Federal contract award
N0002415C4301
USS COLUMBUS (SSN 762) EOH PLANNING
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | SUP OF SHIPBUILDING CONV AND REPAIR |
| NAICS | 336611 — Ship Building and Repairing |
| PSC | 1905 — Combat Ships and Landing Vessels |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $1.6B |
| Current contract value | $1.6B |
| Potential contract value / ceiling | $1.6B |
| Start date | Aug 14, 2015 |
| Current end date | Dec 20, 2026 |
| Potential end date | Dec 20, 2026 |
| Latest award activity | Jun 12, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 200 of 240 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 12, 2026 | A00213 | $41.4K | INCREASE FUNDING IN SUPPORT OF THE AUTHORIZATION OF WORK AUTHORIZATION REQUEST 0005.19 IN SUPPORT OF HUNTINGTON HALL PERIOD 30 MAY 2026 THROUGH 20 SEPTEMBER 2026 FOR THE USS COLUMBUS ENGINEERING OVERHAUL |
| May 22, 2026 | A00212 | $174.0K | THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE CEILING AND FUNDING ON CLIN 0040 IN SUPPORT OF AUTHORIZATION OF FIELD MODIFICATION REQUESTS 0054.00 AND 0056.00. THIS MODIFICATION ALSO INCREASE THE FUNDING AND MAN-HOURS ON CLIN 0044. |
| May 8, 2026 | A00211 | $248.1K | THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE CEILING AND FUNDING ON CLIN 0040 IN SUPPORT OF AUTHORIZATION OF FIELD MODIFICATION REQUESTS 0047.00, 0051.00, AND 0052.00. |
| Apr 7, 2026 | P00025 | $45.0M | USS COLUMBUS EOH COMPLETION (O&MN) |
| Mar 26, 2026 | A00210 | $19.5K | INCREASE FUNDING IN SUPPORT OF THE AUTHORIZATION OF WORK AUTHORIZATION REQUEST 0005.18 IN SUPPORT OF HUNTINGTON HALL PERIOD 23 MARCH 2026 THROUGH 29 MAY 2026 FOR THE USS COLUMBUS ENGINEERING OVERHAUL. |
| Mar 20, 2026 | A00209 | $830.5K | THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE CEILING AND FUNDING ON CLIN 0040 IN SUPPORT OF AUTHORIZATION OF FIELD MODIFICATION REQUEST 0037.00. THIS MODIFICATION ALSO UPDATES SECTION J TO MODIFY CONTRACT DATA REQUIREMENTS LIST (CDRL) A046. |
| Jan 29, 2026 | A00208 | $187.2K | THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE CEILING AND FUNDING ON CLIN 0040 IN SUPPORT OF AUTHORIZATION OF FIELD MODIFICATION REQUEST 0048.00 AND FIELD MODIFICATION REQUEST 0038.00. THIS MODIFICATION ALSO AUTHORIZES FIELD MODIFICATION REQUEST 0040.00 AS A NO COST CHANGE AGREED TO BY BOTH PARTIES. |
| Dec 19, 2025 | A00207 | $108.8K | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE AND FUND OPTION CLIN 0044 UNDER USS. COLUMBUS ENGINEERED OVERHAUL AVAILABILITY. THIS MODIFICATION ALSO UPDATES THE EXTENDED DESCRIPTION FOR CLIN 0043 AND CLIN 0044. |
| Dec 15, 2025 | A00206 | $400.1K | AUTHORIZATION OF FIELD MODIFICATION REQUEST 0045.00 UNDER USS COLUMBUS (SSN 762) ENGINEERED OVERHAUL AVAILABILITY |
| Nov 21, 2025 | P00024 | $74.0M | USS COLUMBUS EOH COMPLETION (O&MN) |
| Oct 30, 2025 | A00205 | $0 | USS COLUMBUS ENGINEERING OVERHAUL COMPLETION (OPERATION & MAINTENANCE NAVY)TO UPDATE THE DESCRIPTION AND EXTENDED DESCRIPTION FOR SLIN 0041DA AND ITEM 0041DA SOW UNDER SECTION C TO INCLUDE BATTERY REMOVAL AND INSTALLATION |
| Sep 30, 2025 | P00023 | $10.4M | USS COLUMBUS EOH COMPLETION (O&MN) |
