Federal contract award
N0002415C2114
DETAIL DESIGN AND CONSTRUCTION CVN 79
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | SUP OF SHIPBUILDING CONV AND REPAIR |
| NAICS | 336611 — Ship Building and Repairing |
| PSC | 1905 — Combat Ships and Landing Vessels |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIXED PRICE INCENTIVE |
| Obligations | $4.6B |
| Current contract value | $4.6B |
| Potential contract value / ceiling | $4.6B |
| Start date | Jun 5, 2015 |
| Current end date | Jul 31, 2025 |
| Potential end date | Jul 31, 2025 |
| Latest award activity | Jun 3, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 200 of 916 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 12, 2026 | A00625 | $2.0M | THE PURPOSE OF THIS MODIFICATION IS TO AWARD OBRP ISNSL 7-7.3 AGAINST THE DETAIL DESIGN AND CONSTRUCTION CVN 79 CONTRACT. |
| Jun 3, 2026 | A00624 | $3.3M | ISSUE FMR 1080 REV 2 FOR UPDATED OBRP S&E REQUIREMENTS AGAINST THE DETAIL DESIGN AND CONSTRUCTION CVN 79 CONTRACT. |
| May 27, 2026 | AZ0109 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE FMR 1051.02 AGAINST THE DETAIL DESIGN AND CONSTRUCTION CVN 79 CONTRACT. |
| May 22, 2026 | A00623 | $3.1K | ISSUE FMR 1079 REV 3 FOR UPDATED OBRP Q-COSAL REQUIREMENTS AGAINST THE DETAIL DESIGN AND CONSTRUCTION CVN 79 CONTRACT. |
| May 19, 2026 | A00622 | $0 | THIS MODIFICATION IS TO ISSUE HMR 1502.01 FOR FATHOMETER CABLE UPGRADES IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| May 15, 2026 | AZ0108 | $-20.1K | THIS MODIFICATION IS TO DEFINITIZE FMR 1084.00 PREVIOUS AUTHORIZED UNDER A00590 IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| May 8, 2026 | P00183 | $22.0M | FUND CLIN 6800 |
| Apr 30, 2026 | A00621 | $45.7K | THIS MODIFICATION IS TO AWARD THE CLOSEOUT OF THE 11 SERIES CAT 1 IRS IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Apr 30, 2026 | P00182 | $2.8M | UPDATE SOW AND INCREMENTALLY FUND |
| Apr 20, 2026 | A00620 | $104.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 AWARD HUNTINGTON HALL 676.17 FOR 23 MAR 2026 THROUGH 29 MAY 2026. |
| Apr 16, 2026 | A00619 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN UNPRICED CHANGE ORDER FOR HMR 1078.01 AGAINST THE DETAIL DESIGN AND CONSTRUCTION CVN 79 CONTRACT. |
| Apr 15, 2026 | AZ0107 | $-75.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND - DEFINITIZE HMR 1514.02, VOYAGE MANAGEMENT SYSTEM (VMS)SOFTWARE UPGRADE. |
| Apr 10, 2026 | AZ0106 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE FMR 1086.00 AGAINST THE DETAIL DESIGN AND CONSTRUCTION CVN 79 CONTRACT. |
| Apr 8, 2026 | A00618 | $-1.7M | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND - LOST, DAMAGED & DESTROYED BATCH 20 DE-OBLIGATION. |
| Apr 8, 2026 | P00181 | $6.7M | CVN 79 CLIN 0003 0020 0072 AND 0073 FUNDING |
| Apr 3, 2026 | A00616 | $1.9M | THE PURPOSE OF THIS MODIFICATION IS TO AWARD ON-BOARD REPAIR PARTS (OBRP) ISNSL 6-6.3 FOR CVN 79 DETAIL DESIGN AND CONSTRUCTION. |
| Apr 3, 2026 | A00617 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND - HMR 1119.11, ELECTROMAGNETIC AIRCRAFT LAUNCH SYSTEM (EMALS) LUBRICATING OIL (ELO) SYSTEM. |
| Apr 1, 2026 | P00179 | $0 | CVN 79 FY26 WAGE INVESTMENTS |
| Apr 1, 2026 | P00180 | $2.2M | CVN 79 FY26 WAGE INVESTMENTS (OBLIGATION) |
