Federal contract award
N0002411C4407
EXECUTION PLANNING LHD 3 FY11 PMA
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | MID ATLANTIC REG MAINT CTR |
| NAICS | 336611 — Ship Building and Repairing |
| PSC | J998 — Non-nuclear Ship Repair (East) Ship repair (including overhauls and conversions) performed on non-nuclear propelled and nonpropelled ships east of the 108th meridian |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS AWARD FEE |
| Obligations | $865.2M |
| Current contract value | $865.2M |
| Potential contract value / ceiling | $946.6M |
| Start date | Sep 29, 2017 |
| Current end date | Oct 20, 2017 |
| Potential end date | Nov 30, 2017 |
| Latest award activity | Sep 30, 2017 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 200 of 640 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Apr 20, 2023 | A00636 | $-17.3K | USS KEARSARGE (LHD-3) MSMO CONTRACT N00024-11-C-4407 DEOBLIGATION EXCESS FUNDS |
| Jun 9, 2022 | A00635 | $-584.4K | DE-OB OF UNLIQUIDATED BALANCES FROM VARIOUS CLINS IN CONTRACT N0002411C4407 |
| Aug 8, 2021 | A00634 | $-1.7M | ACCOMPLISH LHD 5 FY15 DPMA - DEOB EXCESS FUNDS |
| Dec 17, 2019 | A00633 | $-14.9M | DE-OBLIGATE UNLIQUIDATED ACRN BALANCES FROM LHD CLASS SHIPS |
| Aug 14, 2018 | A00632 | $728.5K | AWARD FEE PAID #8 |
| Jun 28, 2018 | A00631 | $-9.3K | COST AND SCHEDULE INCENTIVE FEE PERIOD EIGHT. AUTHORIZE THE CONTRACTOR TO BILL CIF/SIF; DE-OBLIGATE UNEARNED CIF. |
| Jun 12, 2018 | A00630 | $0 | USS KEARSARGE (LHD-5) 17EM&17CM; PERIOD OF PERFORMANCE EXTENSION. |
| Jan 19, 2018 | A00629 | $266.6K | USS KEARSARGE (LHD-3) 17EM&17CM; SETTLED GROWTH WORK RCCS. |
| Dec 20, 2017 | A00628 | $-317.7K | USS KEARSARGE (LHD-3) DPMA CORRECT PREVIOUS MODIFICATION. |
| Dec 4, 2017 | A00627 | $-70.1K | LHA/LHD COST AND SCHEDULE INCENTIVE FEE PERIOD SEVEN; AUTHORIZE CONTRACTOR TO BILL. ALSO, DE-OBLIGATE UNEARNED COST INCENTIVE FEES. |
| Nov 28, 2017 | A00626 | $294.8K | USS KEARSARGE (LHD-3) 17EM; SETTLED NEW AND GROWTH WORK RCCS. PERIOD OF PERFORMANCE EXTENSION. |
| Nov 20, 2017 | A00625 | $5.5M | AWARD FEE PERIOD SEVEN PAYOUT. |
| Nov 14, 2017 | A00624 | $256.3K | ACCOMPLISH USS WASP (LHD-1) 17CM; CLIN 0415: SUBCLIN 0415BE/BF&0415BG/BH; SETTLED GROWTH AND NEW WORK RCCS |
| Nov 8, 2017 | A00623 | $-25.2K | ACCOMPLISH USS BATAAN (LHD-5) 18 CMAV; CLIN 0627, SUBCLIN 0627BA/BB - SETTLE GROWTH WORK RCC |
| Sep 30, 2017 | A00618 | $125.6K | USS KEARSARGE (LHD-3) 17A2 CMAV; SETTLED NEW AND GROWTH WORK RCCS 11G, 15N&16N. PERIOD OF PERFORMANCE EXTENSION. |
| Sep 30, 2017 | A00619 | $502.8K | USS KEARSARGE (LHD-3) 17EM; SETTLED NEW AND GROWTH WORK RCCS. PERIOD OF PERFORMANCE EXTENSION. |
