Federal contract award

N0002413C4315

CVN CLASS AIRCRAFT CARRIEIERS MAINTENANCE

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeSOUTHWEST REGIONAL MAINT CENTER
NAICS336611 — Ship Building and Repairing
PSC1905 — Combat Ships and Landing Vessels
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS AWARD FEE
ObligationsNot reported
Current contract value$672.4K
Potential contract value / ceiling$672.4K
Start dateJan 7, 2014
Current end dateOct 19, 2014
Potential end dateJan 31, 2018
Latest award activityJan 29, 2014
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 200 of 429 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 28, 2021A00423$1.2KCODE 440B: DEOBLIGATION ADJUSTMENT TO A00422
Jun 22, 2021A00422$-743.9KCODE 440B: DEOBLIGATION OF UNUSED FUNDS.
Sep 4, 2020A00421$-2.3MCODE 410C, CVN CLASS SHIPS, DEOBLIGATION OF FY2015 EXCESS FUNDS.
Feb 11, 2020A00420$-241.0KCODE 490, USS RONALD REAGAN CVN76 EXCESS FUNDS DEOBLIGATION
Jan 29, 2020A00419$-669.7KCODE 490, USS CARL VINSON (CVN-70) FY 18 FUNDING DEOBLIGATION
Dec 19, 2019A00418$3.2KDE-OBLIGATION OF FUNDING AND AMOD A00416 CORRECTION.
Sep 27, 2019A00417$-1.7MDEOBLIGATION AND RECOUP OF FY14 FUNDING
Jun 3, 2019A00416$3.5MAWARD FEE, INCENTIVE FEE AND COST FEE INCENTIVE PAYMENT
Mar 28, 2019A00415$-662CORRECTION OF PREVIOUS DEOBLIGATION
Mar 25, 2019A00414$0CURRENT ACTION DE-SCOPES PREVIOUS AWARD IN SUPPORT OF CVN-70
Mar 19, 2019A00413$-57.8KCURRENT ACTION DE-SCOPES PREVIOUS AWARD IN SUPPORT OF CVN-71
Mar 6, 2019A00412$-3.0MDEOBLIGATIONS
Feb 11, 2019A00411$-20.6KCURRENT ACTION ADDS WORK IN SUPPORT OF CVN-71.
Jan 17, 2019A00410$33.2KCURRENT ACTION ADDS WORK IN SUPPORT OF CVN-70.
Jan 11, 2019A00409$20.6KCURRENT ACTION ADDS WORK IN SUPPORT OF CVN-71
Jan 4, 2019A00408$219.4KCURRENT ACTION ADDS WORK IN SUPPORT OF CVN-71.
Dec 28, 2018A00407$323.2KCURRENT ACTION ADDS WORK IN SUPPORT OF CVN-70.
Dec 17, 2018A00406$33.6KCVN-70 GROWTH WORK
Dec 13, 2018A00405$164.7KCURRENT ACTION ADDS WORK IN SUPPORT OF CVN-70.
Dec 7, 2018A00404$416.6KCURRENT ACTION ADDS WORK IN SUPPORT OF CVN-70.
Dec 4, 2018A00403$-29.2KCURRENT ACTION ADDS WORK IN SUPPORT OF CVN-71
Nov 30, 2018A00402$12.8KCURRENT ACTION ADDS WORK IN SUPPORT OF CVN-70.
Nov 23, 2018A00401$58.1KCURRENT ACTION ADDS WORK IN SUPPORT OF CVN-71.
Nov 19, 2018A00400$116.7KCURRENT ACTION ADDS WORK IN SUPPORT OF CVN-71
Nov 14, 2018A00399$130.7KC490 - CURRENT ACTION ADDS WORK AND ALSO DE-SCOPES PREVIOUS AWARD IN SUPPORT OF CVN-71.
Nov 9, 2018A00398$85.3KC490 - CURRENT ACTION ADDS WORK IN SUPPORT OF CVN-71.
Nov 8, 2018A00397$0CURRENT ACTION DELETES PROBLEMATIC STATEMENTS FOUND IN OUR CONTRACT AWARD SOFTWARE.
Nov 6, 2018A00396$950.9KCODE 490 - CURRENT ACTION ADDS WORK IN SUPPORT OF CVN-70.
Nov 2, 2018A00395$113.8KC490 - CURRENT ACTION ADDS WORK AND ALSO DE-SCOPES PREVIOUS AWARD IN SUPPORT OF CVN-71.
Oct 25, 2018A00394$608.7KPIA EXECUTION GROWTH
Oct 16, 2018A00393$225.3KPIA GROWTH WORK
Sep 29, 2018A00391$689.0KC490 - CVN 71 - PIA NEW GROWTH WORK, GROWTH WORK AND DE-OBLIGATIONS.
