Federal contract award

N0002413C2112

USS ENTERPRISE (CVN 65) INACT ACCOMPLISH

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVSEA HQ
NAICS336611 — Ship Building and Repairing
PSC1905 — Combat Ships and Landing Vessels
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS INCENTIVE FEE
Obligations$945.3M
Current contract value$989.9M
Potential contract value / ceiling$992.9M
Start dateJun 20, 2013
Current end dateAug 5, 2026
Potential end dateFeb 5, 2027
Latest award activityJun 2, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 310 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 2, 2026P00021$0CLAUSE UPDATE
May 5, 2026A00289$0PERIODIC RELEASE MODIFICATION FOR THE USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT AND STORAGE
Mar 31, 2026A00288$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT. AWARD FIELD MODIFICATION REQUESTS 6.05 AND 9.07, WHICH CLOSES OUT THE LEVEL OF EFFORT REQUIREMENT FOR SHIP WORK ITEM LISTING NUMBER 5132Y-A-030 AND INCREASES FUNDING FOR THE 8121X-1000.
Mar 24, 2026P00020$0FUNDING AND OTHER ADMINISTRATIVE ACTIONS
Feb 27, 2026A00287$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT. CORRECT LEVEL OF EFFORT VALUES FOUND IN SECTION J.
Feb 23, 2026A00286$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISHMENT. AWARD FIELD MODIFICATION REQUESTS 5.34, 9.06, & 21.01. EACH OF THESE FIELD MODIFICATION REQUESTS ADJUSTS LEVEL OF EFFORT VALUES FOUND IN SECTION J.
Feb 2, 2026A00285$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT AWARD OF FIELD MODIFICATION REQUEST 298.09, WHICH INCREASES MATERIAL.
Nov 13, 2025A00284$0PERIODIC RELEASE MODIFICATION FOR THE USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT AND STORAGE
Aug 15, 2025A00283$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT CLIN0001 PERIOD OF PERFORMANCE EXTENSION TO 30 SEPTEMBER 2026.
Aug 6, 2025P00019$2.3MFUNDING AND OTHER ADMINISTRATIVE ACTIONS
Jun 13, 2025A00282$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT. AWARD FIELD MODIFICATION REQUEST 16.01-FLOODING MATRIX APPROVAL
May 28, 2025A00281$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH. AWARD FIELD MODIFICATION REQUEST 5.33 AND UPDATE THE STORAGE AUTHORIZED WORK PACKAGE.
May 20, 2025A00280$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENTS. AWARD FIELD MODIFICATION REQUEST 5.32 AND ADMINISTRATIVE EDIT TO MODIFICATION N0002413C2112-A00277.
May 8, 2025A00279$0PERIODIC RELEASE MODIFICATION FOR THE USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT AND STORAGE
Apr 23, 2025A00278$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT. AWARD FIELD MODIFICATION REQUEST 5.31 AND UPDATE THE STORAGE AUTHORIZED WORK PACKAGE
Apr 1, 2025A00277$0AWARD FIELD MODIFICATION REQUEST 5.27R, UPDATES THE REQUIREMENTS AWARDED UNDER A00270 AS PART OF FIELD MODIFICATION REQUEST 5.27, IN SUPPORT OF USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT.
Mar 5, 2025A00276$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT, AWARD FIELD MODIFICATION REQUEST 5.30, WHICH PROVIDES UPDATED STORAGE AVAILABILITY WORK PACKAGE REQUIREMENTS.
Feb 26, 2025A00275$0THIS MODIFICATION ADMINISTRATIVELY CORRECTS TEXT ON THE CONTINUATION PAGE FOR N0002413C2112-A00273 FOR USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Feb 24, 2025A00274$4.4MUSS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT, ISSUE AND AWARD FUNDING VIA FIELD MODIFICATION REQUEST 298.08 & 299.10.
Feb 21, 2025A00272$3.4MUSS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT, AWARD FIELD MODIFICATION REQUEST 21.00 FOR THE CONTRACTOR TO CONDUCT HULL CLEANING OF THE VESSEL PRIOR TO TOW.
