Federal contract award

N0002414C2111

PY1 RCOH DEFUELING ADVANCE PLANNING

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeSUP OF SHIPBUILDING CONV AND REPAIR
NAICS336611 — Ship Building and Repairing
PSC1905 — Combat Ships and Landing Vessels
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$801.1M
Current contract value$832.3M
Potential contract value / ceiling$832.3M
Start dateAug 1, 2014
Current end dateSep 1, 2017
Potential end dateSep 1, 2017
Latest award activityMay 8, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 168 of 168 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 8, 2026A00110$0CVN73 (AP): PERIODIC RELEASE MODIFICATION JANUARY 1, 2025 TO JUNE 31, 2025.
Jan 30, 2026A00109$0GOVERNMENT FURNISHED PROPERTY TRANSFER TO N00024-21-C-2106 AND N00024-24-C-2106
Dec 19, 2025A00108$0TRANSFER OF GOVERNMENT PROPERTY FROM CVN73 AP TO CVN74 EX AND CVN75 AP.
Nov 19, 2025A00107$0CVN 73(AP):PERIODIC RELEASE MODIFICATION JULY 1,2024 TO DECEMBER 31, 2024.
Aug 28, 2025A00106$0GOVERNMENT PROPERTY TRANSFERRED FROM CONTRACT N00024-14-C-2111 TO CONTRACT N00024-24-C-2106.
Jul 31, 2025A00105$0FY15 RCOH ADVANCE PLANNING TRANSFER OF MATERIAL FROM CVN73 AP TO FACILITIES CONTRACT.
May 20, 2025A00104$0CVN 75(AP) 1 JAN 2024 TO 30 JUNE 2024 PERIODIC RELEASE MODIFICATION.
Dec 19, 2024A00103$0TRANSFER PROPERTY FROM CONTRACT N00024-14-C-2111 (CVN 73 ADVANCED PLANNING) TO CONTRACT N00024-24-C-2106 (CVN 75 ADVANCED PLANNING).
Nov 6, 2024A00102$0PERIODIC RELEASE MODIFICATION
Jul 26, 2024A00101$0TRANSFER OF MATERIAL FROM CVN73 ADVANCED PLANNING TO CVN75 ADVANCED PLANNING.
May 3, 2024A00100$0PRM 1 JAN - 30 JUN 2023
Jan 24, 2024A00099$0CVN 73 EX TO CVN 74 EX- GOVERNMENT PROPERTY MODIFICATION
Nov 9, 2023A00098$0PERIODIC RELEASE MOD 1 JULY - 31 DECEMBER 2022
Oct 31, 2023A00097$0GFP TRANSFER FROM N00024-14-C-2111 TO N00024-21-C-2106
Sep 13, 2023A00096$0GFP MOD FROM N00024-14-C-2111 TO N00024-21-C-2106
Aug 9, 2023A00095$0GFP TRANSFER FROM N00024-14-C-2111 TO N00024-21-C-2106.
May 16, 2023A00094$0CVN 73 AP TO CVN 74 EX GOV. PROPERTY MOD
May 12, 2023A00093$0PERIODIC RELEASE MOD 1JAN-30JUN 2022
Apr 13, 2023A00092$0CVN 73 AP TO CVN 74 EX GOVERNMENT PROPERTY MOD
Mar 3, 2023A00091$0GOVERNMENT FURNISHED PROPERTY TRANSFER
Jan 25, 2023A00090$0CVN 73 AP GP MOD
Nov 23, 2022A00089$0FY15 REFUELING COMPLEX OVERHAUL ADVANCE PLANNING
Oct 25, 2022A00088$0GOVERNMENT PROPERTY TRANSFER
Aug 12, 2022A00087$0TRANSFERRING GOVERNMENT PROPERTY
Jun 10, 2022A00086$0FY15 REFUELING AND COMPLEX OVERHAUL ADVANCE PLANNING
May 27, 2022A00085$0FY15 REFUELING AND COMPLEX OVERHAUL ADVANCE PLANNING