| Sep 30, 2017 | A00620 | $18.0K | USS BATAAN (LHD-5) 18A2 CMAV; SETTLED NEW WORK RCCS 1N&2N. |
| Sep 30, 2017 | A00621 | $156.5K | USS WASP (LHD-1) 17CM; SETTLED NEW WORK RCCS 150N&151N. PERIOD OF PERFORMANCE EXTENSION. |
| Sep 30, 2017 | A00622 | $87.5K | USS KEARSARGE (LHD-3) 17CM; SETTLED NEW WORK RCCS. |
| Sep 25, 2017 | A00616 | $450.6K | ACCOMPLISH USS WASP (LHD-1) 17CM, CLIN 0415 SUBCLIN 0415BA/BB, SETTLE NEW AND GROWTH WORK RCC |
| Sep 25, 2017 | A00617 | $371.1K | USS KEARSARGE (LHD-3) 17CM; SETTLED NEW AND GROWTH WORK RCCS. |
| Sep 21, 2017 | A00614 | $170.0K | USS KEARSARGE (LHD-3) 17EM; SETTLED GROWTH WORK RCCS. |
| Sep 21, 2017 | A00615 | $356.2K | ACCOMPLISH USS BATAAN (LHD-5) 18A1 CMAV - DEFINITIZATION OF THE ORIGINAL PACKAGE |
| Sep 18, 2017 | A00612 | $244.2K | USS KEARSARGE (LHD-3) 17CM; SETTLED NEW AND GROWTH RCCS. |
| Sep 18, 2017 | A00613 | $20.7K | USS KEARSARGE (LHD-3) 17A2 CMAV; SETTLED GROWTH WORK RCCS 10G, 12G, 13G&14G. |
| Sep 15, 2017 | A00611 | $324.0K | USS WASP (LHD-1) 17CM; SETTLED GROWTH WORK RCCS. |
| Sep 13, 2017 | A00609 | $-1.2M | ACCOMPLISH USS WASP (LHD-1) 17C1 PMA, CLIN 0031 SUBCLIN VARIOUS, SETTLE GROWTH WORK RCC |
| Sep 13, 2017 | A00610 | $0 | ACCOMPLISH USS WASP (LHD-1) 17C1 PMA, CLIN 0031; SUBCLIN VARIOUS, AUTHORIZE CONTRACTOR TO BILL FOR COST AND SCHEDULE INCENTIVE FEE |
| Aug 21, 2017 | A00608 | $153.8K | USS WASP (LHD-1) 17C1 PMA; OBLIGATE FUNDING FOR NAVSEA OVER-RUN. |
| Aug 15, 2017 | A00607 | $-100.0K | USS WASP (LHD-1) 17EP; DE-OBLIGATION OF EXCESS FUNDING FOR NAVSEA. |
| Aug 10, 2017 | A00604 | $27.7K | USS KEARSARGE (LHD-3) 17A2 CMAV; SETTLED GROWTH WORK RCCS 4G-6G, 8G&9G. |
| Aug 10, 2017 | A00605 | $32.6K | USS KEARSARGE (LHD-3) 17CM; SETTLED GROWTH WORK RCCS. |
| Aug 10, 2017 | A00606 | $1.2M | USS WASP (LHD-1) 17CM; SETTLED NEW AND GROWTH WORK RCCS. |
| Aug 8, 2017 | A00603 | $509.4K | USS KEARSARGE (LHD-3) 17EM; SETTLED NEW AND GROWTH WORK RCCS. |
| Aug 2, 2017 | A00602 | $1.1M | USS WASP (LHD-1) 17CM; SETTLED NEW AND GROWTH WORK RCCS. |
| Aug 1, 2017 | A00601 | $557.6K | USS KEARSARGE (LHD-3) 17CM; SETTLED NEW AND GROWTH WORK RCCS. |
| Jul 28, 2017 | A00600 | $-448.3K | USS KEARSARGE (LHD-3) 17A2 CMAV; SETTLED GROWTH WORK RCCS 1G, 2G,3G&7G. |
| Jul 25, 2017 | A00599 | $1.1M | USS KEARSARGE (LHD-3) 17EM; SETTLED NEW AND GROWTH WORK RCCS 17NG, 20NG, 21N, 22N, 24N&25N. |
| Jul 21, 2017 | A00598 | $-2.0M | USS WASP (LHD-1) 17C1 PMA; DE-OBLIGATION OF FUNDING. |
| Jul 17, 2017 | A00597 | $419.8K | USS WASP (LHD-1) 17CM; SETTLED NEW AND GROWTH WORK RCCS. |
| Jul 11, 2017 | A00596 | $273.4K | USS KEARSARGE (LHD-3) 17EM; SETTLED NEW AND GROWTH WORK RCCS 64G, 65NG,69G, 71N&72G. |
| Jul 10, 2017 | A00595 | $182.1K | USS KEARSARGE (LHD-3) 17EM; SETTLED GROWTH AND NEW WORK RCCS 14NG-16NG&18N-19N. |