| Sep 26, 2025 | A00204 | $97.0K | AUTHORIZATION OF FIELD MODIFICATION REQUEST 0043.00 UNDER USS COLUMBUS (SSN 762) ENGINEERED OVERHAUL AVAILABILITY |
| Sep 22, 2025 | A00203 | $155.0K | INCREASE FUNDING IN SUPPORT OF THE AUTHORIZATION OF WORK AUTHORIZATION REQUEST 0005.17 IN SUPPORT OF HUNTINGTON HALL PERIOD 22 SEPTEMBER 2025 THROUGH 22 MARCH 2026 FOR THE USS COLUMBUS ENGINEERING OVERHAUL. |
| Aug 18, 2025 | A00202 | $31.4K | USS COLUMBUS ENGINEERING OVERHAUL COMPLETION (EOH) INCREASE CEILING AND FUNDING TO AUTHORIZE FIELD MODIFICATION REQUEST (FMR) 0035.00 UNDER CLIN 0040 AND AUTHORIZE FIELD MODIFICATION REQUEST 0039.00, 0041.00, AND 0042.00 |
| Jun 23, 2025 | A00201 | $10.6K | THIS MODIFICATION REALIGNS HOURS FROM SLIN 0041AA TO NEWLY ESTABLISHED SLIN 0041EA FOR MODIFICATION TO SHIPALT SSN-4702K WITH THE AUTHORIZATION OF FIELD MODIFICATION REQUEST 0034.00 (SERIAL CHANGE 258) . THIS MODIFICATION ALSO AUTHORIZES FIELD MODIFICATION REQUEST 0036.00 (SERIAL CHANGE 260) UNDER CLIN 0040. |
| Jun 12, 2025 | P00022 | $49.6M | USS COLUMBUS EOH COMPLETION |
| Jun 5, 2025 | A00200 | $20.7K | INCREASE CEILING AND FUNDING ON CONTRACT LINE ITEM NUMBER 0040 TO AUTHORIZE SSN 762 FIELD MODIFICATION REQUEST 0032.00-0033.00 AND UPDATE FEDERAL ACQUISITION REGULATION CLAUSE 52.222-2 PAYMENT FOR OVERTIME PREMIUMS (JUL 1990) |
| Apr 24, 2025 | P00021 | $0 | USS COLUMBUS EOH |
| Mar 25, 2025 | A00199 | $0 | USS COLUMBUS (SSN 762) ENGINEERING OVERHAUL UPDATE SECTION F TO ALIGN WITH HH POP 24 MAR 2025 - 21 SEP 2025 AND TO UPDATE THE DISPOSITION INSTRUCTIONS OF THE GOVT. PROPERTY AUTHORIZED IN USS COLUMBUS (SSN 762) MODIFICATION A00169. |
| Mar 14, 2025 | A00198 | $163.2K | USS COLUMBUS (SSN 762) ENGINEERING OVERHAUL AUTHORIZE WARS 0005.16 FOR BERTHING AT HUNTINGTON HALL FROM 24 MARCH 2025 THROUGH 21 SEPTEMBER 2025 |
| Feb 21, 2025 | A00197 | $29.3K | INCREASE CEILING AND FUNDING ON CLIN 0040 TO SUPPORT THE AUTHORIZATION OF FMR 4301-31 (SC 256 - FORCED COOLING REPAIRS) ON CONTRACT N00024-15-C-4301 USS COLUMBUS (SSN 762). |
| Feb 6, 2025 | A00196 | $0 | TO UPDATE SECTION F DELIVERY DATE FOR CLIN 0011 AND PROVIDE SECTION F DELIVERY DATES FOR CLINS 0009, 0010, 0016, AND 0019, DUE TO THE CONTRACT MILESTONES TABLE BEING REMOVED ON THE RESTRUCTURE MODIFICATION FOR ENGINEERING OVERHAUL AVAILABILITY USS COLUMBUS, (SSN 762). |
| Feb 3, 2025 | A00195 | $0 | UPDATE SECTION C REGARDING CONEX BOX LANGUAGE ON CONTRACT FOR ENGINEERED OVERHAUL AVAILABILITY, USS COLUMBUS (SSN 762). |
| Jan 27, 2025 | A00194 | $8.0K | INCREASE CEILING AND FUNDING ON CLIN 0040 TO AUTHORIZE SSN 762 FMR 4301-30 |
| Dec 10, 2024 | A00193 | $217.6K | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE AND FUND THE OPTION FOR SCOPING AND ESTIMATING NEW WORK UNDER CLIN 0043 FOR THE USS COLUMBUS (SSN 762) EOH. |
| Oct 29, 2024 | A00192 | $0 | USS COLUMBUS (SSN 762) EOH UPDATE SECTION J, ATTACHMENT 4 TO CLARIFY ITEM NUMBER (20) FOR CLARIFICATION TO ITEM NUMBER (16)REGARDING TEST BOUNDARY VALVES. |
| Sep 27, 2024 | A00191 | $6.3K | USS COLUMBUS (SSN 762) EOH AUTHORIZE FMR 4301-29 (CANNIBILIZATION OF RADAR MAST), AND UPDATE SECTION F DELIVERY DATE FOR CLIN 0042, 0043, AND 0044 |