May 17, 2022A00084$0GOVERNMENT PROPERTY TRANSFER
Mar 22, 2022A00083$0FY15 REFUELING AND COMPLEX OVERHAUL ADVANCE PLANNING ACTION
Mar 1, 2022P00058$-3.8MFY15 RCOH ADVANCE PLANNING
Feb 10, 2022A00082$0FY15 REFUELING AND COMPLEX OVERHAUL ADVANCE PLANNING
Nov 12, 2021A00081$0PERIODIC RELEASE MODIFICATION
Aug 13, 2021A00080$0FY15 REFUELING COMPLEX OVERHAUL ADVANCE PLANNING
Jun 22, 2021P00057$0FY15 RCOH ADVANCE PLANNING
May 12, 2021P00056$-5.2MFY15 RCOH ADVANCE PLANNING
May 7, 2021A00079$0FY15 RCOH ADVANCE PLANNING - PERIODIC RELEASE JAN - MAR 2020
Apr 15, 2021P00055$-1.8MDE-OBLIGATION OF UNLIQUIDATED FUNDS
Nov 4, 2020A00078$0PERIODIC RELEASE MODIFICATION FOR THE CYCLE JUL-DEC 2019
Sep 24, 2020P00054$-5.5MFY15 RCOH ADVANCE PLANNING
Sep 22, 2020A00077$0INCLUDE FAR 52.204-25
Sep 15, 2020AB2001$0ESTABLISH CLAUSE ADD FAR 52.204-25
May 6, 2020A00076$0PERIODIC RELEASE MOD 1/01/2019-06/30/2019
Apr 16, 2020A00075$1.7MCVN 73 RCOH HUNTINGTON HALL BERTHING AND MESSING FOR PERIOD 23 MARCH 2020 THROUGH 20 SEPTEMBER 2020
Feb 18, 2020A00074$0CVN 73 RCOH HUNTINGTON HALL BERTHING AND MESSING ADMIN MOD
Nov 5, 2019A00073$0FY15 RCOH ADVANCE PLANNING
Nov 1, 2019P00053$-970.6KFY15 RCOH ADVANCE PLANNING
Oct 3, 2019A00072$913.1KCVN 73 RCOH HUNTINGTON HALL BERTHING AND MESSING FOR PERIOD 23 SEP 2019 THROUGH 22 MARCH 2020
Sep 4, 2019P00052$-10.9MCVN 73 RCOH AP DE-OBLIGATION CLIN 0015
Jun 20, 2019P00051$-979.4KFY15 RCOH ADVANCE PLANNING - DEOBLIGATION OF ULO FROM COMPLETED COST CLIN
May 21, 2019A00071$0FY15 RCOH ADVANCE PLANNING
Apr 12, 2019A00070$1.2MCVN 73 RCOH HUNTINGTON HALL BERTHING AND MESSING FOR PERIOD 25 MARCH 2019 THROUGH 22 SEPTEMBER 2019
Mar 29, 2019P00050$0FY15 RCOH ADVANCE PLANNING
Mar 13, 2019P00049$0FY15 RCOH ADVANCE PLANNING
Nov 6, 2018P00048$374.4KFY15 RCOH ADVANCE PLANNING
Sep 28, 2018A00068$1.2MCVN 73 RCOH HUNTINGTON HALL BERTHING AND MESSING FOR PERIOD 24 SEP 2018 THROUGH 24 MARCH 2019
Aug 28, 2018P00047$0FY15 RCOH ADVANCE PLANNING
Aug 7, 2018P00046$0FY15 RCOH ADVANCE PLANNING CLIN 0006 POP EXTENSION
Jul 5, 2018P00045$0CVN 73 RCOH AP CONTRACT POP EXTENSION TO SUPPORT CVN 74 PRE-AP SHIP CHECKS
Jun 20, 2018P00044$0FY15 RCOH ADVANCE PLANNING
May 31, 2018P00043$0CVN 73 RCOH ADVANCE PLANNING CLIN 0019 POP EXTENSION
May 14, 2018P00042$553.8KFY15 RCOH ADVANCE PLANNING MATERIAL
Apr 13, 2018P00041$62.7KFY15 RCOH ADVANCE PLANNING
Apr 9, 2018A00067$1.2MCVN 73 RCOH HUNTINGTON HALL BERTHING AND MESSING FOR PERIOD 26 MARCH 2018 THROUGH 23 SEPTEMBER 2018.
Feb 21, 2018P00040$0FY15 RCOH ADVANCE PLANNING
Feb 15, 2018A00066$0CVN 73 RCOH ADVANCE PLANNING, CANCELLATION OF E&S POOL FMR 74.00&FMR 79.00.