| Jul 7, 2017 | A00594 | $300.0K | ACCOMPLISH USS WASP (LHD-1) 17C1 PMA, CLIN 0031 SUBCLIN 0031BC/BD&0031CE/CF, SETTLE GROWTH WORK AND OBLIGATE FUNDING FOR NAVSEA OVERRUN |
| Jul 6, 2017 | A00593 | $1.5M | USS KEARSARGE (LHD-3) 17A2 CMAV; DEFINITIZATION OF THE ORIGINAL PACKAGE. |
| Jun 28, 2017 | A00592 | $-163.4K | USS KEARSARGE (LHD-3) 16C1 PMA; DE-OBLIGATE EXCESS FUNDING. |
| Jun 23, 2017 | A00590 | $54.9K | USS WASP (LHD-1) 17EP; OBLIGATE ADDITIONAL FUNDS FOR PLANNING. |
| Jun 23, 2017 | A00591 | $526.0K | ACCOMPLISH USS WASP (LHD-1) 17CM; CLIN 0415, SUBCLIN 0415BA/BB SETTLE NEW AND GROWTH WORK |
| Jun 21, 2017 | A00588 | $2.0M | ACCOMPLISH USS WASP (LHD-1) 17CM CLIN 0415; SUBCLIN 0415BA/BB SETTLE GROWTH WORK |
| Jun 21, 2017 | A00589 | $-744.0K | USS KEARSARGE (LHD-3) 16C1 PMA; DE-OBLIGATION OF EXCESS FUNDING. |
| Jun 14, 2017 | A00587 | $146.7K | ACCOMPLISH USS WASP (LHD-1) 17C1 PMA; CLIN 0031 SUBCLIN 0031AA/AB, 0031BC/BD, 0031CE/CF&0031EA/EB, SETTLE GROWTH WORK RCCS |
| Jun 13, 2017 | A00586 | $136.8K | USS KEARSARGE (LHD-3) 17EM; SETTLED GROWTH AND NEW WORK RCCS. |
| Jun 12, 2017 | A00585 | $52.2K | USS KEARSARGE (LHD-3) 16C1 PMA; SETTLED GROWTH WORK RCC 726G. |
| Jun 9, 2017 | A00584 | $142.6K | USS KEARSARGE (LHD-3) 17CM; SETTLED GROWTH AND NEW WORK RCCS. |
| Jun 7, 2017 | A00583 | $158.3K | ACCOMPLISH USS WASP (LHD-1) 17C1 PMA, CLIN 0031; SUBCLIN 0031BC/BD, 0031CE/CF&0031EA/EB - SETTLE GROWTH WORK |
| May 31, 2017 | A00582 | $1.1M | ACCOMPLISH USS WASP (LHD-1) 17C1 PMA SETTLE GROWTH WORK RCC; CLIN 0031, SUBCLIN 0031BC/BD, 0031CE/CF AND 0031EA/EB |
| May 26, 2017 | A00581 | $66.8K | USS KEARSARGE (LHD-3) 17CM; SETTLED GROWTH WORK RCCS 54NG, 57MG&59NG. |
| May 24, 2017 | A00580 | $584.2K | ACCOMPLISH USS WASP (LHD-1) 17C1 PMA, CLIN 0031; SUBCLIN 0031BC/BD, 0031CE/CF, 0031EA/EB, 0031DE/DF&0031FC/FD, SETTLE GROWTH WORK |
| May 22, 2017 | A00579 | $0 | USS KEARSARGE (LHD-3) 16C1 PMA; AUTHORIZE CONTRACTOR TO BILL FOR COST AND SCHEDULE INCENTIVE FEES. |
| May 19, 2017 | A00578 | $300.0K | ACCOMPLISH USS WASP (LHD-1) 17C1 PMA |
| May 18, 2017 | A00577 | $197.8K | USS WASP (LHD-1) 17C1 PMA; SETTLED GROWTH WORK RCCS AND PERIOD OF PERFORMANCE EXTENSION. |
| May 15, 2017 | A00576 | $861.6K | ACCOMPLISH USS WASP (LHD-1) 17C1 PMA |
| May 11, 2017 | A00575 | $13.2K | USS KEARSARGE (LHD-3) 17CM; SETTLED GROWTH WORK RCCS. |
| May 10, 2017 | A00573 | $0 | USS BATAAN (LHD-5) 17EM; SETTLED GROWTH WORK RCCS. |
| May 10, 2017 | A00574 | $248.3K | USS KEARSARGE (LHD-3) 17EM; SETTLED GROWTH AND NEW WORK RCCS. |
| May 8, 2017 | A00571 | $244.6K | ACCOMPLISH USS KEARSARGE (LHD-3) 17CM |
| May 8, 2017 | A00572 | $419.5K | ACCOMPLISH USS WASP LHD-1 17C1 PMA |