| Mar 31, 2026 | A00615 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN UNPRICED CHANGE ORDER FOR HMR 1084.05 AGAINST THE DETAIL DESIGN AND CONSTRUCTION CVN 79 CONTRACT. |
| Mar 23, 2026 | A00614 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND - HMR 1228 ADMINISTRATIVE MODIFICATION |
| Mar 16, 2026 | A00613 | $716.6K | AWARD ON BOARD REPAIR PARTS INCREMENTAL STOCK NUMBER SEQUENCE LIST 4.6 AGAINST THE CVN 79 DD&C CONTRACT. |
| Mar 6, 2026 | A00612 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND GPA-25- 069, MATERIAL TRANSFER OF GOVERNMENT PROPERTY FROM CVN 78 TO CVN 79. |
| Feb 25, 2026 | P00178 | $1.0M | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Feb 23, 2026 | AZ0105 | $-3.1K | THIS MODIFICATION IS TO DEFINITIZE FMR 1016.08 FOR BERTHING TRAILERS IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Feb 17, 2026 | A00611 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND, HMR 1084.04 - ENGRAVING SHOP EQUIPMENT. |
| Feb 17, 2026 | AZ0104 | $-15.9K | DEFINITIZE FMR 1051.01 FOR EVENING SECURITY PATROL ON THE DD&C CONTRACT. |
| Jan 30, 2026 | A00610 | $1.7M | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND - LOST, DAMAGED & DESTROYED BATCH 20. |
| Jan 28, 2026 | P00177 | $12.0M | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Jan 26, 2026 | A00609 | $66.0K | THIS MODIFICATION IS TO AWARD THE CLOSEOUT OF THE 10 SERIES CAT 1 IRS IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Jan 21, 2026 | P00176 | $2.5M | DETAIL DESIGN AND CONSTRUCTION CVN 79 FUNDING RDTE AND INCENTIVE UPDATE |
| Dec 19, 2025 | P00175 | $11.0M | FUNDING ACTION |
| Dec 17, 2025 | P00174 | $769.4K | CLIN 0003 (SCN) AND 0020 (RDT&E) FUNDING |
| Dec 9, 2025 | A00608 | $0 | THIS MODIFICATION IS TO AWARD AN OFF CYCLE PERIODIC RELEASE MODIFICATION TO CLEAR THE OPEN LIABILITIES CLOSED BY THE NEGOTIATIONS UNDER PZ0003 IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Dec 8, 2025 | A00607 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND GPA-25-044, MATERIAL TRANSFER OF GOVERNMENT PROPERTY FROM CVN 79 TO CVN 80. |
| Nov 26, 2025 | A00606 | $1.3M | THIS MODIFICATION IS TO AWARD FMR 1082 FOR OBRP IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Nov 21, 2025 | A00605 | $100.0K | ISSUE FMR 1079 REV 2 FOR UPDATED OBRP Q-COSAL REQUIREMENTS AGAINST THE DETAIL DESIGN AND CONSTRUCTION CVN 79 CONTRACT. |
| Nov 19, 2025 | PZ0003 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Nov 17, 2025 | A00604 | $0 | THIS MODIFICATION IS FOR SCHEDULE A UPDATES IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Oct 29, 2025 | P00173 | $1.0M | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Oct 24, 2025 | A00603 | $182.5K | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND - CLOSEOUT OF 0036 SERIES SMALL VALUE CHANGES. |
| Oct 20, 2025 | A00601 | $60.9K | THIS MODIFICATION IS TO AWARD THE CAT 1 IR 09 SERIES IN ACCORDANCE WITH ATTACHMENT 11 IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Oct 20, 2025 | A00602 | $0 | THIS MODIFICATION IS TO ISSUE HMR 1111.01 FOR GROUND POWER UNITS IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Oct 15, 2025 | A00600 | $0 | THIS MODIFICATION IS TO ISSUE FMR 1051.02 FOR SECURITY SERVICES IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Oct 15, 2025 | P00172 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Oct 8, 2025 | A00599 | $1.9M | AWARD ON BOARD REPAIR PARTS (OBRP) 8.1 ON CVN 79 DD&C CONTRACT. |
