335 AND MAKE OR BUY PLAN UPDATE
Jul 31, 2020AZ0007$-86.2KLCS-17 WATERFRONT CHANGE PROCESS DEFINITIZATION
Jul 14, 2020P00154$0BASIC SEAFRAME CONSTRUCTION SHIP #1
Jul 6, 2020A00373$0PERIOD OF PERFORMANCE EXTENSION FOR TRS-3D ORDERING CLINS.
Jul 2, 2020P00153$-575.2KBASIC SEAFRAME CONSTRUCTION SHIP #1
Jul 1, 2020A00372$-1.3MCHANGE ORDER FOR THE OPTIMIZED STERN RAMPS.
Jun 24, 2020A00371$-3.8MLCS 5 - 13 DD250 SETTLEMENT
Jun 11, 2020A00369$-67.8KPCWS 1216 AND 1334
May 28, 2020P00151$-34.8KBASIC SEAFRAME CONSTRUCTION SHIP #1
May 28, 2020P00152$34.8KBASIC SEAFRAME CONSTRUCTION SHIP #1
May 14, 2020A00368$0FLEX DECKS / LCS 19 AGREEMENT
May 14, 2020P00150$500.0KBASIC SEAFRAME CONSTRUCTION SHIP #1
May 8, 2020A00367$125.0KLCS 23 WATERFRONT CHANGE MAX PRICE ESTABLISHMENT
May 6, 2020A00366$72.4KLCS-23 QUARTERDECK COSAL PROCUREMENT
May 5, 2020A00365$1.0MLCS 25 INC COSAL PROCUREMENT
Apr 30, 2020A00364$01ST QUARTER REVISED BILLING PRICE
Apr 29, 2020A00363$225.0KLCS 17 FUEL PROCUREMENT
Apr 29, 2020P00149$2.5MLCS 19 SIF AND IIP FUNDING.
Apr 15, 2020A00362$-37.9KPCW-1333 CONTROL STATION REQUIREMENT
Apr 10, 2020A00361$0POST DELIVERY HULLS REVISED BILLING
Apr 2, 2020A00360$724.7KLCS 11, 13, 15 FUEL PROCUREMENT
Mar 19, 2020A00359$-50.8KMULTIPLE DEVIATIONS
Mar 13, 2020A00357$105.8KLCS 23 COSAL INC 2
Mar 13, 2020A00358$66.7KGEAR SET STORAGE POP EXTENSION
Feb 28, 2020A00356$-15.9KRFDS 521-524&532
Feb 26, 2020P00148$4.6MBASIC SEAFRAME CONSTRUCTION SHIP #1
Feb 6, 2020A00355$04Q19 REVISED BILLING
Jan 30, 2020A00354$67.1KLCS 21 QUARTERDECK PROCUREMENT
Jan 21, 2020A00353$0TRS-3D COMPONENT PERIOD OF PERFORMANCE EXTENSION
Jan 17, 2020A00352$125.0KLCS-21 WATERFRONT CHANGE PROCESS MAX PRICE
Jan 8, 2020P00147$0BASIC SEAFRAME CONSTRUCTION SHIP #1
Jan 7, 2020A00351$-3.2KRFD 519, VENDOR RFD FOR PARK MARKING
Dec 20, 2019A00350$03RD QTR REVISED BILLING
Dec 9, 2019P00146$0BASIC SEAFRAME CONSTRUCTION SHIP #1
Dec 3, 2019P00145$0BASIC SEAFRAME CONSTRUCTION SHIP #1

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2026-12-31 (67 days from calculation)
+35 points
36 historical awards in this buyer and category group
+15 points
697 recorded award transactions
+10 points
Latest award action: 2026-05-27
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.