| May 5, 2017 | A00569 | $264.2K | ACCOMPLISH USS WASP (LHD-1) 17C1 PMA |
| May 5, 2017 | A00570 | $526.1K | ACCOMPLISH USS WASP (LHD-1) 17C1 PMA |
| Apr 14, 2017 | A00566 | $730 | USS BATAAN (LHD-5) 17A2 CMAV; SETTLED GROWTH WORK RCCS 12G-18G. |
| Apr 14, 2017 | A00567 | $41.2K | USS KEARSARGE (LHD-3) 16C1 PMA; SETTLED GROWTH WORK RCCS 503G, 725G&727G. |
| Apr 14, 2017 | A00568 | $117.4K | USS KEARSARGE (LHD-3) 17CM; SETTLED NEW AND GROWTH WORK RCCS. |
| Apr 13, 2017 | A00563 | $-2.5M | USS WASP (LHD-1), USS KEARSARGE (LHD-3), USS BATAAN (LHD-5)&USS IWO JIMA (LHD-7); DE-OBLIGATION OF UNLIQUIDATED ACRN BALANCES FOR FY11-12. |
| Apr 13, 2017 | A00564 | $-121.8K | USS BATAAN (LHD-5) 17CM; SETTLED NEW AND GROWTH WORK RCCS 18NG, 21N&23NG. |
| Apr 13, 2017 | A00565 | $-3.4K | USS BATAAN (LHD-5) 17A1 CMAV; SETTLED GROWTH WORK RCCS 25G&26G. |
| Apr 12, 2017 | A00562 | $705.4K | ACCOMPLISH USS WASP (LHD-1) 17C1 PMA |
| Apr 6, 2017 | A00560 | $171.6K | USS WASP (LHD-1) 17CM; DEFINITIZATION OF THE ORIGINAL PACKAGE. |
| Apr 6, 2017 | A00561 | $476.3K | ACCOMPLISH USS WASP (LHD-1) 17C1 PMA |
| Apr 5, 2017 | A00558 | $91.2K | USS KEARSARGE (LHD-3) 17EM; SETTLED GROWTH WORK RCCS 3G, 4G, 5N&6N. |
| Apr 5, 2017 | A00559 | $29.3K | USS KEARSARGE (LHD-3) 17A1 CMAV; SETTLED GROWTH WORK RCC 1G. |
| Apr 4, 2017 | A00556 | $181.1K | USS KEARSARGE (LHD-3) 16C1 PMA; SETTLED GROWTH WORK RCCS&PERIOD OF PERFORMANCE EXTENSION. |
| Apr 4, 2017 | A00557 | $682.1K | USS KEARSARGE (LHD-3) 17CM; SETTLED NEW AND GROWTH WORK RCCS. PERIOD OF PERFORMANCE EXTENSION. |
| Apr 2, 2017 | A00555 | $2.2M | ACCOMPLISH USS WASP (LHD-1) 17C1 PMA --SETTLE NEW AND GROWTH WORK |
| Mar 27, 2017 | A00553 | $15.2K | USS BATAAN (LHD-5) 17EM; SETTLED GROWTH WORK RCC 37NG. |
| Mar 27, 2017 | A00554 | $10.2K | USS BATAAN (LHD-5) 17CM; SETTLED NEW AND GROWTH WORK RCCS. |
| Mar 24, 2017 | A00551 | $2.1M | ACCOMPLISH USS WASP LHD-1 17C1 PMA |
| Mar 24, 2017 | A00552 | $46.8K | USS BATAAN (LHD-5) 17A2 CMAV; SETTLED GROWTH WORK RCCS. |
| Mar 13, 2017 | A00550 | $0 | ADMIN CHANGE OF DCAA DODAAC AND PAYING OFFICE. |
| Mar 11, 2017 | A00548 | $174.8K | USS WASP (LHD-1) 17C1 PMA - SETTLED GROWTH WORK |
| Mar 11, 2017 | A00549 | $862.3K | USS WASP (LHD-1) 17C1 PMA; SETTLED GROWTH WORK RCCS&PERIOD OF PERFORMANCE EXTENSION. |
| Mar 10, 2017 | A00547 | $617.3K | USS WASP(LHD-1) 17C1 PMA; UNDEFINITIZED CONTRACT ACTION FOR FORCED STRAP BLOWER. |
| Mar 8, 2017 | A00546 | $325.9K | USS BATAAN (LHD-5) 17EM; SETTLED NEW AND GROWTH WORK RCCS. |
| Mar 7, 2017 | A00542 | $32.3K | USS KEARSARGE (LHD-3) 16C1; SETTLED NEW AND GROWTH WORK RCCS. |