Feb 5, 2018P00039$-32.0MFY15 RCOH ADVANCE PLANNING
Feb 2, 2018P00038$0FY15 RCOH ADVANCE PLANNING
Jan 26, 2018A00065$0CVN 73 RCOH ADVANCE PLANNING, ADJUDICATION OF E&S POOL MRC PROPOSAL 72.
Jan 25, 2018A00064$0CVN 73 RCOH ADVANCE PLANNING, ADJUDICATION OF E&S POOL MATERIAL PROPOSAL 50 FOR FUKUSHIMA RELATED REMEDIATION OF PRIORITY 4 VENTILATION SYSTEMS.
Jan 11, 2018A00063$0CVN 73 RCOH ADVANCE PLANNING, ADJUDICATION OF CLIN 0015 E&S POOL MATERIAL PROPOSALS 28A, 49A, 70, 71&42.
Dec 18, 2017P00037$15.6MFY15 RCOH ADVANCE PLANNING
Dec 1, 2017P00035$0FY15 RCOH ADVANCE PLANNING
Nov 29, 2017A00062$0CVN 73 RCOH ADVANCE PLANNING, ADJUDICATION OF E&S POOL MRC PROPOSALS 53, 56, 57, 65, 68&69.
Nov 7, 2017A00061$0CVN 73 RCOH ADVANCE PLANNING, NOC PERIODIC RELEASE MOD FOR PERIOD JAN 1, 2017 THROUGH JUNE 30, 2017.
Nov 1, 2017P00034$6.9MFY15 RCOH ADVANCE PLANNING
Oct 12, 2017A00060$-2.5KCVN 73 RCOH ADVANCE PLANNING, CLIN 0017 POP EXTENSION AND SOW REVISION.
Oct 6, 2017P00033$2.7MIGF::CT::IGF RCOH ADVANCE PLANNING
Sep 30, 2017A00059$0CVN 73 RCOH ADVANCE PLANNING, UPDATE CONTRACT ATTACHMENTS K&L TO ACCOUNT FOR THE ADJUDICATION OF E&S POOL MRC PROPOSALS 61, 63, 64&67.
Sep 26, 2017A00058$0CANCEL AND SUPERSEDE A00056
Sep 22, 2017A00057$1.1MCVN 73 RCOH AP HUNTINGTON HALL BERTHING AND MESSING FOR PERIOD 25 SEP 17 THROUGH 25 MAR 18.
Sep 11, 2017A00056$0UPDATE DFARS 252.204-7012
Aug 11, 2017P00032$31.0MAUTHORIZATION OF WORK BEYOND PREPARATORY PHASE OF RCOH
Aug 4, 2017P00031$0CVN 73 RCOH ACCOMPLISHMENT
Jul 12, 2017A00055$0CVN 73 RCOH ADVANCE PLANNING, AUTHORIZATION OF E&S POOL MRC #S 224&225.
Jul 6, 2017A00052$0CVN 73 RCOH ADVANCE PLANNING, AUTHORIZATION OF E&S POOL MRC#S 149, 196, 218, 219, 220, 221, 222, 148, 217, 124, 223, 195, 211&212.
Jul 6, 2017A00053$0CVN 73 RCOH ADVANCE PLANNING, AUTHORIZATION OF E&S POOL MRC#S 126&213-216.
Jul 6, 2017A00054$0CVN 73 RCOH ADVANCE PLANNING, AUTHORIZATION OF E&S POOL MRC#S 206-209.
Jul 5, 2017P00030$9.7MINCREASE TO EMERGENT&SUPPLEMENTAL MATERIAL
Jun 8, 2017A00051$0CVN 73 RCOH ADVANCE PLANNING, AUTHORIZATION OF E&S POOL FMR 167.00&FMR 168.00.
Jun 8, 2017P00029$2.9MINCREMENTAL FUNDING AND ADMIN CORRECTION
Jun 6, 2017A00050$0CVN 73 RCOH ADVANCE PLANNING, AUTHORIZATION OF E&S POOL MRC REQUEST #205.
Jun 1, 2017A00049$0CVN 73 RCOH ADVANCE PLANNING, NOC PERIODIC RELEASE MODIFICATION, PERIOD JULY 1, 2016 THROUGH DECEMBER 31, 2016.