| Oct 3, 2025 | A00598 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND HMR 1133 SPECIFICATION CHANGE ONLY (SCO) - PORTABLE AFFF EXTINGUISHERS |
| Oct 2, 2025 | A00597 | $0 | THIS MODIFICATION IS TO ISSUE FMR 1086 FOR EMALS UPGRADES IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Oct 2, 2025 | P00171 | $0 | UPDATE TO AAG WORKFORCE SPECIAL INCENTIVE |
| Sep 30, 2025 | AZ0103 | $-848 | THIS MODIFICATION IS TO DEFINITIZE FMR 1072.02 FOR TRANSPORTATION BETWEEN NET CENTER AND BLDG 608 IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Sep 29, 2025 | A00596 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND GPA-24-059, ANNUAL MATERIAL TRANSFER TO FACILITIES USE CONTRACT |
| Sep 25, 2025 | P00170 | $4.9M | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Sep 24, 2025 | A00595 | $0 | ISSUE REV 1 TO ON BOARD REPAIR PARTS STEAM & ELECTRIC FMR 1080. |
| Sep 23, 2025 | A00594 | $560.6K | DETAIL DESIGN AND CONSTRUCTION CVN 79 AWARD HUNTINGTON HALL 676.16 FOR 22 SEP 2025 THROUGH 22 MAR 2026. |
| Sep 16, 2025 | P00169 | $619.9K | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Sep 11, 2025 | A00593 | $266.4K | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND - CLOSEOUT OF 0035 SERIES SMALL VALUE CHANGES. |
| Sep 9, 2025 | A00592 | $0 | AWARD HMR 1130 SPEC CHANGE ONLY FOR TV REQUIREMENTS. |
| Sep 8, 2025 | A00591 | $0 | COST TO COMPLETE YEAR END COMMITMENT UPDATES FOR THE CVN 79 DD&C CONTRACT. |
| Sep 3, 2025 | A00590 | $40.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 ISSUANCE OF FMR 1084 AIRCRAFT ARRESTING GEAR POWER CONTROL SYSTEM. |
| Sep 3, 2025 | P00168 | $-107.4K | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Aug 25, 2025 | A00589 | $75.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND HMR 1514.02 - UPGRADE OF VOYAGE MANAGEMENT SYSTEM (VMS) SOFTWARE. |
| Aug 8, 2025 | A00588 | $4.3M | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Aug 7, 2025 | AZ0102 | $-927 | THIS MODIFICATION IS TO DEFINITIZE FMR 1072.01 FOR TRANSPORTATION BETWEEN NET CENTER AND BLDG 608 IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Jul 30, 2025 | A00584 | $15.9K | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND FMR 1051.01 - EVENING SECURITY PATROL EXTENSION 30 JUNE 2026 |
| Jul 30, 2025 | A00585 | $3.1K | THIS MODIFICATION IS TO ISSUE FMR 1016.08 FOR BERTHING TRAILERS IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Jul 30, 2025 | A00586 | $3.6K | ISSUE FMR 1079 REV 1 FOR UPDATED OBRP Q-COSAL REQUIREMENTS AGAINST THE DETAIL DESIGN AND CONSTRUCTION CVN 79 CONTRACT. |
| Jul 30, 2025 | A00587 | $21.0K | THIS MODIFICATION IS TO ISSUE FMR 1083 TO INSTALL CONDUIT SHIELDING FOR THE I-STALKER SYSTEM IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Jul 25, 2025 | A00583 | $5.1K | ISSUE CHANGE FOR CREW TRANSPORTATION SERVICES AGAINST CVN 79 DETAIL DESIGN AND CONSTRUCTION CONTRACT. |
| Jul 24, 2025 | A00582 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND - HMR 1226 ADMINISTRATIVE MODIFICATION |
| Jul 21, 2025 | A00581 | $438.3K | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND - CLOSEOUT OF 0034 SERIES SMALL VALUE CHANGES. |