Sep 29, 2018A00392$-29.4KC490 - CVN 71 - PIA GROWTH WORK, RESERVE POOL RECONCILIATION AND DE-OBLIGATIONS.
Sep 28, 2018A00390$236.2KC490 - CVN 70 - CMAV 8A4 NEW WORK AND GROWTH WORK.
Sep 26, 2018A00387$1.4MC490 - CVN 71 - PIA NEW WORK, GROWTH WORK AND DE-OBLIGATIONS.
Sep 26, 2018A00388$1.7MFY 19 IAPA
Sep 26, 2018A00389$-10.4KC490 - CVN 70 - CMAV 8A4 NEW WORK, GROWTH WORK AND DEOBLIGATIONS.
Sep 25, 2018A00386$626.7KC490 - CVN 71 - PIA GROWTH WORK AND DE-OB.
Sep 22, 2018A00385$1.2MC490 - CVN 70 - CMAV 8A4 NEW WORK AND GROWTH WORK.
Sep 20, 2018A00384$649.7KFY 18 PIA GROWTH
Sep 18, 2018A00383$343.1KPIA GROWTH
Sep 14, 2018A00382$-567.7KCVN71 PIA GROWTH
Sep 13, 2018A00381$696.9KC490 - CVN 70 - CMAV 8A4 NEW WORK AND GROWTH WORK.
Sep 12, 2018A00380$-874.7KC490 - CVN 71 - PIA NEW AND GROWTH WORK.
Sep 10, 2018A00379$91.7KPIA NEW AND GROWTH WORK
Sep 6, 2018A00378$68.8KC490 - CVN 70 - CMAV 8A4 GROWTH WORK.
Sep 5, 2018A00377$77.5KC490 - CVN 71 - PIA GROWTH WORK.
Aug 30, 2018A00376$429.9KC490 - CVN 71 - PIA NEW AND GROWTH WORK.
Aug 28, 2018A00375$234.6K2018 PIA NEW + GROWTH WORK
Aug 27, 2018A00374$477.2KC490 - CVN 71 - PIA NEW AND GROWTH WORK.
Aug 23, 2018A00373$-1.7MCMAV + PIA ITEMS
Aug 21, 2018A00371$250.8KC490 - CVN 71 - PIA NEW AND GROWTH WORK.
Aug 21, 2018A00372$937.8KC490 - CVN 70 - CMAV 8A4 NEW WORK.
Aug 16, 2018A00370$-250.0K8A1 DEOBLIGATION
Aug 15, 2018A00369$270.5KC490 - CVN
Aug 9, 2018A00368$-1.0MC490 - CVN-71 DE-OBLIGATION OF FUNDS
Aug 7, 2018A00367$203.4KC490 - CVN 71 - PIA NEW AND GROWTH WORK.
Aug 6, 2018A00366$1.1MC490-CVN
Aug 2, 2018A00365$336.4KC490 - CVN
Jul 26, 2018A00363$954.3KC490 - CVN 71 - PIA AND CMAV 8A1, NEW AND GROWTH WORK.
Jul 26, 2018A00364$944.9KC490 - CVN
Jul 24, 2018A00362$1.2MCVN-71 PIA RESERVATION POOL CREATION AND FUNDING
Jul 23, 2018A00361$461.3KFY18 PIA ITEMS
Jul 17, 2018A00360$569.0KBASIC WORK PACKAGE AND SUPPLEMENTAL
Jul 12, 2018A00359$851.9KCVN-71 CMAV + PIA ITEMS
Jul 9, 2018A00358$4.9MC490 - CVN
Jul 6, 2018A00357$640.2KC430 - CVN
Jul 3, 2018A00356$15.0MCODE 490 - CVN-71 - PIA BASIC WORK PACKAGE AND SUPPLEMENTAL
Jul 2, 2018A00355$330.4KC490 - CVN 71 - CMAV 8A1 GROWTH WORK, NEW WORK, AND PIA WORK ITEM DEFINITIZATION.
Jun 22, 2018A00354$659.8KC490 - CVN 71 - CMAV 8A1 GROWTH WORK AND PIA WORK ITEM DEFINITIZATION.
Jun 21, 2018A00353$411.6KC490 - CVN 71 - CMAV 8A1 GROWTH WORK AND PIA WORK ITEM DEFINITIZATION.