Feb 21, 2025A00273$2.5MUSS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT UNILATERALLY AWARD FIELD MODIFICATION REQUEST 5.28, WHICH INCREASES FUNDING AND DIRECTS THE CONTRACTOR TO INCREASE THEIR LEVEL OF EFFORT-SHIP WORK LINE ITEM NUMBER 8411C-A-031
Feb 12, 2025A00271$0FIELD MODIFICATION REQUEST 5.29 IS AWARDED TO UPDATE THE STORAGE AVAILABILITY WORK PACKAGE FOR THE FORMER USS ENTERPRISE (CVN 65) IN SUPPORT OF TOW PREPARATION.
Dec 23, 2024A00270$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT: AWARD FIELD MODIFICATION REQUEST 5.27
Dec 18, 2024A00269$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT - AWARD FIELD MODIFICATION REQUESTS 5.26 AND 18.01 UNDER CONTRACT DATA LINE 0006 WORK REQUIREMENTS AND IN ACCORDANCE WITH THE STORAGE AVAILABILITY WORK PACKAGE REQUIREMENTS.
Nov 27, 2024A00268$0PERIODIC RELEASE MODIFICATION FOR THE USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT AND STORAGE
Oct 11, 2024A00267$0ADMINISTRATIVELY ADJUST THE FIGURES IN SECTIONS A & B OF THE CONTRACT TO ALIGN WITH THE ADMINISTRATIVE MODIFICATIONS CITED ON THE CONTINUATION PAGE, PROVIDE AN UPDATED AVAILABILITY WORK PACKAGE TO THE CONTRACTOR FOR USS ENTERPRISE (CVN 65)
Sep 24, 2024A00266$0THIS ACTION WILL EXTEND THE PERIOD OF PERFORMANCE FOR EXCEPTION AND CLARIFICATION 28, FOR THE FORMER CVN65, WHICH WILL CONTINUE TO SUPPORT THE MULTI-CLUSTER REFUELING CONTAINER
Sep 6, 2024P00018$4.9MUSS ENTERPRISE (CVN 65) STORAGE EXTENSION
Jul 26, 2024A00265$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT UPDATE LEVEL OF EFFORT TEXT TO INCLUDE DOSIMETRY SUPPORT
May 21, 2024A00264$3.9MUSS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT, CONTRACT LINE ITEM NUMBER 0006 INCREASE FUNDING TO SUPPORT EMERGENT REPAIR LEVEL OF EFFORT. FIELD MODIFICATION REQUEST 5.24
May 13, 2024A00263$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT - ADMINISTRATIVE CORRECTION
May 7, 2024A00262$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT, PERIODIC RELEASE MODIFICATION
May 2, 2024A00261$0ISSUE FIELD MODIFICATION REQUEST 298.07
Apr 1, 2024A00260$0FIELD MODIFICATION REQUESTS 4.07, 5.23, 9.05
Mar 27, 2024A00259$0ISSUANCE OF FIELD MODIFICATION REQUEST 5.21: HULL CLEANING FEASIBILITY STUDY
Feb 20, 2024A00257$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Feb 20, 2024A00258$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT ADMINISTRATIVE MODIFICATION
Feb 15, 2024A00256$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Dec 18, 2023A00255$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT TRANSFER MATERIAL FUNDING BETWEEN LEVEL OF EFFORTS
Dec 13, 2023A00254$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT INCREASE CLIN0001 LEVEL OF EFFORT SWLIN 00236
Dec 1, 2023A00253$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Nov 28, 2023A00252$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT - PERIODIC RELEASE MODIFICATION
Nov 14, 2023A00251$791.7KUSS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT - AWARD FMR 298.06
Nov 13, 2023A00250$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Oct 23, 2023A00249$587.1KUSS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Oct 12, 2023A00248$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Sep 19, 2023A00247$1.3MUSS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Sep 15, 2023A00246$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Sep 14, 2023A00245$202.7KUSS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Aug 25, 2023A00244$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Jul 12, 2023A00243$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Jun 21, 2023A00242$1.1MUSS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Jun 7, 2023A00241$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
May 12, 2023A00240$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Apr 12, 2023A00239$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Mar 16, 2023A00238$3.9MUSS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Mar 10, 2023A00237$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Feb 16, 2023A00236$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Feb 13, 2023A00235$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Dec 15, 2022A00234$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Dec 13, 2022A00233$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Nov 23, 2022A00232$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Nov 18, 2022A00231$1.2MUSS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Oct 13, 2022A00230$1.3MUSS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Oct 13, 2022P00017$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Sep 29, 2022A00229$10.0KUSS ENTERPRISE (CVN 65) INACTIVATION ACCOMPISHMENT
Sep 23, 2022A00228$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Sep 19, 2022A00227$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Sep 14, 2022A00226$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Sep 7, 2022A00225$200.8KUSS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Sep 1, 2022A00224$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Aug 18, 2022A00223$1.3MUSS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Jun 3, 2022A00222$263.4KUSS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