May 12, 2017P00028$7.5MFUND EARNED PLANNING YEAR 2 SPECIAL INCENTIVES
May 4, 2017A00047$0CVN 73 RCOH ADVANCE PLANNING, AUTHORIZATION OF E&S POOL MRC #S 129, 197, 198, 199, 200, 201, 203&204.
May 4, 2017A00048$0CVN 73 RCOH ADVANCE PLANNING, AUTHORIZATION OF E&S POOL MRC #S 156, 172, 177, 179, 182, 183, 185, 186, 187, 190, 192, 193&194.
May 4, 2017P00027$7.6MADDITIONAL FUNDING AND INCREASE TO EMERGENT AND SUPPLEMENTAL MATERIAL.
Apr 24, 2017A00046$0CVN 73 AP RCOH ADVANCE PLANNING, ADJUDICATION OF E&S POOL MRC PROPOSAL 58 AND MRC PROPOSAL 60.
Apr 17, 2017A00045$0CVN 73 RCOH ADVANCE PLANNING, AUTHORIZATION OF E&S POOL MRC #188.
Mar 30, 2017A00044$0CVN 73 RCOH ADVANCE PLANNING, ADJUDICATION OF E&S POOL MRC PROPOSALS 54 AND 55.
Mar 29, 2017A00043$1.3MCVN 73 RCOH ADVANCE PLANNING, CLIN 0018, HUNTINGTON HALL OFF-SHIP BERTHING AND MESSING FOR PERIOD 27 MARCH 2017 THROUGH 24 SEPTEMBER 2017.
Mar 27, 2017A00041$0CVN 73 RCOH ADVANCE PLANNING, AUTHORIZATION OF E&S POOL MRC PROPOSALS 56&57 (I.E. MRCS 165, 175, 162, 164&184)
Mar 27, 2017A00042$0CVN 73 RCOH ADVANCE PLANNING, AUTHORIZATION OF E&S POOL MRC 173.
Mar 14, 2017A00040$0CVN 73 RCOH ADVANCE PLANNING, AUTHORIZATION OF E&S POOL MRC ITEM 181.
Mar 13, 2017A00039$0CVN 73 RCOH ADVANCE PLANNING, AUTHORIZATION OF E&S POOL FMR 138.00.
Mar 10, 2017A00038$0CVN 73 RCOH ADVANCE PLANNING, ADJUDICATION OF E&S POOL MRC PROPOSALS 39, 47&49.
Mar 1, 2017A00037$0CVN 73 RCOH ADVANCE PLANNING, ADJUDICATION OF E&S POOL MRC PROPOSALS 43, 46, 48, 51&52.
Feb 27, 2017A00036$0CVN 73 RCOH ADVANCE PLANNING, AUTHORIZATION OF E&S POOL FMR 121.00, FMR 122.00&FMR 123.00.
Feb 17, 2017P00026$4.3MFY15 RCOH ADVANCE PLANNING
Feb 16, 2017A00035$0CVN 73 RCOH ADVANCE PLANNING, AUTHORIZATION OF E&S POOL FMR 120.00.
Feb 13, 2017A00034$0CVN 73 RCOH ADVANCE PLANNING, AUTHORIZATION OF E&S POOL MRC 132.
Feb 10, 2017A00032$0FY15 RCOH ADVANCE PLANNING, AUTHORIZATION OF MRC 131
Feb 10, 2017A00033$0CVN 73 RCOH ADVANCE PLANNING, AUTHORIZATION OF E&S POOL MATERIAL PROPOSAL 50 FOR FUKUSHIMA RELATED DRY ICE CLEANING OF PRI 4 VENT SYSTEMS.
Feb 2, 2017A00031$0FY15 RCOH ADVANCE PLANNING, AUTHORIZATION OF E&S POOL (FMR 79.00)
Jan 27, 2017A00030$0CVN 73 RCOH ADVANCE PLANNING, AUTHORIZATION OF E&S POOL (FMR 75.00&76.00 )
Jan 17, 2017A00029$0CVN 73 RCOH ADVANCE PLANNING, AUTHORIZATION OF E&S POOL FMR 74.00.
Jan 6, 2017A00028$0CVN 73 RCOH ADVANCE PLANNING, ADJUDICATION OF E&S POOL MRC PROPOSALS 38 AND 41.
Dec 22, 2016P00025$0ALLOTMENT OF FUNDS ADJUSTMENT FOR CLIN 0019
Dec 16, 2016A00027$0CVN 73 RCOH ADVANCE PLANNING, ADJUDICATION OF E&S POOL MRC PROPOSALS 13A, 29, 35, 37, 44 AND 45.