| Jul 16, 2025 | A00580 | $126.9K | THIS MODIFICATION IS TO AWARD THE RECONCILIATION MODIFICATION FOR THE 08 SERIES OF CAT 1 IRS IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Jul 10, 2025 | A00579 | $1.5K | ISSUE FMR 1072.01 FOR TRANSPORTATION BETWEEN NET CENTER AND BLDG 608 ON THE DETAIL DESIGN AND CONSTRUCTION CVN 79 CONTRACT. |
| Jul 9, 2025 | P00167 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Jul 1, 2025 | P00166 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Jun 30, 2025 | AZ0101 | $3.5K | THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE FMR 1016.07 FOR BERTHING TRAILERS. |
| Jun 24, 2025 | A00578 | $30.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 ISSUANCE OF FMR 1081 - EMALS L3&4 FORCE SPIKE |
| Jun 18, 2025 | A00577 | $0 | AWARD HMR 1129 SCO FOR DTMB DRAWING APPLICABILITY FOR FORD CLASS SHIP TRIALS. |
| Jun 16, 2025 | P00165 | $132.6K | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Jun 13, 2025 | A00576 | $656.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 AWARD OF LOST, DAMAGED AND DESTROYED BATCH 19 MODIFICATION. |
| Jun 3, 2025 | A00575 | $125.0K | THE PURPOSE OF THIS MOD IS TO ISSUE HMR 1132 ON CVN 79 FOR DRADIS. |
| May 30, 2025 | A00573 | $320.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND HMR 1084.03 - UPDATED GOVERNMENT FURNISHED INFORMATION (GFI) FOR PRINT SHOP AND PHOTO LAB EQUIPMENT AND MODIFICATION OF REQUIREMENTS FOR SELECT EQUIPMENT FROM CABLES AND FOUNDATIONS. |
| May 30, 2025 | A00574 | $50.0K | THIS MODIFICATION IS TO ISSUE HMR 1131.00 FOR AWE HMIS IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| May 29, 2025 | A00571 | $0 | THIS MODIFICATION IS TO AWARD THE PERIODIC RELEASE MODIFICATION FOR THE PERIOD OF JANUARY 2024 THROUGH JUNE 2024 IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| May 29, 2025 | A00572 | $0 | THIS MODIFICATION IS TO AWARD HMR 1225 IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| May 22, 2025 | A00567 | $30.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND HMR 1127.01 REV 1 - REPLACEMENT OF EXITING CONTRACTOR FURNISHED SAFES AND SECURE FILING CABINETS WITH COMPLIANT GOVERNMENT FURNISHED SECURE FILING CABINETS. |
| May 22, 2025 | A00568 | $1.2K | THIS MODIFICATION IS TO ISSUE FMR 1016.07 FOR BERTHING TRAILERS IN SUPPORT OF CVN 79 NEW CONSTRUCTION |
| May 22, 2025 | A00569 | $2.0M | THIS MODIFICATION IS TO ISSUE HMR 1511.01 FOR UPDATES TO THE CANES VIDEO WALL IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| May 22, 2025 | A00570 | $7.0K | THE PURPOSE OF THIS MODIFICATION IS TO ISSUE FMR 1078 FOR FIRE EXTINGUISHER DELIVERY. |
| May 21, 2025 | A00566 | $695.6K | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND HMR 1127.01 REV 1, REPLACEMENT OF EXITING CONTRACTOR FURNISHED SAFES AND SECURE FILING CABINETS WITH COMPLIANT GOVERNMENT FURNISHED SECURE FILING CABINETS. |
| May 20, 2025 | P00164 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| May 15, 2025 | A00562 | $170.0K | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE PRC DECKING. |