| Sep 20, 2024 | A00190 | $225.6K | USS COLUMBUS (SSN 762) EOH AUTHORIZE FMR 4301-28 (CORRECTION OF CSMP ITEM EE01 4665), WARS 0005.15 (BERTHING AT HH 9/23/24 - 3/23/25), AND UPDATE CLAUSE 5252.232-9104 ALLOTMENT OF FUNDS |
| Sep 9, 2024 | A00189 | $42.7K | USS COLUMBUS (SSN 762) EOH AUTHORIZE AND INCREASE FUNDING FOR FMR 4301-26 (CORRECT DEFICIENCIES WITH P6152H) AND FMR 4301-27 (PERFORM TESTING TO RESTORE PIPING) ON CLIN 0040. |
| Aug 23, 2024 | A00188 | $214.8K | MODIFICATION IS TO ESTABLISH SLIN 0041DA FOR AIT SERVICES IN SUPPORT OF SHIPALTS 4508K AND 4823D AND UPDATE LANGUAGE FOR CLIN 0041 ON USS COLUMBUS (SSN 762) EOH |
| Aug 15, 2024 | A00187 | $9.0K | AUTHORIZE FMR 4301-25 (SC 250) TO PERFORM COMPLETION TEST OF BATTERY COMPARTMENT AND VALVES FOR THE USS COLUMBUS (SSN 762) EOH |
| Aug 13, 2024 | P00020 | $115.0M | USS COLUMBUS ENGINEERED OVERHAUL |
| Jul 15, 2024 | P00019 | $8.0M | USS COLUMBUS (SSN 762) ENGINEERED OVERHAUL (EOH) |
| Apr 24, 2024 | A00186 | $-8.0M | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDS FROM CLIN 10 DUE TO A COST UNDER-RUN. |
| Mar 22, 2024 | A00185 | $202.7K | PROVIDE OFF SHIP BERTHING FOR THE USS COLUMBUS (SSN 762) CREW AT HUNTINGTON HALL IN NEWPORT NEWS, VA. |
| Mar 18, 2024 | A00184 | $630.2K | THE REASON FOR THIS MODIF ICATION IS TO ESTABLISH SLIN 0041BA FOR ORDALT 18000, 0041CA FOR SHIPALT 4365KP, 0041CB FOR SHIPALT 4762KP AND INCREASE FUNDING FOR COST OVERRUN ON CLIN 0007AB AND CLIN 0014 |
| Feb 5, 2024 | A00183 | $0 | NO COST ADMIN CHANGE FOR SERIAL CHANGE 249.0 |
| Jan 12, 2024 | A00182 | $0 | LMA, PRODUCTION, AND GROWTH WORK |
| Dec 21, 2023 | P00018 | $168.9M | LMA, PRODUCTION, AND GROWTH WORK |
| Nov 8, 2023 | A00181 | $0 | USS COLUMBUS EOH - CLIN 0009 AUTHORIZE RETENTION RELEASE |
| Sep 27, 2023 | A00180 | $280.3K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Aug 14, 2023 | A00179 | $-181.4K | USS COLUMBUS NEW WORK |
| Jun 16, 2023 | A00178 | $0 | LMA, PRODUCTION, AND GROWTH WORK |
| Apr 24, 2023 | P00017 | $115.0M | USS COLUMBUS EOH LMA, PRODUCTION, AND GROWTH WORK |
| Apr 10, 2023 | P00016 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Mar 30, 2023 | A00177 | $169.2K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Feb 17, 2023 | A00176 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Dec 7, 2022 | P00015 | $-102.8K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Sep 27, 2022 | A00175 | $174.2K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Sep 22, 2022 | P00014 | $1.1M | USS COLUMBUS (SSN 762) HEAT AND SMOKE DETECTION AND NOTIFICATION (HASDAN) |
| Aug 11, 2022 | A00174 | $-101.1K | DE-OBLIGATE CANCELLING FUNDS AND REDUCE PRICE |
| Jun 29, 2022 | A00173 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| May 12, 2022 | A00172 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| May 3, 2022 | A00171 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Apr 6, 2022 | A00170 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Apr 4, 2022 | A00169 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION DISPOSITION OF GFP |