Dec 7, 2016A00026$0CVN 73 RCOH ADVANCE PLANNING, AUTHORIZATION TO PROCURE FUKUSHIMA REMEDIATION RELATED MATERIAL WITHIN THE E&S POOL.
Dec 6, 2016A00025$0CVN 73 RCOH ADVANCE PLANNING, AUTHORIZATION OF E&S POOL FMR 61.00, FMR 67.00&FMR 68.00
Dec 5, 2016P00024$33.7MTHE PURPOSE OF THIS MODIFICATION IS TO 1) INCREASE THE LEVEL OF EFFORT OF ITEM 0006 BY 215,838 HOURS AND THE TOTAL COST BY $24,443,709 ($22,744,171 COST AND $1,699,538 FIXED FEE); 2) ESTABLISH CVN 74 PRE-ADVANCE PLANNING WORK ON ITEM 0019 WITH 97,216 HOURS AND TOTAL COST OF $10,822,888 ($10,069,245 COST AND $753,643 FIXED FEE); 3) INCREASE THE SECTION B NOTE C, EMERGENT AND SUPPLEMENTAL WORK, MATERIAL COST BY FROM $15,000,000 BY $5,000,000 TO $20,000,000 AND FIXED FEE FROM $1,125,000 BY $375,000 TO $1,500,00; 4) TRANSFER A TOTAL COST OF $377,037 ($350,732 COST AND 26,305 FIXED FEE) OF SUBCONTRACT EFFORT FROM ITEM 0015 TO 0006; AND 5) UPDATE APPLICABLE CONTRACT TERMS AND CONDITIONS.
Nov 9, 2016A00024$0CVN 73 RCOH ADVANCE PLANNING, ADJUDICATION OF E&S POOL MRC PROPOSALS 36&40.
Nov 3, 2016A00023$0CVN 73 RCOH ADVANCE PLANNING, ADJUDICATION OF E&S POOL MRC PROPOSALS 18, 23A, 30, 31,&33 AND FMRS 9-29&35.
Oct 28, 2016A00022$0CVN 73 RCOH ADVANCE PLANNING, AUTHORIZATION OF E&S POOL MRC 116&MRC 117.
Oct 13, 2016A00020$0CVN 73 RCOH ADVANCE PLANNING, E&S POOL MRC #82 AUTHORIZATION.
Oct 13, 2016A00021$0CVN 73 RCOH ADVANCE PLANNING, E&S POOL, ADJUDICATION OF MRC PROPOSALS 26, 27, 28 AND FMRS 7.00, 8.00 AND 34.00.
Oct 5, 2016A00018$1.1MCVN 73 RCOH ADVANCE PLANNING, CLIN 0018 ESTABLISHED/FUNDED FOR HUNTINGTON HALL OFF-SHIP BERTHING AND MESSING REQUIREMENTS.
Oct 5, 2016A00019$0CVN 73RCOH ADVANCE PLANNING, E&S POOL MRC #80, #92 AND #99 AUTHORIZATION.
Sep 29, 2016A00017$0CVN 73 RCOH ADVANCE PLANNING, E&S POOL FMR 52.00
Sep 28, 2016A00016$3.3MCVN 73 RCOH ADVANCE PLANNING, ESTABLISH CLIN 0017 FOR FUKUSHIMA RELATED REMEDIATION.
Sep 22, 2016P00023$0FY15 RCOH ADVANCE PLANNING
Aug 30, 2016A00015$0CVN 73 RCOH ADVANCE PLANNING, ADJUDICATION OF E&S MRC PROPOSALS 21, 22&23.