| May 15, 2025 | A00563 | $90.0K | THIS MODIFICATION IS TO ISSUE HMR 1112.01 FOR THE FUEL AT SEA BLOCK IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| May 15, 2025 | A00564 | $1.4M | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND HMR 1542 - GOVERNMENT FURNISHED INFORMATION (GFI) FOR THE MODIFIED CABLES AND FOUNDATIONS INSTALLATION OF COLLABORATIVE BRIEFING SYSTEM (CBS) FOR THE CVN 79 READY ROOM. |
| May 15, 2025 | P00163 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| May 14, 2025 | A00560 | $263.2K | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND - CLOSEOUT OF 0033 SERIES SMALL VALUE CHANGES. |
| May 14, 2025 | A00561 | $9.8K | THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN UNPRICED CHANGE ORDER TO REPAIR DAMAGED BREAKERS. |
| May 6, 2025 | A00559 | $42.5K | THIS MODIFICATION IS TO ISSUE FMR 1077 TO REPLACE THE CBSP RADIO FREQUENCY CABLE IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| May 6, 2025 | AZ0100 | $-120.4K | DETAIL DESIGN AND CONSTRUCTION CVN 79 FMR 1072 MOD TO DEFINITIZE FMR 1072 FOR CVN 79 CREW BUS SERVICES. |
| Apr 30, 2025 | P00162 | $16.1M | SPECIAL INCENTIVE FOR WAGES - CR ANOMALY |
| Apr 28, 2025 | AZ0099 | $-21.2K | DETAIL DESIGN AND CONSTRUCTION CVN 79 DEFINITIZATION OF FMR 1051 REV 2 (SECURITY DETAIL EXTENSION) |
| Apr 22, 2025 | AZ0098 | $-59.2K | CVN 79 BERTHING TRAILER EXTENSION (FMR 1016.06) |
| Apr 17, 2025 | A00557 | $71.0K | THIS MODIFICATION IS TO AWARD THE CAT 1 IR 07 SERIES IN SUPPORT OF CVN 79 NEW CONSTRUCTION |
| Apr 17, 2025 | A00558 | $1.2M | DETAIL DESIGN AND CONSTRUCTION CVN 79 ISSUE FMR 1079 FOR OBRP Q-COSAL SPARE MATERIALS |
| Apr 15, 2025 | A00555 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79 AWARD HMR 1224 ADMINISTRATIVE CHANGE. |
| Apr 15, 2025 | AZ0097 | $-64.6K | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND FMR 1048.01 - WIFI FOR ONBOARD DINING TRAILERS |
| Apr 10, 2025 | AZ0096 | $-213.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 DEFINITIZE FMR 1048 FOR DINING AREA OPTIONS |
| Apr 9, 2025 | P00161 | $493.6K | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Apr 4, 2025 | A00554 | $284.3K | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND - CLOSEOUT OF 0032 SERIES SMALL VALUE CHANGES. |
| Mar 26, 2025 | A00552 | $27.5K | DETAIL DESIGN AND CONSTRUCTION CVN 79 ISSUE FMR 1076 FOR AAG WATER TWISTER SHIP-OUT FOR REPAIRS |
| Mar 26, 2025 | A00553 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND REPLACEMENT OF ADVANCED ARRESTING GEAR (AAG) WATER TWISTERS (WT) MOD I UNITS WITH MOD II UNITS WITH THE ADDITION OF SUPPLEMENTAL THERMAL VOLUME COMPENSATORS (TVC). |
| Mar 21, 2025 | A00551 | $573.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 AWARD HH 676.15 FOR 3/24/25 THRU 9/21/25 |
| Mar 19, 2025 | A00549 | $25.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 ISSUE FMR 1074 FOR AIMD RUBBER MATTING |
| Mar 19, 2025 | A00550 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79 ISSUE UCO FOR FMR 1068 REV 3 VENDING MACHINES AND COOLERS |
| Mar 13, 2025 | A00548 | $5.5K | DETAIL DESIGN AND CONSTRUCTION CVN 79 ISSUANCE OF FMR 7058 BREAKER REPAIR. |
| Mar 3, 2025 | A00547 | $464.7K | DETAIL DESIGN AND CONSTRUCTION CVN 79. AWARD ON BOARD REPAIR PARTS (OBRP) 18.2 |
| Feb 28, 2025 | AZ0095 | $27.1K | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND FMR 1071 - MATERIAL AND REPAIRS TO THE PORT SECURITY BARRIER (PSB) IAW PSB MEMO 3-56A |