Jun 14, 2018A00352$19.1KC490 - CVN 71 - NEW AND GROWTH WORK
Jun 8, 2018A00351$572.4KCODE 490- CVN'S CVN-71 PIA WORK ITEMS
Jun 7, 2018A00350$59.6KC490 - CVN
May 23, 2018A00349$56.8KC490 - CVN
May 17, 2018A00348$1.6MCODE 490 CVN'S NEW AND GROWTH WORK CVN-71 8A1
May 11, 2018A00347$259.4KCOPE 490 CVN'S 8A1 NEW AND GROWTH WORK
May 7, 2018A00346$1.1MCODE 490- CVN'S CVN-71 8A1 INDIVIDUAL ITEMS
May 3, 2018A00345$-279.0KC490-CVNS CVN-70 ADVANCE PLANNING 8A4
May 2, 2018A00344$887.9KC490-CVN 8A1 INDIVIDUAL ITEMS
Apr 30, 2018A00343$14.4MC490-CVN FY18 PIA BASIC WORK PACKAGE
Apr 20, 2018A00342$12.0MC490 - CVN
Apr 19, 2018A00341$1.1MC490 - CVN
Apr 11, 2018A00340$23.7KC490 - CVN
Apr 6, 2018A00339$1.2MC490 - CVN
Apr 4, 2018A00338$283.3KC490 - CVN
Mar 19, 2018A00337$277.9KC490 - CVN
Feb 15, 2018A00336$434.5KC490-CVN
Feb 8, 2018A00335$14.4KC490 - CVN PIO MATERIAL
Feb 2, 2018A00334$22.7KC490 - CVN PIO MATERIAL AND GROWTH WORK
Feb 1, 2018A00333$0C490-CVN VINSON ADMIN MOD TO CORRECT A00332 PAGE 2.
Jan 26, 2018A00332$-96.6KC490 - CVN
Jan 19, 2018A00331$382.7KROOSEVELT PIO AND EXECUTION PLANNING FOR LLTM.
Jan 11, 2018A00330$19.7KCVN 71 USS THEODORE ROOSEVELT ADV PLANNING
Jan 10, 2018A00329$0ADMIN CORRECTION MADE TO LOA EXERCISED ON MODS A00298 AND A00317.
Jan 5, 2018A00328$15.5KROOSEVELT PIO ITEMS CLIN 0007
Jan 2, 2018A00327$-114.0KBASIC WORK PACKAGE AND SUPPLEMENTAL
Dec 15, 2017A00326$333.4KNULKA PLANNING PROPOSAL.
Dec 14, 2017A00325$43.6KCVN-70 8A1 NEW AND GROWTH WORK
Dec 7, 2017A00324$156.1KROOSEVELT 8A1 PLANNING
Dec 6, 2017A00323$69.7KCARL VINSON 8A1 CMAV NEW AND GROWTH WORK.
Nov 22, 2017A00322$-210.3KVINSON 8A1 CAMV.
Nov 17, 2017A00320$500.1KCVN-70 8A1 AVAIL
Nov 17, 2017A00321$3.6MUSS THEODORE ROOSEVELT (CVN 71) FY18 EXECUTION PLANNING DEFINITIZATION.
Nov 7, 2017A00319$641CVN-71 PIO SHIPPING COSTS
Nov 2, 2017A00318$2.7MCVN-70 8A1 MAINTENANCE AVAILABILITY
Oct 24, 2017A00317$2.5KCVN-70 CIA CLOSEOUT AND 8A1 LLTM
Oct 18, 2017A00316$146.7KBASIC WORK PACKAGE AND SUPPLEMENTAL
Sep 29, 2017A00314$144.8KDEFINITIZE NEW AND GROWTH WORK FOR CVN 71 USS ROOSEVELT PER CONTRACTING OFFICER'S GUIDANCE CAR CORRECTED TO REVISE THE "COMPLETION/ESTIMATED COMPLETION" DATE FIELDS AS FOLLOWS: FROM: 09/30/2018 TO: 10/31/2017
Sep 29, 2017A00315$553.8KTO DEFINITIZE NEW AND GROWTH WORK FOR THE USS CARL VINSON (CVN 70)
Sep 28, 2017A00313$-29.1KDE-SCOPE WORK WITH TRAILER REFURBISHMENT
Sep 26, 2017A00312$-34.7KUSS ROOSEVELT NEW AND GROWTH WORK
Sep 22, 2017A00311$55.4KCVN-70 CIA GROWTH WORK
Sep 21, 2017A00309$169.1KCVN-71 7A4 GROWTH AND EMERGENT WORK REQUIREMENTS WITHIN SCOPE
Sep 21, 2017A00310$578.4KFY 18 IAPA LOGISTICS
Sep 15, 2017A00308$664.5KCVN-70 CIA, 8A1 PLANNING
Sep 8, 2017A00305$321.0KBASIC WORK PACKAGE AND SUPPLEMENTAL
Sep 8, 2017A00306$3.4MDEFINTIZE AND FULLY FUND FY18 IAPA.