Aug 20, 2016A00013$0CVN 73 RCOH ADVANCE PLANNING, E&S POOL FMR 35.00
Aug 20, 2016A00014$0CVN 73 RCOH ADVANCE PLANNING, E&S POOL MRC ITEM #56
Aug 15, 2016A00007$0CVN 73 RCOH ADVANCE PLANNING, E&S POOL FMR 14.00&FMR 15.00
Aug 15, 2016A00008$0CVN 73 RCOH ADVANCE PLANNING, E&S POOL FMR 16.00, FMR 17.00&FMR 18.00
Aug 15, 2016A00009$0CVN 73 RCOH ADVANCE PLANNING, E&S POOL FMR 19.00, FMR 20.00, FMR 21.00&FMR 22.00
Aug 15, 2016A00010$0CVN 73 RCOH ADVANCE PLANNING, E&S POOL FMR 23.00, FMR 24.00, FMR 25.00&FMR 26.00
Aug 15, 2016A00011$0CVN 73 RCOH ADVANCE PLANNING, E&S POOL FMR 27.00, FMR 28.00&FMR 29.00
Aug 15, 2016A00012$0CVN 73 RCOH ADVANCE PLANNING, E&S POOL FMR 34.00
Aug 6, 2016A00005$0CVN 73 RCOH ADVANCE PLANNING, E&S POOL FMRS 9.00 - 12.00
Aug 6, 2016A00006$0CVN 73 RCOH ADVANCE PLANNING, E&S POOL FMR 13.00
Jul 25, 2016A00004$0CVN 73 RCOH ADVANCE PLANNING, E&S POOL MRC 41A, 56, 58&59
Jul 22, 2016P00022$221.3MESTABLISH THE REQUIREMENT FOR FUKUSHIMA REMEDIATION OF CVN 73 DURING THE RCOH ADVANCE PLANNING AND EXTEND THE PERIOD OF PERFORMANCE FOR CLIN 0006 THROUGH 04 AUGUST 2017 TO COINCIDE WITH THE START OF THE CVN 73 RCOH EXECUTION.
Jul 19, 2016A00002$0CVN 73 RCOH ADVANCE PLANNING, E&S POOL FMR 7.00
Jul 19, 2016A00003$0CVN 73 RCOH ADVANCE PLANNING, E&S POOL FMR 8.00
Jun 23, 2016P00021$0ESTABLISH NEW MATERIAL REQUIREMENTS IN SUPPORT OF CVN 73 RCOH ADVANCE PLANNING EFFORT.
Jun 1, 2016P00020$17.0MESTABLISH NEW MATERIAL REQUIREMENT AND ESTABLISH MATERIAL POOL FOR EMERGENT AND SUPPLEMENTAL MATERIAL REQUIREMENTS.
May 23, 2016A00001$0TRANSFER OF GOVERNMENT PROPERTY TO THE CVN 73.
Apr 19, 2016P00019$3.3MPY1 INCENTIVE FEE EARNED
Apr 18, 2016P00018$0MATERIAL PROPOSAL #10
Feb 26, 2016P00017$185.3MTHE PURPOSE OF THIS MODIFICATION IS TO 1) UNDER SECTION B, INCREASE THE TOTAL COST OF LINE ITEM 0006 BY $198,151,883 ($184,402,666 COST AND $13,749,217 FIXED FEE) AND THE TOTAL HOURS BY 1,726,132; 2) INCREASE THE TOTAL COST OF LINE ITEM 0010 BY $193,351,254 ($179,924,059 COST AND $13,427,195 FIXED FEE) AND THE TOTAL HOURS BY 34,053; 3) INCREASE THE TOTAL COST OF LINE ITEM 0015 BY $2,359,369 ($2,194,762 COST AND $164,607 FIXED FEE); 4) UPDATE THE B-9, B-10, AND B-11 INCENTIVES ACCORDINGLY; 5) UNDER SECTION F, AMEND LINE ITEM 0006 END DATE; 6) UNDER SECTION G, INCREMENTALLY FUND LINE ITEM 0006XX IN THE AMOUNT OF $139,937,515 ($130,174,433 COST AND $9,763,082 FIXED FEE) AND LINE ITEM 0015XX IN THE AMOUNT OF $12,299,313 ($11,441,222 COST AND $858,091 FIXED FEE); 7) UNDER SECTION H, UPDATE 5252.232-9104 AND 5252.216-9122 ACCORDINGLY; 8) UNDER SECTION I, UPDATE 52.222-2 ACCORDINGLY; AND 9) UNDER SECTION J, UPDATE THE EXHIBITS A, B, C, AND D, ATTACHMENT B AND ATTACHMENT K ACCORDINGLY.
Feb 4, 2016P00016$11.7MEXERCISE PLANNING YEAR 2 AND INCENTIVES; ESTABLISH MAN-HOURS, PRICING, AND PROVIDE FUNDING FOR BRIDGING RCOH PLANNING SERVICES; EXTEND CLIN 0014 PERIOD OF PERFORMANCE; UPDATE ATTACHMENT K AND DISTRIBUTION LIST FOR CONTRACT DATA REQUIREMENTS LIST.