| Mar 28, 2022 | A00168 | $390.9K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Mar 22, 2022 | A00167 | $142.2K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Mar 18, 2022 | A00166 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Feb 22, 2022 | A00165 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Feb 16, 2022 | A00164 | $188.9M | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Feb 2, 2022 | A00163 | $135.0K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Jan 31, 2022 | A00162 | $73.1K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Jan 27, 2022 | A00161 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Dec 9, 2021 | A00160 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Dec 1, 2021 | A00159 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Sep 29, 2021 | A00158 | $91.2K | USS COLUMBUS (SSN 762) EOH EXECUTION HUNTINGTON HALL AND ALLOTMENT OF FUNDS CORRECTION |
| Aug 19, 2021 | A00157 | $0 | USS COLUMBUS (SSN 762) ALLOTMENT OF FUNDS |
| Aug 5, 2021 | P00013 | $0 | SECTION J ATTACHMENT 119 UPDATE |
| Jul 23, 2021 | A00156 | $0 | USS COLUMBUS (SSN 762) PRICING TABLE CORRECTION |
| Jun 29, 2021 | A00155 | $-260.9K | USS COLUMBUS (SSN 762) EOH EXECUTION DECREASE EXCESS FUNDS |
| Jun 16, 2021 | P00012 | $0 | ADMIN ACTION UPDATING PCO |
| Jun 2, 2021 | P00011 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| May 24, 2021 | A00154 | $135.2K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Apr 23, 2021 | A00153 | $0 | USS COLUMBUS (SSN 762) EOH NEW WORK |
| Apr 7, 2021 | A00152 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Mar 24, 2021 | P00010 | $191.0M | USS COLUMBUS (SSN 762) EOH RESTRUCTURING SETTLEMENT EXECUTION |
| Feb 23, 2021 | A00151 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Feb 19, 2021 | A00150 | $0 | USS COLUMBUS (SSN 762) EOH GFE TRANSFER AND NEW WORK |
| Jan 21, 2021 | A00149 | $0 | USS COLUMBUS (SSN 762) EOH |
| Dec 2, 2020 | A00148 | $0 | USS COLUMBUS (SSN 762) EOH NEW WORK |
| Nov 6, 2020 | A00147 | $0 | AUTHORIZE SERIAL CHANGE 209.0 - UPDATE MS |
| Oct 7, 2020 | A00146 | $0 | CORRECT PRICING TABLE |
| Sep 25, 2020 | A00145 | $6.5M | USS COLUMBUS (SSN 762) EOH EXECUTION NEW WORK CLIN EXTENSION |
| Sep 15, 2020 | AB2001 | $0 | USS COLUMBUS (SSN 762) 52.204-25 |
| Sep 9, 2020 | A00144 | $0 | USS COLUMBUS (SSN 762) EOH NEW WORK |
| Aug 28, 2020 | A00143 | $0 | USS COLUMBUS (SSN 762) EOH NEW WORK |
| Aug 24, 2020 | A00142 | $154.1K | USS COLUMBUS (SSN 762) HUNTINGTON HALL |
| Jun 29, 2020 | A00141 | $0 | USS COLUMBUS (SSN 762) NEW WORK |
| Jun 25, 2020 | A00140 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| May 28, 2020 | A00139 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| May 21, 2020 | A00138 | $0 | USS COLUMBUS (SSN 762) EOH NEW WORK |
| May 15, 2020 | A00137 | $1.8K | USS COLUMBUS (SSN 762) EOH EXECUTION HUNTINGTON HALL |
| May 8, 2020 | A00136 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION NEW WORK |
| Apr 20, 2020 | A00135 | $0 | USS COLUMBUS (SSN 762) EOH NEW WORK |
| Apr 17, 2020 | A00134 | $0 | USS COLUMBUS (SSN 762) EOH NEW WORK |
| Apr 15, 2020 | A00133 | $199.7K | USS COLUMBUS (SSN 762) EOH HUNTINGTON HALL |
| Apr 6, 2020 | A00132 | $0 | USS COLUMBUS (SSN 762) EOH NEW WORK |
| Mar 24, 2020 | A00131 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Mar 16, 2020 | A00130 | $0 | USS COLUMBUS (SSN 762) EOH NEW WORK |
| Mar 11, 2020 | A00129 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION NEW WORK |