Sep 8, 2017A00307$21.6KCVN 70 CIA GROWTH WORK
Aug 31, 2017A00304$-7.1KVINSON CIA NEW AND GROWTH ITEMS.
Aug 28, 2017A00303$117.3KCVN-70 CIA
Aug 25, 2017A00302$159.7KBASIC WORK PACKAGE AND SUPPLEMENTAL
Aug 24, 2017A00301$0REMOVAL OF MILSTRIP DATA FROM ALL SCLIN'S
Aug 23, 2017A00300$34.0KIAPA TRAVEL FY17 TO SUPPORT VINSON CIA
Aug 18, 2017A00299$650.3KCVN-71 PIA PLANNING, 7A4
Aug 15, 2017A00298$36.1KA00298 CVN 70 USS CARL VINSON CIA NEW WORK ITEMS
Aug 9, 2017A00297$825.1KSCD FOR THE CARL VINSON FY17 CIA
Aug 8, 2017A00296$3.9MVINSON FY17 CIA DEFINITIZATION.
Jul 31, 2017A00295$84.1KIAPA RELOCATION COST
Jul 28, 2017A00294$2.5KCVN 71 GROWTH WORK FOR 7A3
Jul 27, 2017A00293$17.7KLONG LEAD TIME FOR USS CARL VINSON
Jul 20, 2017A00292$35.4KROOSEVELT CM WORK.
Jul 14, 2017A00290$74.9KEMERGENT CHT REPAIRS ONBOARD USS CARL VINSON (CVN-70)
Jul 14, 2017A00291$179.3KFULLY FUND AND DEFINITIZE NEW AND GROWTH WORK ON CVN-71 7A3 AVAIL.
Jul 7, 2017A00289$67.3KUSS THEODORE ROOSEVELT (CVN 71) 7A3 GROWTH WORK
Jul 5, 2017A00288$469.3KUSS CARL VINSON EMERGENT WORK
Jun 30, 2017A00287$75.3KIGF::CT::IGF TO PAY OVERRUNS AND CORRECT ADMIN ERRORS.
Jun 27, 2017A00286$315.1KIGF::CT::IGF ROOSEVELT CM WORK
Jun 16, 2017A00285$1.3MIGF::CT::IGF CVN-71 CMAV 7A3 DEFINITIZATION
Jun 9, 2017A00282$2.8MIGF::CT::IGF PERIOD 4 AWARD FEE PAYMENT BASIC WORK PACKAGE AND SUPPLEMENTAL
Jun 9, 2017A00283$117.8KIGF::CT::IGF IAPA LOGISTICS TO COMPLETE TRAILER REFURBISHMENT.
Jun 9, 2017A00284$284.1KIGF::CT::IGF USS CARL VINSON BASIC WORK PACKAGE AND SUPPLEMENTAL
May 26, 2017A00281$62.8KIGF::CT:IGF
May 22, 2017A00280$230.1KIGF::CT::IGF
May 12, 2017A00279$-46.5KDEOBLIGATION OF UCLASS FUNDING
May 11, 2017P00006$0IGF::OT::IGF BASIC WORK PACKAGE AND SUPPLEMENTAL
May 5, 2017A00278$98.6KIGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO FULLY FUND AND DEFINITIZE GROWTH WORK IN SUPPORT OF USS CARL VINSON (CVN70) FY17 CMAV SSSD HISM-CVN70-17-S002 IN ACCORDANCE WITH SECTION B OF THE BASIC CONTRACT
Apr 28, 2017A00277$27.8KIGF::CT::IGF
Apr 18, 2017A00276$34.4KIGF::CT::IGF
Apr 13, 2017A00275$-2.6MIGF::CT::IGF USS THEODORE ROOSEVELT DESCOPE RCCS.
Apr 6, 2017P00005$0IGF::OT::IGF BASIC WORK PACKAGE AND SUPPLEMENTAL
Mar 29, 2017A00274$-439.4KIGF::CT::IGF
Mar 24, 2017A00273$87.4KIGF::CT::IGF
Mar 24, 2017P00004$0IGF::OT::IGF BASIC WORK PACKAGE AND SUPPLEMENTAL
Feb 22, 2017A00272$17.3KIGF::CT::IGF - UPWARD OBLIGATIONS.
Feb 17, 2017A00271$-464.1KCVN 71 FY16 PIA CLOSEOUT AND CVN 71 CONTINUOUS MAINTENANCE
Jan 5, 2017A00270$9.8KIGF::CT::IGF - THE PURPOSE FOR THIS MODIFICATION IS TO ADD PIO WORK ITEM WORK WITHIN SCOPE.