| Feb 25, 2025 | A00546 | $28.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 MOD ISSUED FOR FMR 1073 PSB MEMO 3-68 |
| Feb 20, 2025 | A00545 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79 ISSUE FMR 1068 REV 2 FOR SHIP'S VENDING AND STORE COOLERS PERMANENT INSTALLATION |
| Feb 18, 2025 | A00544 | $576.4K | DETAIL DESIGN AND CONSTRUCTION CVN 79 AWARD LDD BATCH 18 |
| Feb 13, 2025 | A00542 | $75.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND HMR 1055.12 - SD STOREROOM NAE REPAIR PARTS LADDER INSTALLATION. |
| Feb 13, 2025 | A00543 | $125.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 ISSUE FMR 1072 FOR CVN 79 TRANSPORTATION BETWEEN NETCENTER AND B608 |
| Feb 11, 2025 | A00541 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND GPA-24-046, MATERIAL TRANSFER OF GOVERNMENT PROPERTY FROM CVN 74 TO CVN 79 |
| Feb 6, 2025 | A00540 | $50.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 ISSUE HMR 1037 FOR ARMORY DOORS |
| Feb 4, 2025 | P00158 | $1.9M | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Jan 28, 2025 | A00538 | $81.2K | THIS MODIFICATION IS TO CLOSEOUT THE CAT 1 IR 06 SERIES IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Jan 28, 2025 | A00539 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79 ISSUE HMR 1518.04 REV 1 |
| Jan 28, 2025 | P00157 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Jan 23, 2025 | A00537 | $498.2K | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND - CLOSEOUT OF 0031 SERIES SMALL VALUE CHANGES. |
| Jan 17, 2025 | A00536 | $2.5M | THIS MODIFICATION IS FOR CHANGES TO THE REQUIREMENTS OF THE ADVANCED ARRESTING GEAR (AAG) WATER TWISTERS IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Jan 15, 2025 | P00156 | $6.6M | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Jan 14, 2025 | A00535 | $28.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 ISSUE FMR 1071 FOR PSB REPAIRS |
| Dec 30, 2024 | A00534 | $190.0K | THIS MODIFICATION IS TO UPDATE GFI IN REGARDS TO THE TACTICAL VARIANT SWITCH (TVS) IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Dec 20, 2024 | A00533 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND PERIODIC RELEASE MODIFICATION JULY - DECEMBER 2023 |
| Dec 19, 2024 | AZ0094 | $180.6K | DETAIL DESIGN AND CONSTRUCTION CVN 79 DEFINITIZE FIELD MODIFICATION REQUEST 1016.05 FOR BERTHING TRAILER EXTENSION |
| Dec 19, 2024 | P00155 | $8.0M | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Dec 18, 2024 | A00532 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND HMR 1125 SPECIFICATION CHANGE ONLY (SCO) - PIPING PENETRATIONS IN THE SIDE PROTECTIVE SYSTEM |
| Dec 16, 2024 | P00154 | $54.0M | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Dec 12, 2024 | A00531 | $65.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 ISSUE HMR 1541 FOR PAPA WATCH STATION |
| Dec 10, 2024 | A00530 | $5.0K | THIS MODIFICATION IS TO ISSUE FMR 1068 REV 1 FOR UPDATES TO THE VENDING MACHINE INSTILLATION REQUIREMENTS IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Dec 3, 2024 | A00529 | $171.5K | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND - FMR 1062, BUILDERS RISK - 90100 CRANE LIFT INCIDENT. |
| Nov 26, 2024 | A00528 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79 AWARD HMR 1223 FOR SKED A CHANGES |