| Jan 28, 2020 | A00128 | $0 | USS COLUMBUS (SSN 762) EOH NEW WORK |
| Dec 20, 2019 | A00127 | $0 | USS COLUMBUS (SSN 762) EOH NEW WORK |
| Dec 17, 2019 | A00126 | $0 | USS COLUMBUS (SSN 762) EOH NEW WORK |
| Nov 20, 2019 | A00125 | $136.0M | USS COLUMBUS (SSN 762) EOH EXECUTION SERVICES |
| Nov 18, 2019 | A00124 | $0 | USS COLUMBUS (SSN 762) EOH NEW WORK |
| Oct 31, 2019 | A00123 | $0 | USS COLUMBUS (SSN 762) EOH SMS NEW WORK |
| Oct 29, 2019 | A00122 | $0 | USS COLUMBUS (SSN 762) EOH |
| Oct 28, 2019 | A00121 | $0 | USS COLUMBUS (SSN 762) EOH SMS |
| Oct 24, 2019 | A00120 | $0 | USS COLUMBUS (SSN 762) EOH SMS NEW WORK |
| Oct 16, 2019 | A00119 | $22.9K | USS COLUMBUS (SSN 762) EOH SMS AIT SUPPORT |
| Oct 9, 2019 | A00118 | $0 | USS COLUMBUS (SSN 762) EOH |
| Sep 27, 2019 | A00116 | $0 | USS COLUMBUS (SSN 762) EOH NEW WORK |
| Sep 27, 2019 | A00117 | $67.0M | USS COLUMBUS (SSN 762) EOH GROWTH AND NEW WORK |
| Sep 25, 2019 | A00115 | $20.0M | USS COLUMBUS (SSN 762) EOH EXECUTION GROWTH AND NEW WORK |
| Sep 24, 2019 | A00114 | $99.7K | USS COLUMBUS (SSN 762) EOH EXECUTION NEW WORK |
| Sep 23, 2019 | A00113 | $20.0M | USS COLUMBUS (SSN 762) EOH EXECUTION GROWTH AND NEW WORK |
| Sep 19, 2019 | A00111 | $-2.0M | USS COLUMBUS (SSN 762) EOH "NEW WORK" |
| Sep 19, 2019 | A00112 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION NEW WORK |
| Sep 17, 2019 | A00110 | $19.7K | USS COLUMBUS (SSN 762) EOH EXECUTION SERVICES |
| Sep 13, 2019 | A00109 | $2.3M | USS COLUMBUS (SSN 762) EOH GROWTH AND NEW WORK |
| Sep 12, 2019 | A00108 | $0 | USS COLUMBUS (SSN 762) EOH NEW WORK |
| Sep 11, 2019 | A00107 | $12.2K | USS COLUMBUS (SSN 762) EOH NEW WORK |
| Sep 3, 2019 | A00106 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Aug 29, 2019 | A00105 | $0 | USS COLUMBUS (SSN 762) EOH NEW WORK |
| Aug 28, 2019 | A00104 | $999.7K | USS COLUMBUS (SSN 762) EOH NEW WORK |
| Aug 27, 2019 | A00103 | $-6.1M | USS COLUMBUS (SSN 762) EOH PLANNING: DEOBLIGATE EXCESS FUNDING AND DECREASE SLIN PRICE |
| Aug 12, 2019 | A00102 | $7.6M | USS COLUMBUS (SSN 762) EOH EXECUTION GROWTH AND NEW WORK INCREASE |
| Aug 8, 2019 | A00101 | $26.4K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Jul 31, 2019 | A00100 | $34.4K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Jul 19, 2019 | A00099 | $2.0M | USS COLUMBUS (SSN 762) EOH EXECUTION FUNDING FOR CLIN 0015 |
| Jul 17, 2019 | A00097 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Jul 17, 2019 | A00098 | $0 | USS COLUMBUS (SSN 762) EOH ADMINISTRATIVE CORRECTION |
| Jul 5, 2019 | A00096 | $4.0M | USS COLUMBUS (SSN 762) EOH GROWTH WORK |
| Jun 28, 2019 | A00094 | $2.0M | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Jun 28, 2019 | A00095 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Jun 14, 2019 | A00093 | $0 | USS COLUMBUS (SSN 762) EOH GROWTH WORK |
| Jun 6, 2019 | A00092 | $23.8K | USS COLUMBUS (SSN 762) EOH AIT SUPPORT |
| May 22, 2019 | A00091 | $0 | USS COLUMBUS (SSN 762) EOH NEW WORK |
| May 17, 2019 | A00090 | $80.1K | USS COLUMBUS (SSN 762) NEW WORK |
| May 7, 2019 | A00089 | $-7.5M | USS COLUMBUS (SSN 762) EOH NEW WORK REALIGNMENT |
| Apr 19, 2019 | A00088 | $0 | USS COLUMBUS (SSN 762) EOH NEW WORK |