Jan 4, 2017A00269$-14.3KIGF::CT::IGF - ADMINISTRATIVE CORRECTION TO REMOVE WORK ITEM 000-00-079 SCLIN 0026AF IN THE AMOUNT OF $14,877 FROM MOD A00268 DUE TO AN ADMIN ERROR.
Jan 3, 2017A00268$-474.2KIGF::CT::IGF
Dec 13, 2016A00267$-321.2KIGF::CT::IGF NEW AND GROWTH WORK FOR ROOSEVELT FY16 PIA
Nov 29, 2016A00266$58.9KIGF::CT::IGF - BASIC WORK PACKAGE AND SUPPLEMENTAL
Nov 18, 2016A00265$-30.1KIGF::CT::IGF - BASIC WORK PACKAGE AND SUPPLEMENTAL
Nov 14, 2016A00264$262.2KROOSEVELT FY16 PIA NEW AND GROWTH WORK.
Oct 25, 2016A00263$6.5KADMIN CORRECTIONS FOR MODS A00260 AND A00249 ON USS CARL VINSON (CVN 70)
Oct 21, 2016A00262$-401.2KIGF::CT:IGF - BASIC WORK PACKAGE AND SUPPLEMENTAL
Sep 30, 2016A00261$2.5MIGF::CT::IGF
Sep 27, 2016A00260$1.1MIGF::CT::IGF - ADMINISTRATIVE CORRECTION TO AWARD FEE A00255, DEFINITIZE NEW WORK UNDER CM AND DESCOPE FY15 USS CARL VINSON (CVN 70) PIA GROWTH WORK.
Sep 26, 2016A00259$508.4KIGF::CT::IGF
Sep 24, 2016A00258$3.2MFY17 IAPA LOGISTICS
Sep 22, 2016A00257$1.2MIN SCOPE CHANGE ORDERS. 118 RCCS PROCESSED AND DEFINITIZED PER THIS MODIFICATION.
Sep 20, 2016A00256$52.2KIGF::CT:: IGF - UPWARD OBLIGATION OF $52,240 TO SCLIN 0012AK.
Sep 15, 2016A00255$989.9KIGF::CT::IGF
Aug 24, 2016A00253$-495.8KIGF::CT::IGF
Aug 24, 2016A00254$677.2KBASIC WORK PACKAGE AND SUPPLEMENTAL
Aug 18, 2016A00252$497.0KIGF::CT::IGF
Jul 29, 2016A00251$969.6KIGF::CT::IGF
Jul 21, 2016A00250$28.1KIGF::CT::IGF
Jul 20, 2016A00249$118.2KIGF::CT:IGF
Jul 7, 2016A00248$983.3KIGF::CT::IGF
Jun 28, 2016A00247$-3.1MIGF::CT:IGF
Jun 9, 2016A00246$979.6KIGF::CT::IGF ACCOMPLISH FY16 ROOSEVELT PIA
Jun 3, 2016A00245$669.7KIGF::CT::IGF
May 24, 2016A00244$47.1KIGF::CT::IGF ACCOMPLISH FY16 PIA ROOSEVELT IAPA
May 19, 2016A00243$4.3MIGF::CT::IGF
May 5, 2016A00242$-1.7MIGF::CT::IGF UPDATE BASIC AND SUPPLEMENTAL WORK PACKAGES TO REFLECT WORK ITEMS THAT HAVE BEEN DELETED.
May 3, 2016A00241$372.9KIGF::CT::IGF ACCOMPLISH TR (CVN 71) 6A2 AVAIL.