May 26, 2022A00221$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
May 24, 2022A00220$0USS ENTERPRISE (CVN 65) INACTIATION ACCOMPLISH
May 2, 2022P00016$11.1MUSS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Apr 15, 2022P00015$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Mar 31, 2022P00014$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Mar 21, 2022A00219$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Mar 9, 2022A00218$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Mar 8, 2022A00217$1.2MUSS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Jan 13, 2022A00216$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Jan 12, 2022A00215$1.2MUSS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISH
Dec 23, 2021A00214$1.9MUSS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Nov 24, 2021A00213$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISH PERIODIC RELEASE MODIFICATION
Sep 30, 2021A00212$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISH
Sep 29, 2021A00211$239.6KUSS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISH
Sep 28, 2021A00210$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISH
Sep 22, 2021A00209$875.1KUSS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISH
Sep 17, 2021A00207$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISH
Sep 17, 2021A00208$1.1MUSS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Aug 31, 2021A00206$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT, TRANSFER OF GOVERNMENT FURNISHED PROPERTY TO CVN73 RCOH EXECUTIION
Aug 27, 2021A00205$2.4MUSS ENTERPRISE (CVN 65) INACT ACCOMPLISH (FMRS 5.05, 8.09, & 10.03)
Jul 27, 2021A00204$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISHMENT
Jul 22, 2021A00203$999.9KUSS ENTERPRISE (CVN 65) INACT ACCOMPLISHMENT
Jul 19, 2021A00202$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISHMENT
May 24, 2021P00013$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
May 13, 2021A00201$168.8KUSS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
May 7, 2021A00200$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
May 6, 2021A00199$2.8MUSS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Apr 30, 2021A00198$7.5MUSS ENTERPRISE (CVN 65) INACT ACCOMPLISHMENT
Apr 23, 2021A00197$101.2KUSS ENTERPRISE (CVN 65) INACT ACCOMPLISHMENT
Apr 16, 2021A00196$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISH
Apr 14, 2021A00195$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISH
Apr 8, 2021A00194$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Feb 25, 2021A00193$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISHMENT
Jan 21, 2021A00192$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISHMENT
Dec 18, 2020A00191$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISHMENT
Nov 20, 2020A00190$1.2MUSS ENTERPRISE (CVN 65) INACT ACCOMPLISHMENT
Nov 17, 2020A00189$461.0KUSS ENTERPRISE (CVN 65) INACT ACCOMPLISHMENT
Oct 29, 2020A00188$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISHMENT
Oct 26, 2020A00187$852.2KUSS ENTERPRISE (CVN 65) INACT ACCOMPLISHMENT
Oct 9, 2020P00012$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Sep 24, 2020A00186$70.0KUSS ENTERPRISE (CVN 65) INACT ACCOMPLISHMENT
Sep 23, 2020A00185$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISHMENT
Sep 16, 2020A00184$2.9MUSS ENTERPRISE (CVN 65) INACT ACCOMPLISHMENT
Sep 15, 2020AB2001$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISHMENT
Sep 11, 2020A00183$5.9MUSS ENTERPRISE (CVN 65) INACT ACCOMPLISHMENT
Sep 3, 2020A00182$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISHMENT
Aug 31, 2020A00181$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISHMENT
Aug 26, 2020A00180$2.3MUSS ENTERPRISE (CVN 65) INACT ACCOMPLISHMENT
Jul 29, 2020A00179$1.3MUSS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Jul 10, 2020A00178$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISH
Jun 2, 2020A00177$6.0MUSS ENTERPRISE (CVN 65) INACT ACCOMPLISHMENT
May 12, 2020A00176$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
May 6, 2020A00175$419.3KUSS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Apr 16, 2020A00174$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Apr 10, 2020A00173$361.7KUSS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Apr 2, 2020A00172$0USS ENTERPRISE (CVN 65) INACTIVATION ACCOMPLISHMENT