| Mar 7, 2017 | A00543 | $0 | USS KEARSARGE (LHD-3) 16C1 PMA; AUTHORIZE CONTRACTOR TO BILL FOR CREW MOVE ABOARD AND PRODUCTION COMPLETION DATE SCHEDULE INCENTIVE FEES. |
| Mar 7, 2017 | A00544 | $521.7K | USS KEARSARGE (LHD-3) 17CM; SETTLED NEW AND GROWTH RCCS. |
| Mar 7, 2017 | A00545 | $30.7K | USS KEARSARGE (LHD-3) 17EM; SETTLED GROWTH WORK RCCS. |
| Mar 2, 2017 | A00541 | $-657.9K | USS WASP (LHD-1) 17C1 PMA--- SETTLE GROWTH WORK |
| Feb 27, 2017 | A00540 | $0 | USS KEARSARGE (LHD-3) 16C1 PMA; LINE OF ACCOUNTING CHANGE FOR ACRN KA. |
| Feb 22, 2017 | A00539 | $1.1M | USS WASP (LHD-1) 17C1 PMA--- SETTLE GROWTH WORK |
| Feb 15, 2017 | A00538 | $2.2M | USS WASP (LHD-1) 17C1 PMA --NEW AND GROWTH WORK |
| Feb 14, 2017 | A00535 | $352.8K | DEFINITIZE USS KEARSARGE (LHD-3)FY 17 EM |
| Feb 14, 2017 | A00536 | $73.3K | USS KEARSARGE (LHD-3) 17A1 CMAV; DEFINITIZATION OF THE ORIGINAL PACKAGE. |
| Feb 14, 2017 | A00537 | $154.4K | USS KEARSARGE (LHD-3) 17CM; DEFINITIZATION OF THE ORIGINAL PACKAGE. |
| Feb 13, 2017 | A00532 | $513.3K | USS BATAAN 9LHD-5)17A2 CMAV DEFINITIZATION |
| Feb 13, 2017 | A00533 | $182.8K | ACCOMPLISH USS BATAAN (LHD 5) FY17EM-- SETTLE RCCS |
| Feb 13, 2017 | A00534 | $558.5K | ACCOMPLISH USS KEARSARGE (LHD-3) 16C1 PMA--- SETTLE RCCS |
| Feb 9, 2017 | A00531 | $844.0K | USS BATAAN LHD-5 17CM AVAIL SETTLED RCCS |
| Feb 7, 2017 | A00530 | $1.7M | USS WASP (LHD-1) 17C1 PMA--NEW AND GROWTH WORK |
| Feb 3, 2017 | A00529 | $127.1K | USS WASP (LHD-1) 17EP; OBLIGATE NAVSEA FUNDING. |
| Feb 2, 2017 | A00528 | $350.7K | USS BATAAN (LHD-5) 17EM; SETTLED NEW WORK RCCS. |
| Feb 1, 2017 | A00527 | $779.1K | USS WASP (LHD-1) 17C1 PMA; SETTLED NEW AND GROWTH WORK RCCS. |
| Jan 31, 2017 | A00526 | $-65.1K | USS BATAAN LHD-5 SETTLE GROWTH WORK RCCS 17A1 CMAV |
| Jan 30, 2017 | A00525 | $14.0K | USS BATAAN (LHD-5) 17EM SETTLE GROWTH&NEW WORK RCCS |
| Jan 27, 2017 | A00524 | $436.6K | USS WASP (LHD-1) 17C1 PMA--- NEW AND GROWTH WORK |
| Jan 26, 2017 | A00522 | $23.4K | USS WASP (LHD-1) 17C1 PMA ---UCA RCC 127N |
| Jan 26, 2017 | A00523 | $39.6K | USS WASP (LHD-1)17C1 PMA ---UCA FOR RCC 119N |
| Jan 24, 2017 | A00521 | $1.6M | USS WASP 17C1 PMA --SETTLE NEW AND GROWTH WORK |
| Jan 23, 2017 | A00520 | $910.5K | USS WASP (LHD-1) 17C1 PMA-- SETTLE NEW AND GROWTH WORK |
| Jan 19, 2017 | A00519 | $1.9M | USS WASP (LHD-1) 17C1 PMA --SETTLE NEW AND GROWTH WORK |
| Jan 17, 2017 | A00516 | $2.0M | ACCOMPLISH USS WASP LHD-1 FY17C1 PMA |
| Jan 17, 2017 | A00517 | $51.9K | SETTLED GROWTH&NEW-GROWTH WORK RCCS. USS BATAAN (LHD-5) |
| Jan 17, 2017 | A00518 | $323.3K | USS WASP (LHD-1) 17C1 PMA; SETTLED NEW AND GROWTH WORK RCCS. |
| Jan 13, 2017 | A00515 | $299.4K | ACCOMPLISH KEARSARGE LHD-3 FY 16C1 PMA |
| Jan 10, 2017 | A00514 | $38.7K | ACCOMPLISH USS IWO JIMA FY17 EM |