Jan 20, 2016P00015$0THE PURPOSE OF THIS MODIFICATION IS TO 1) UNDER SECTION B, TRANSFER CEILING AND FUNDING FROM LINE ITEM 0001 IN THE AMOUNT OF $17,631 ($16,401 IN COST, $1,230 IN FIXED FEE) ASSOCIATED WITH PY1 FREIGHT TO LINE ITEM 0015; 2) INCREASE THE TOTAL COST OF LINE ITEM 0015 BY $1,809,693 ($1,683,435 IN COST, $126,258 IN FIXED FEE) INCLUDING THE ABOVE CEILING TRANSFER; 3) UPDATE THE B-9, B-10, AND B-11 INCENTIVES ACCORDINGLY (LINE ITEMS 0002, 0003, 0004, AND 0011); 4) UNDER SECTION C, REVISE LINE ITEM 0015 SOW TO INCLUDE DELIVERY OF MATERIAL; 5) UNDER SECTION G, DECREASE SUB LINE ITEM 000102 FUNDING (ACRN AB) BY $17,631 AND INCREMENTALLY FUND SUB LINE ITEM 001502 IN THE AMOUNT OF $17,631; AND 6) UNDER SECTION H, UPDATE THE ALLOTMENT OF FUNDS CLAUSE ACCORDINGLY.
Nov 23, 2015P00014$0INCREASE CLIN 0015 FOR ADDITIONAL MATERIAL REQUIREMENTS (MATERIAL PROPOSAL #5 - HARD SIDED CONTAINMENTS AND CLAMPS)
Oct 28, 2015P00013$20.3MINCREAS PY1 LOE BY 161,500 MHS AND CLIN 0015 MATERIAL REQUIREMENTS
Oct 2, 2015P00012$0CVN 73 RCOH ADVANCE PLANNING MATERIAL (TG ROTORS)
Sep 28, 2015P00011$0THE PURPOSE OF THIS MODFIICATION IS TO 1) UNDER SECTION B, INCREASE LINE ITEM 0001 COST BY $8,969 AND FIXED FEE BY $673; 2) UPDATE INCENTIVES B-9, B-10, AND B-11 ACCORDINGLY; AND 3) UNDER SECTION J, UPDATE ATTACHMENT B - EXCEPTIONS AND CLARIFICATIONS.
Jul 31, 2015P00010$280.0KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ITEM 473 (LSTR CUSTOM CUTTING SYSTEM - NNPN 17899878) UNDER ATTACHMENT K; INCREASE THE CONTRACT COST AND TOTAL FUNDED AMOUNT BY $280,006; AND UPDATE CLAUSES B-9, B-10, AND B-11 ASSOCIATED WITH THIS MODIFICATION.
May 6, 2015P00009$160.1MCOST REDUCTION INITIATIVES, FUNDING, AND ADMIN CHANGES
Feb 23, 2015P00008$0ADMIN CHANGE TO REFLECT THE APPROPRIATE CONTRACT VALUE.
Feb 4, 2015P00007$57.5MPLANNING YEAR 1 OF CVN 73 RCOH ADVANCE PLANNING AND CVN 73 RCOH MATERIAL
Jan 28, 2015P00006$0REVISE SECTION B CLIN 0001 AND TABLE B-1 MAN HOURS TO ACCOUNT FOR INCREASED MATERIAL COSTS FOR FY2015 SHIP CHECKS.
Dec 17, 2014P00005$0UPDATE SOW TO INCLUDE SHIPCHECK EFFORTTS
Dec 5, 2014P00004$0MAN-HOUR TO MATERIAL EXCHANGE TO SUPPORT THE CVN 73 SHIP CHECKS
Nov 12, 2014P00003$0REVISE SECTION B CLIN 0001 AND TABLE B-1 MAN HOURS TO ACCOUNT FOR INCREASED MATERIAL COSTS FOR FY2015 SHIP CHECKS.
Oct 16, 2014P00002$0UPDATE STATEMENT OF WORK TO INCLUDE SOFT START ITEMS.
Sep 25, 2014P00001$0SHIP CHECK PREPARATION AND COST REDUCTION INITIATIVES
Aug 1, 20140$49.6MPY1 RCOH DEFUELING ADVANCE PLANNING

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.