Feb 24, 2020A00171$5.0MUSS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Feb 11, 2020A00170$1.7MUSS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Jan 27, 2020A00169$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Dec 19, 2019A00168$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Dec 6, 2019A00167$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Nov 27, 2019A00166$3.7MUSS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Nov 20, 2019A00165$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Oct 31, 2019A00164$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Oct 24, 2019A00163$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Oct 23, 2019A00162$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Sep 23, 2019A00161$340.0KUSS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Sep 19, 2019A00160$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Sep 11, 2019A00159$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Aug 22, 2019A00158$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Aug 16, 2019A00157$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Aug 12, 2019A00156$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Jul 11, 2019A00155$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Jun 11, 2019A00154$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Jun 10, 2019A00153$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
May 30, 2019A00152$5.4MUSS ENTERPRISE (CVN 65) INACT ACCOMPLISH
May 8, 2019A00151$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Apr 26, 2019A00150$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Apr 22, 2019A00149$155.0KUSS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Mar 8, 2019A00148$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Feb 6, 2019A00147$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Jan 18, 2019A00146$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Dec 20, 2018A00145$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Nov 14, 2018A00144$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Nov 1, 2018A00143$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Oct 19, 2018A00142$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Oct 4, 2018A00141$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Sep 27, 2018A00140$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Sep 21, 2018A00139$6.8MUSS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Sep 13, 2018A00138$33.7MUSS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Aug 24, 2018A00137$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Aug 1, 2018A00136$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Jul 17, 2018A00135$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Jul 12, 2018A00134$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Jun 29, 2018A00133$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Jun 26, 2018A00132$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Jun 19, 2018A00131$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Jun 8, 2018A00130$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
May 25, 2018A00129$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
May 23, 2018A00128$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
May 17, 2018A00127$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
May 14, 2018A00126$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Apr 30, 2018A00125$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Apr 24, 2018A00124$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Apr 17, 2018A00123$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Apr 16, 2018A00122$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Apr 3, 2018A00121$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Mar 29, 2018A00120$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Mar 28, 2018A00119$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Mar 12, 2018A00118$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Feb 28, 2018A00117$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH LOE RE-ALIGNMENT
Feb 26, 2018A00116$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH, MOD A00116
Feb 13, 2018A00115$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Feb 1, 2018A00114$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Jan 11, 2018A00113$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH. AWP LANGUAGE CHANGE FOR LOE 8301X-A-006.00
Jan 10, 2018A00112$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Dec 14, 2017A00111$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Nov 30, 2017A00110$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Oct 24, 2017A00109$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Oct 16, 2017A00108$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Oct 12, 2017A00107$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Oct 2, 2017P00011$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Sep 20, 2017A00106$2.0MUSS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Sep 15, 2017A00105$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Sep 1, 2017A00104$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Jul 20, 2017A00103$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH
Jul 14, 2017A00102$0USS ENTERPRISE (CVN 65) INACT ACCOMPLISH

Estimated positioning window

Nov 1, 2026 – Jan 30, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2027-02-05 (96 days from calculation)
+35 points
126 historical awards in this buyer and category group
+15 points
310 recorded award transactions
+10 points
Latest award action: 2026-06-02
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Check the stated set-aside against the solicitation and current certifications.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.