| Dec 22, 2016 | A00513 | $266.6K | USS KEARSARGE (LHD-3) 16C1 PMA SETTLE GROWTH RCCS |
| Dec 21, 2016 | A00512 | $2.1M | USS KEARSARGE LHD 3 FY16 PMA SETTLE GROWTH / NEW GROWTH RCCS, OBLIGATE FUNDING FOR OVERRUN AND REVISED PCD |
| Dec 20, 2016 | A00510 | $458.1K | USS BATAAN LHD-5 SETTLE GROWTH&NEW WORK RCCS FOR 17EM AVAIL |
| Dec 20, 2016 | A00511 | $879.8K | USS BATAAN LHD-5; SETTLED GROWTH WORK RCCS 17A1 CMAV AVAIL |
| Dec 12, 2016 | A00509 | $0 | USS KEARSARGE (LHD-3) 16C1 PMA; SETTLED GROWTH WORK RCCS. THIS MODIFICATION REPLACES P00005 THAT WAS RELEASED ON 09 NOVEMBER 2016. |
| Dec 5, 2016 | A00507 | $666.4K | USS BATAAN LHD-5 17EM DEFINITIZATION OF PKG |
| Dec 5, 2016 | A00508 | $48.9M | USS WASP (LHD-1) 17C1 PMA; DEFINITIZATION OF THE ORIGINAL PACKAGE. |
| Nov 9, 2016 | P00005 | $780.8K | USS KEARSARGE (LHD-3) 16C1 PMA; SETTLED GROWTH WORK RCCS. |
| Nov 7, 2016 | A00505 | $26.9K | USS BATAAN (LHD-5) SETTLE RCCS |
| Oct 28, 2016 | A00504 | $872.9K | USS KEARSARGE (LHD-3) 16C1 PMA; SETTLED GROWTH WORK RCCS. |
| Sep 30, 2016 | A00496 | $2.6K | USS BATAAN (LHD-5) 16CM-2&16A3 CMAV; SETTLED GROWTH WORK RCCS. |
| Sep 30, 2016 | A00497 | $1.4M | USS BATAAN LHD-5 DEFINITIZATION OF 17A1 CMAV PACKAGE |
| Sep 30, 2016 | A00498 | $723.4K | USS KEARSARGE (LHD-3) 16C1; SETTLE GROWTH WORK RCCS |
| Sep 30, 2016 | A00499 | $1.4M | USS WASP LHD-A 17C1 PMA |
| Sep 30, 2016 | A00500 | $240.8K | FLYAWAY TEAM TO ROTA SPAIN |
| Sep 30, 2016 | A00501 | $561.7K | OBLIGATE FUNDING FOR OVER-RUNS |
| Sep 30, 2016 | A00502 | $492.9K | USS KEARSARGE (LHD-3) 16C1 PMA; SETTLED GROWTH WORK RCCS. |
| Sep 30, 2016 | A00503 | $1.6M | LHA LHD CLASS SHIPS FY17 IAPA; DEFINITIZATION OF THE ORIGINAL PACKAGE. |
| Sep 29, 2016 | A00495 | $197.9K | USS BATAAN LHD-5 16EM-2 SETTLED RCCS |
| Sep 28, 2016 | A00492 | $740.2K | USS KEARSARGE (LHD-3) 16C1 PMA; SETTLED GROWTH WORK RCCS. |
| Sep 28, 2016 | A00493 | $702.1K | USS KEARSARGE (LHD-3) 16C1 PMA; SETTLED GROWTH AND NEW WORK RCCS. |
| Sep 28, 2016 | A00494 | $3.7K | USS KEARSARGE (LHD-3) 16CM; SETTLED GROWTH WORK RCCS. |
| Sep 26, 2016 | A00490 | $2.0M | USS WASP (LHD-1) 17EP; SETTLED PRE-FAB WORK ITEMS 259-11-001&588-90-002 |
| Sep 26, 2016 | A00491 | $1.2M | USS WASP (LHD-1) 17EP; PRE-FAB FOR TYCOM AND NAVSEA. |
| Sep 21, 2016 | A00489 | $-24.7K | USS WASP (LHD-1) 16 CM&16A3 CMAV; REALIGN FUNDING AND SETTLE GROWTH WORK RCCS. |
| Sep 16, 2016 | A00488 | $5.9M | AWARD FEE PERIOD SIX PAYOUT |
| Sep 15, 2016 | A00487 | $2.5M | USS KEARSARGE (LHD-3) 16C1 PMA; SETTLED NEW AND GROWTH WORK RCCS. |
| Sep 13, 2016 | A00485 | $148.5K | USS BATAAN (LHD-5) 16A3 CMAV&16CCM-2. SETTLED NEW AND GROWTH WORK RCCS. |