| Nov 22, 2024 | A00527 | $31.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 ISSUE FMR 1070 FOR EMALS PSB BOW SWAP |
| Nov 21, 2024 | A00526 | $125.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 ISSUE FMR 1068 |
| Nov 20, 2024 | P00153 | $100.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Nov 12, 2024 | A00525 | $278.8K | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND - CLOSEOUT OF 0030 SERIES SMALL VALUE CHANGES. |
| Nov 7, 2024 | A00524 | $210.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND - HMR 1540, THEATER MISSION PLANNING CENTER (TMPC)REPLACING THE TOMAHAWK COMMAND AND CONTROL SYSTEM (TC2S) |
| Nov 6, 2024 | A00522 | $807.7K | DETAIL DESIGN AND CONSTRUCTION CVN 79 AWARD LDD BATCH 17 |
| Nov 6, 2024 | A00523 | $0 | ISSUE FMR 1066 REV 1 TO ADD/UPDATE ADDITIONAL CABLES FOR REPAIR IN SUPPORT OF CVN 79 NEW CONSTRUCTION |
| Oct 30, 2024 | P00152 | $179.2K | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Oct 25, 2024 | A00519 | $20.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 CHANGE ORDER FOR FMR 1051.00 REV 2 |
| Oct 25, 2024 | A00520 | $5.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 ISSUE FMR 1065 REV 1 FOR EMALS S20 LM CABLE REORIENTATION |
| Oct 25, 2024 | A00521 | $25.0K | THIS MODIFICATION IS TO ISSUE FMR 1066 FOR EMALS CABLE REPAIRS IN SUPPORT OF CVN 79 NEW CONSTRUCTION |
| Oct 23, 2024 | A00518 | $30.4K | THIS MODIFICATION IS TO AWARD THE 05 SERIES CAT 1 IRS FOR CVN 79 NEW CONSTRUCTION. |
| Oct 21, 2024 | P00151 | $6.3M | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Oct 17, 2024 | A00517 | $444.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 ISSUE HMR 1127 FOR SECURE FILING CABINETS PRIORITY 1 AND 2 ONLY |
| Oct 9, 2024 | P00150 | $337.5K | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Oct 3, 2024 | A00516 | $35.0K | THIS MODIFICATION IS FOR EMALS REPAIRS TO CAT 3 AND 4 IN ACCORDANCE WITH FMR 1065 TO SUPPORT CVN 79 NEW CONSTRUCTION. |
| Sep 30, 2024 | A00515 | $65.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 ISSUE FMR 1016.06 FOR BERTHING TRAILER EXTENSION. |
| Sep 30, 2024 | P00149 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Sep 26, 2024 | P00147 | $144.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Sep 26, 2024 | P00148 | $513 | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Sep 23, 2024 | P00146 | $2.7M | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Sep 12, 2024 | P00145 | $50.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Sep 5, 2024 | P00144 | $1.8M | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Sep 4, 2024 | P00143 | $25.6M | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Aug 28, 2024 | A00514 | $318.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND - CLOSEOUT OF 0029 SERIES SMALL VALUE CHANGES. |
| Aug 27, 2024 | A00513 | $764.1K | PROVIDE FUNDING FOR CVN 79 OFF-SHIP BERTHING AND MESSING FACILITY (HUNTINGTON HALL 676.14) |
| Aug 1, 2024 | A00512 | $300.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND, FMR 1055.11 - PROVIDE GOVERNMENT FURNISHED INFORMATION (GFI) FOR ELECTRONIC CONSOLIDATED AUTOMATED SUPPORT SYSTEM (ECASS)AND MODIFY INSTALLATION REQUIREMENTS FROM CABLES AND FOUNDATIONS TO FULL INSTALLATION. |