Apr 29, 2016A00240$0IGF::CT::IGF
Apr 15, 2016A00239$24.4KADMINISTRATIVE CHANGE TO A00237, CVN 71 SUPPLEMENTAL. IGF::CT::IGF
Apr 14, 2016A00238$1.3MIGF::CT::IGF ACCOMPLISH CVN71 FY16 6A2 AVAIL SCLIN ACRN WORK ITEM # RCC ESTIMATED COST SCHEDULE INCENTIVE FEE OBLIGATED 1.232% COST INCENTIVE FEE OBLIGATED 4.0% COMMITTED AWARD FEE POOL 4.268% TOTAL 0026AF DV 100-11-902 $161,665 $1,874 $6,086 $6,493 $176,118 0026AF DV 120-11-901 $158,460 $1,751 $5,684 $6,065 $171,960 0026AF DV 542-80-901 $428,297 $4,708 $15,286 $16,311 $464,602 0026AF DV 587-50-302 $130,599 $1,441 $4,680 $4,994 $141,714 0026AF DV 993-11-935 16N $15,582 $172 $559 $596 $16,909 SUBTOTAL $894,603 $9,947 $32,295 $34,459 $971,304 0026AF DV 120-11-901 6G $0 $0 $0 $0 $0 0026AF DV 512-11-945 7G -$5,434 -$60 -$194 -$207 -$5,896 0026AF DV 123-11-902 8G $8,792 $108 $352 $375 $9,627 0026AF DV 634-11-933 10G -$1,908 -$24 -$76 -$81 -$2,089 0026AF DV 542-80-901 11G $1,398 $15 $50 $53 $1,517 0026AF DV 634-11-931 12G $2,804 $35 $112 $120 $3,070 0026AF DV 528-11-901 13G $30,723 $339 $1,102 $1,176 $33,340 0026AF DV 897-11-002 14G $104,627 $1,288 $4,180 $4,460 $114,555 0026AF DV 634-11-601 15G $3,320 $41 $133 $142 $3,635 0026AF DV 521-11-901 17G $9,939 $122 $398 $424 $10,883 0026AF DV 244-11-902 20G $16,514 $182 $592 $632 $17,920 0026AF DV 529-21-901 21G $8,500 $94 $304 $324 $9,221 0026AF DV 167-11-901 22G $22,504 $249 $807 $861 $24,421 0026AF DV 635-11-802 24G $36,544 $404 $1,311 $1,399 $39,657 0026AF DV 631-11-902 25G $5,845 $65 $210 $224 $6,343 0026AF DV 512-11-945 27G $6,934 $76 $248 $265 $7,523 0026AF DV 167-11907 28G $12,836 $158 $513 $548 $14,055 0026AF DV 635-11-802 29G $12,063 $133 $433 $462 $13,091 0026AF DV 167-11-902 30G $9,755 $120 $390 $416 $10,682 0026AF DV 123-11-902 32G $15,409 $190 $616 $658 $16,873 0026AF DV 631-11-801 34G $9,934 $110 $356 $380 $10,780 0026AF DV 635-11-802 35G $2,625 $29 $94 $100 $2,849 0026AF DV 992-11-002 36G $9,606 $106 $343 $366 $10,420 0026AF DV 631-11-903 37G $1,381 $15 $50 $53 $1,499 SUBTOTAL $324,711 $3,795 $12,323 $13,148 $353,978 0026AF DV TOTAL $1,219,314 $13,742 $44,618 $47,607 $1,325,282 0025AC DS 813-11-716 42NG $1,681 $19 $60 $64 $1,824 0026AH DW 654-90-901 18G $13,033 $143 $466 $497 $14,139 0026AH DW 654-90-901 33G $2,405 $26 $86 $92 $2,609 0026AH DW 654-90-901 39G $504 $6 $18 $19 $547 SUBTOTAL $15,942 $175 $569 $608 $17,295 TOTAL $1,236,937 $13,936 $45,248 $48,279 $1,344,401
Apr 8, 2016A00237$7.0MIGF::CT::IGF USS THEODORE ROOSEVELT (CVN 71) PIA SUP ONE
Apr 5, 2016A00235$2.0MIGF::CT::IGF ACCOMPLISH CVN 71 FY16 6A2, PMO AND TEMP SERVICES
Apr 5, 2016A00236$24.7MFY16 CVN71 BASIC IGF::CT::IGF SCLINACRNWORK ITEM #RCC EST COST SCHED INCENTIVEFEE OBL 1.232% COST INCENTIVE FEE OBLIGATED 4.0% COMMITTED AWARD FEE POOL 4.268% TOTAL 0017AA EC TYCOM BASIC $22,669,460 $260,591 $846,074 $902,761 $24,678,885 0017AB EC TYCOM TRAVEL $671,182 $0 $0 $0 $671,182 0017AE ED AIT 993-11-900 $162,060 $1,787 $5,803 $6,192 $175,842 0017AD EA AIT 993-11-901 $33,289 $368 $1,194 $1,274 $36,125 0017AF EE AIT 993-11-905 $14,996 $166 $538 $574 $16,274 TOTAL $23,550,987 $262,911 $853,609 $910,800 $25,578,308