| Sep 13, 2016 | A00486 | $1.7M | USS KEARSARGE (LHD-3) 16C1 PMA; SETTLED NEW AND GROWTH WORK RCCS. |
| Sep 2, 2016 | A00484 | $89.3K | USS WASP (LHD-1) 16CM&16A2 CMAV; SETTLED GROWTH WORK RCCS. |
| Aug 29, 2016 | A00483 | $-61.7K | USS WASP (LHD-1) 16CM&16A3 CMAV. REALIGN FUNDING. |
| Aug 22, 2016 | A00481 | $-80.4K | USS WASP (LHD-1), USS KEARSARGE (LHD-3)&USS BATAAN (LHD-5); AUTHORIZE CONTRACTOR TO BILL FOR CIF&SIF. DE-OBLIGATE FUNDING FOR UNEARNED CIF. |
| Aug 22, 2016 | A00482 | $439.2K | USS BATAAN (LHD-5) 16EM-2; SETTLED GROWTH&NEW WORK RCCS |
| Aug 3, 2016 | A00479 | $1.9M | USS WASP (LHD-1) 16CM; SETTLED GROWTH WORK RCCS. |
| Aug 3, 2016 | A00480 | $48.9K | USS BATAAN (LHD-5) 16CM-2; SETTLED NEW AND GROWTH WORK RCCS. |
| Aug 2, 2016 | A00478 | $2.3M | USS WASP (LHD-1) 17C1 PMA; EXERCISE THE OPTION FOR CLIN 0031 AND AUTHORIZE THE CONTRACTOR TO PROCURE LLTM. |
| Jul 27, 2016 | A00477 | $17.4M | USS KEARSARGE (LHD-3) 16C1 PMA; DEFINITIZATION OF THE ORIGINAL PACKAGE. |
| Jul 22, 2016 | A00476 | $108.2K | USS KEARSARGE (LHD-3) 16C1 PMA; SETTLED GROWTH WORK RCCS. |
| Jul 15, 2016 | A00475 | $195.6K | USS KEARSARGE (LHD-3) 16CM; DEFINITIZATION OF ORIGINAL PACKAGE AND SETTLED RCC 1G. |
| Jul 14, 2016 | A00474 | $82.1K | USS KEARSARGE (LHD-3) 16A1 CMAV; SETTLED GROWTH WORK RCCS. |
| Jul 11, 2016 | A00473 | $0 | USS KEARSARGE (LHD-3) 16C1 PMA; LINE OF ACCOUNTING CORRECTION FOR ACRNS JN&JW. |
| Jun 24, 2016 | A00472 | $56.0K | USS WASP (LHD-1) 16A3 CMAV - CLIN 0414 - SETTLE GROWTH WORK RCCS&ADMIN CORRECTION |
| Jun 21, 2016 | A00471 | $11.9K | USS KEARSARGE (LHD-3) 16A1 CMAV - CLIN 0515 - PROCURMENT OF LLTM |
| Jun 10, 2016 | A00470 | $884.6K | USS BATAAN (LHD-5) 16A3 CMAV - CLIN 0622 - DEFINITIZATION OF THE ORIGINAL PACKAGE |
| Jun 8, 2016 | A00469 | $930.4K | USS KEARSARGE (LHD-3) 16A1 CMAV - CLIN 0515 - DEFINITIZE ORIGINAL PACKAGE |
| Jun 7, 2016 | A00468 | $1.3M | USS KEARSARGE (LHD-3) - 16A1 CMAV - CLIN 0515; DEFINITIZE, SETTLE GROWTH WORK |
| Jun 6, 2016 | A00467 | $1.5M | USS BATAAN (LHD-5) - 15C1 PMA - CLIN 0030; SETTLE GROWTH&PROVIDE ADDITIONAL FUNDING FOR OVER-RUN |
| May 9, 2016 | A00466 | $18.4M | ACCOMPLISH USS KEARSARGE (LHD-3)16C1 PMA; DEFINITIZE UNDEFINITIZED CONTRACT ACTION (UCA) |
| May 3, 2016 | A00465 | $49.4K | USS WASP (LHD-1) 16A3 CMAV; AUTHORIZE CONTRACTOR TO PROCURE LLTM. |
| Apr 28, 2016 | A00464 | $-13.2K | USS BATAAN (LHD-5) 16EM-2; SETTLED GROWTH WORK RCC. |
| Apr 25, 2016 | A00463 | $69.8K | USS WASP (LHD-1) 16 CM; SETTLED NEW AND GROWTH WORK RCCS. |
| Apr 18, 2016 | A00462 | $68.6K | USS BATAAN (LHD-5) 16CM-2; DEFINITIZATION OF THE ORIGINAL PACKAGE. |
| Apr 15, 2016 | A00461 | $-81.0K | USS BATAAN (LHD-5) 16CM; SETTLED GROWTH WORK RCCS. |