| Jul 30, 2024 | P00142 | $135.6K | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Jul 25, 2024 | A00511 | $30.4K | THIS MODIFICATION IS TO CLOSE OUT THE 04 SERIES OF CAT 1 IRS FOR CAN 79 NEW CONSTRUCTION. |
| Jul 19, 2024 | A00510 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND - MATERIAL TRANSFER GPA-34-034 (KSO TO CVN 79) TRANSFER OF GOVERNMENT PROPERTY FROM NAVAL NUCLEAR LABORATORY TO CVN 79. |
| Jul 19, 2024 | AZ0093 | $38.6K | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIP COMMAND - MATERIAL AND REPAIR OF PORT SECURITY BARRIER IAW PSB MEMO 3-56, FMR 1061 |
| Jul 16, 2024 | A00509 | $534.7K | DETAIL DESIGN AND CONSTRUCTION CVN 79, SUPSHIPNN COMMAND - CLOSEOUT OF 0028 SERIES SMALL VALUE CHANGES. |
| Jul 12, 2024 | A00508 | $12.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 ISSUE FMR 7055 |
| Jul 11, 2024 | A00507 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79 AWARD HMR 1126 SCO |
| Jul 10, 2024 | A00506 | $227.5K | PROVIDE UPDATED MOBILE CRANE SPECIFICATIONS AND INSTALL RECEPTACLES TO SUPPORT CVN 79 NEW CONSTRUCTION |
| Jul 2, 2024 | P00141 | $2.0M | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Jun 28, 2024 | A00505 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79 - FMR 1051 REV 1 UCO |
| Jun 11, 2024 | P00140 | $779.1K | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Jun 10, 2024 | P00139 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| May 30, 2024 | A00504 | $30.0K | PSB REPAIRS FMR 1061 |
| May 30, 2024 | P00138 | $136.1K | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| May 22, 2024 | A00503 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79 AWARD HMR 1222 |
| May 15, 2024 | A00501 | $45.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 - FMR 1059 (UCO) |
| May 15, 2024 | A00502 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79 - FMR 1058 REV 1 (UCO) |
| May 14, 2024 | A00498 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79 UPDATE ATTACHMENT 16 PER ISP DATED 03.13.2024 |
| May 14, 2024 | A00499 | $618.1K | DETAIL DESIGN AND CONSTRUCTION CVN 79 LDD BATCH 16 |
| May 14, 2024 | A00500 | $82.5K | DETAIL DESIGN AND CONSTRUCTION CVN 79 ISSUE FMR 1060 |
| May 10, 2024 | P00136 | $195.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| May 8, 2024 | A00497 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79 - MATERIAL TRANSFER GPA-24-015 |
| May 3, 2024 | A00496 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79 AWARD HMR 1124 SCO |
| Apr 30, 2024 | A00495 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79 AWARD PRM JAN. - JUN. 2023 |
| Apr 26, 2024 | A00493 | $60.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 ISSUING FMR 1058 |
| Apr 26, 2024 | A00494 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79 AWARD FMR 3115 |
| Apr 24, 2024 | A00492 | $2.4M | DETAIL DESIGN AND CONSTRUCTION CVN 79 ISSUE HMR 1111 |
| Apr 22, 2024 | A00491 | $509.7K | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Apr 17, 2024 | A00489 | $0 | DETAIL DESIGN AND CONSTRUCTION CVN 79 AWARD HMR 1221 |
| Apr 17, 2024 | A00490 | $60.9K | DETAIL DESIGN AND CONSTRUCTION CVN 79 CAT 1 IR SERIES 03 CLOSEOUT AWARD |
| Apr 10, 2024 | P00135 | $1.6M | DETAIL DESIGN AND CONSTRUCTION CVN 79 |
| Apr 5, 2024 | A00488 | $75.0K | DETAIL DESIGN AND CONSTRUCTION CVN 79 HMR 1110.01 ISSUANCE |