Apr 1, 2016A00234$1.5MIGF::CT::IGF ACCOMPLISH CVN 71 FY16 6A2 SOUND DAMPENING PANELS AND POP EXT ON CLIN 0025
Mar 30, 2016A00233$-1.8MIGF::CT::IGF USS CARL VINSON (CVN 70) DEOBLIGATIONS
Mar 22, 2016A00232$2.2MIGF::CT::IGF CVN 71 ROOSEVELT 6A2 THE BASIC CONTRACT, AS FOLLOWS: SCLIN ACRN WORK ITEM # RCC EC SIFO CIFO CAFP TOTAL 0026AF DV 042-11-701 $13,045 $149 $484 $517 $14,195 0026AF DV 077-11-001 $18,691 $230 $748 $798 $20,467 0026AF DV 123-11-902 $14,146 $174 $566 $604 $15,490 0026AF DV 130-11-909 $19,339 $238 $774 $825 $21,176 0026AF DV 167-11-902 $16,923 $208 $677 $722 $18,531 0026AF DV 167-11-907 $11,412 $141 $456 $487 $12,496 0026AF DV 512-11-905 $18,298 $225 $732 $781 $20,036 0026AF DV 512-11-910 $8,325 $92 $298 $317 $9,032 0026AF DV 512-11-913 $7,378 $81 $264 $282 $8,005 0026AF DV 512-11-917 $19,379 $239 $775 $827 $21,220 0026AF DV 512-11-918 $16,960 $209 $678 $724 $18,571 0026AF DV 512-11-919 $19,379 $239 $775 $827 $21,220 0026AF DV 512-11-925 $18,815 $232 $753 $803 $20,602 0026AF DV 512-11-929 $19,323 $238 $773 $825 $21,159 0026AF DV 512-11-931 $19,984 $246 $799 $853 $21,882 0026AF DV 512-11-935 $18,384 $226 $735 $785 $20,130 0026AF DV 512-11-938 $23,358 $258 $837 $894 $25,347 0026AF DV 512-11-945 $12,118 $133 $433 $462 $13,147 0026AF DV 514-11-902 $14,368 $158 $514 $548 $15,589 0026AF DV 521-11-901 $10,004 $123 $400 $427 $10,954 0026AF DV 529-21-901 $6,170 $68 $221 $235 $6,694 0026AF DV 588-10-702 $29,208 $360$1,168 $1,247 $31,983 0026AF DV623-11-901 $7,981 $98 $319 $341 $8,739 0026AF DV631-11-801 $219,020 $2,420 $7,857 $8,383 $237,680 0026AF DV631-11-902 $91,761 $1,014 $3,292 $3,512 $99,579 0026AF DV631-11-903 $143,405 $1,584 $5,144 $5,489 $155,623 0026AF DV 634-11-601 $14,312 $176 $572 $611 $15,672 0026AF DV634-11-930 $48,041 $592 $1,922 $2,050 $52,605 0026AF DV634-11-931 $48,041 $592 $1,922 $2,050 $52,605 0026AF DV634-11-933 $7,895 $97 $316 $337 $8,645 0026AF DV634-11-934 $5,372 $66 $215 $229 $5,882 0026AF DV634-11-935 $3,647 $45 $146 $156 $3,993 0026AF DV665-80-902 $25,443 $280 $908 $969 $27,599 0026AF DV665-80-903 $69,257 $761 $2,472 $2,637 $75,127 0026AF DV992-11-003 $251,444$3,098 $10,058 $10,732 $275,331 0026AF DV992-11-701 $21,839 $269 $874 $932 $23,914 0026AF DV993-11-701 $251,582 $2,779 $9,024 $9,629 $273,015 0026AF DV993-11-919 $30,766 $340 $1,104 $1,177 $33,387 0026AF DV993-11-920 $30,887 $341 $1,108 $1,182 $33,518 SUBTOTAL$1,625,700 $18,822 $61,112 $65,206 $1,770,841 0026AFDV631-11-903 1G $3,061 $34 $110 $117 $3,322 0026AFDV631-11-801 2G $716 $8 $26 $27 $777 0026AFDV631-11-801 3G $1,427 $16 $51 $55 $1,549 0026AFDV512-11-910 4G $1,392 $15 $50 $53 $1,511 0026AFDV512-11-938 5G $52,814 $581 $1,887 $2,013 $57,295 SUBTOTAL $59,410 $654 $2,123 $2,265 $64,453 0026AFDV SUBTOTAL$1,685,110 $19,476 $63,235 $67,472 $1,835,293 0025ACDS813-11-716 41NG $5,163 $54 $176 $188 $5,580 0025ACDS813-11-716 27NG $6,574 $81 $263 $281 $7,199 0025ACDS992-11-702 23N $209,482 $2,315 $7,515 $8,019 $227,330 SUBTOTAL $221,219 $2,450 $7,954 $8,487 $240,109 0026AHDW654-90-901$128,353 $1,411 $4,582$4,889 $139,235 0026AJ EB993-11-932$25,510 $282 $915 $976 $27,683 TOTAL $2,060,192 $23,619 $76,686 $81,823 $2,242,320