| Apr 13, 2016 | A00459 | $-2.3M | USS KEARSARGE (LHD-3) - CLIN 0034 - CANCEL MOD A00454 |
| Apr 13, 2016 | A00460 | $2.1M | USS KEARSARGE (LHD-3) - CLIN 0034 - PROCURMENT OF LLTM |
| Apr 12, 2016 | A00458 | $165.2K | USS BATAAN (LHD-5) 16EM-2; DEFINITIZATION OF THE EM PACKAGE AND SETTLED NEW AND GROWTH WORK RCCS. |
| Apr 7, 2016 | A00457 | $304.4K | USS WASP (LHD-1) 16CM; SETTLED GROWTH WORK RCCS. |
| Apr 6, 2016 | A00456 | $12.2K | USS WASP (LHD-1) 16A3 CMAV; PROCUREMENT OF LONG LEAD TIME MATERIAL (LLTM). |
| Apr 4, 2016 | A00455 | $-2.5K | USS BATAAN (LHD-5) 15C1 DPMA; SETTLED RCC 1065G. THIS RCC WS INADVERTENTLY LEFT OFF OF MOD A00438. |
| Mar 31, 2016 | A00454 | $2.3M | USS KEARSARGE (LHD-3) - 16C1 PMA - CLIN 0034 - PROCURE LLTM |
| Mar 22, 2016 | A00452 | $0 | USS BATAAN (LHD-5) 15C1 DPMA; AUTHORIZE BAE-NSR TO BILL FOR SCHEDULE INCENTIVE FEES (SIF) EARNED. |
| Mar 22, 2016 | A00453 | $56.6K | USS WASP (LHD-1) 16CM; DEFINITIZE THE UNDEFINITIZED CONTRACT ACTION (UCA)&SETTLED RCC 2G. |
| Mar 21, 2016 | A00451 | $-197 | USS WASP (LHD-1) 16A1 CMAV; SETTLED GROWTH WORK RCCS. |
| Mar 18, 2016 | A00449 | $3.1M | USS BATAAN (LHD-5) 15C1 DPMA; SETTLED GROWTH WORK RCCS. PERIOD OF PERFORMANCE EXTENSION. |
| Mar 18, 2016 | A00450 | $77.5K | USS BATAAN (LHD-5) 16CM; SETTLED GROWTH WORK RCCS. |
| Mar 16, 2016 | A00448 | $795.1K | USS WASP (LHD-1) 16CM; EXECUTE THE UNDEFINITIZED CONTRACT ACTION (UCA). |
| Mar 10, 2016 | A00447 | $1.3M | USS WASP (LHD-1) - CLIN 0028 - DEFINITIZE EXECUTION PLANNING |
| Mar 7, 2016 | A00446 | $970.8K | USS KEARSARGE (LHD-3) - CLIN 0034 - PROCUREMENT OF LLTM |
| Mar 1, 2016 | A00445 | $139.1K | USS WASP (LHD-1) 15EM&16A1 CMAV; SETTLED GROWTH RCCS AND PERIOD OF PERFORMANCE. |
| Feb 26, 2016 | A00444 | $66.2K | USS BATAAN (LHD-5) 16CMAV - CLIN 0619 - SETTLE GROWTH WORK&EXTEND POP |
| Feb 16, 2016 | A00443 | $396.4K | USS KEARSARGE (LHD-3) - 16C1 PMA - CLIN 0034 - LLTM&CHANGE POP START DATE |
| Feb 12, 2016 | A00442 | $69.8K | USS KEARSARGE (LHD-3) - CLIN 0512 - SETTLE GROWTH WORK/OTHER ESTIMATED COST SUBCLIN 0512BC/BD |
| Feb 4, 2016 | A00440 | $625.0K | USS WASP (LHD-1) 15EM; SETTLED NEW AND GROWTH WORK RCCS. |
| Feb 4, 2016 | A00441 | $862.6K | USS BATAAN (LHD-5) 15C1 DPMA; SETTLED GROWTH WORK RCCS&EXTEND THE PERIOD OF PERFORMANCE. |
| Feb 3, 2016 | A00439 | $436.1K | USS WASP (LHD-5) 16A1 CMAV; SETTLED NEW AND GROWTH WORK RCCS. |
| Jan 8, 2016 | A00437 | $174.4K | USS WASP LHD 1 15EM; SETTLED GROWTH WORK FOR RCC'S |
| Jan 8, 2016 | A00438 | $1.3M | USS BATAAN (LHD-5) 15C1 DPMA; SETTLED GROWTH WORK RCCS. |
Research next steps
- Verify whether remaining options may extend performance beyond the current end date.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.