Mar 2, 2016A00231$1.2MIGF::CT::IGF FY16 ROOSEVELT (CVN 71) PIA PLANNING, 6A1, 6A2, 6CM, DESCOPES
Feb 24, 2016A00230$-71.0KCARL VINSON FY15 PIA TYCOM IGF::CT::IGF
Feb 2, 2016A00229$281.9KIGF::CT::IGF USS CARL VINSON (CVN 70) FY15 PIA
Feb 1, 2016A00228$226.6KIGF::CT::IGF 1. THE PURPOSE OF THIS MODIFICATION IS TO FULLY FUND AND DEFINITIZE NEW AND GROWTH WORK FOR THE USS THEODORE ROOSEVELT (CVN-71) FY16 6A1, 6CM, AND PIA LLTM IN ACCORDANCE WITH SECTION B OF THE BASIC CONTRACT, AS FOLLOWS: SCLIN ACRN WORK ITEM # RCC ESTIMATED COST SCHEDULE INCENTIVE FEE OBLIGATED 1.232% COST INCENTIVE FEE OBLIGATED 4.0% COMMITTED AWARD FEE POOL 4.268% TOTAL 0026AD DV 634-11-803 5G -$6,313 -$78 -$253 -$269 -$6,913 0026AD DV 634-11-806 8G $0 $0 $0 $0 $0 0026AD DV 426-22-901 18NG $15,887 $196 $635 $678 $17,396 0026AD DV 533-11-901 19NG -$18,680 -$230 -$747 -$797 -$20,455 0026AD DV 992-11-803 20G $35,329 $415 $1,349 $1,439 $38,532 0026AD DV 634-11-805 21G $1,116 $14 $45 $48 $1,222 0026AD DV 631-13-802 22G $23,468 $289 $939 $1,002 $25,697 0026AD DV 587-11-601 24NG $7,494 $92 $300 $320 $8,206 0026AD DV 426-22-901 25G $3,103 $38 $124 $132 $3,398 0026AD DV 533-11-901 12N $18,680 $230 $747 $797 $20,455 0026AD DV 587-11-601 23N $3,021 $37 $121 $129 $3,308 SUBTOTAL $83,105 $1,004 $3,260 $3,478 $90,847 0026AE DV 587-11-601 24NG $500 $0 $0 $0 $500 SUBTOTAL $500 $0 $0 $0 $500 0025AC DS 813-11-716 13NG $1,121 $12 $40 $43 $1,216 0025AC DS 813-11-716 14NG $4,262 $47 $153 $163 $4,625 0025AC DS 813-11-716 15NG $5,174 $57 $186 $198 $5,615 0025AC DS 813-11-716 16NG $3,115 $34 $112 $119 $3,380 0025AC DS 813-11-716 17NG $1,901 $21 $68 $73 $2,063 0025AC DS 813-11-716 18NG $5,003 $55 $179 $192 $5,429 0025AC DS 813-11-716 19NG $3,937 $49 $157 $168 $4,311 0025AC DS 813-11-716 20NG $4,327 $48 $155 $165 $4,695 0025AC DS 813-11-716 21NG $38,364 $473 $1,535 $1,637 $42,009 0025AC DS 813-11-716 22NG $61,546 $758 $2,462 $2,627 $67,393 0025AC DS 813-11-716 26NG $281 $3 $11 $12 $308 SUBTOTAL $129,031 $1,558 $5,058 $5,397 $141,044 0026AC DV 635-11-801 4G $1,860 $23 $74 $79 $2,037 0026AC DV 635-11-801 5G $1,116 $12 $40 $43 $1,211 SUBTOTAL $2,976 $35 $114 $122 $3,248 TOTAL $215,612 $2,597 $8,432 $8,997 $235,638
Jan 27, 2016A00227$3.8KIGF::CT::IGF 1. THE PURPOSE OF THIS MODIFICATION IS TO: A.PURSUANT TO FAR 52.217-7, OPTION FOR INCREASED QUANTITY SEPARATELY PRICED LINE ITEM, OPTION CLIN 0020, ACCOMPLISH INTER-AVAILABILITY PLANNING AND ADMINISTRATION(IAPA) FOR FY16, CVN 68 AND CVN 78 CLASS SHIPS, IS HEREBY EXERCISED. B. THE IAPA IS HEREBY DEFINITIZED AND FULLY FUNDED AS INDICATED BELOW: SCLIN ACRN WORK ITEM # ESTIMATED COST SCHEDULE INCENTIVE FEE OBLIGATED 1.232% COST INCENTIVE FEE OBLIGATED 4.0% COMMITTED AWARD FEE POOL 4.268% TOTAL 0020AC DX 992-11-501C $1,143 $14 $46 $49 $1,252 0020AD DX 897-11-501 $2,564 $0 $0 $0 $2,564 TOTAL $3,707 $14 $46 $49 $3,816

Research next steps

  1. Verify whether remaining options may extend performance beyond the current end date.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.