| Apr 15, 2019 | A00087 | $0 | USS COLUMBUS (SSN 762) UPDATE FAR CLAUSES |
| Apr 11, 2019 | A00086 | $6.8K | USS COLUMBUS (SSN 762) EOH NEW WORK AND AIT SUPPORT |
| Apr 5, 2019 | A00085 | $18.9M | USS COLUMBUS (SSN 762) EOH GROWTH WORK |
| Mar 21, 2019 | A00084 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Feb 28, 2019 | A00083 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Feb 8, 2019 | A00082 | $0 | USS COLUMBUS (SSN 762) EOH NEW WORK |
| Feb 5, 2019 | A00081 | $1.1M | USS COLUMBUS (SSN 762) EOH NEW WORK AND FUNDING |
| Jan 31, 2019 | A00080 | $198.8K | USS COLUMBUS (SSN 762) AIT FUNDING |
| Jan 23, 2019 | A00079 | $0 | USS COLUMBUS (SSN 762) EOH NEW WORK |
| Dec 20, 2018 | A00078 | $37.8K | USS COLUMBUS (SSN 762) EXECUTION AND NEW WORK EFFORT |
| Dec 12, 2018 | A00077 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Nov 15, 2018 | A00076 | $0 | USS COLUMBUS (SSN 762) EOH; SONAR |
| Nov 9, 2018 | A00075 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Nov 7, 2018 | A00074 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Nov 6, 2018 | A00073 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Oct 29, 2018 | A00072 | $27.0K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Oct 12, 2018 | A00071 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Oct 9, 2018 | A00070 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Sep 28, 2018 | A00069 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Sep 27, 2018 | A00068 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Sep 26, 2018 | A00067 | $89.2K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Sep 20, 2018 | A00066 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Sep 20, 2018 | P00009 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Sep 11, 2018 | A00065 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Aug 29, 2018 | A00064 | $8.5M | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Aug 17, 2018 | A00063 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Aug 16, 2018 | A00062 | $1.3M | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Aug 8, 2018 | A00061 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Jul 12, 2018 | A00060 | $13.6K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Jul 11, 2018 | A00059 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Jul 5, 2018 | A00058 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Jun 29, 2018 | A00057 | $90.1K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Jun 26, 2018 | A00056 | $-95.5K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Jun 14, 2018 | A00055 | $48.8K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Jun 7, 2018 | P00008 | $-4.8M | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Jun 1, 2018 | A00054 | $72.2K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| May 17, 2018 | A00053 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| May 15, 2018 | A00052 | $22.1K | USS COLUMBUS (SSN 762) EOH AIT SUPPORT |
| Apr 19, 2018 | A00051 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Apr 10, 2018 | A00050 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Apr 9, 2018 | A00049 | $5.3K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Mar 29, 2018 | A00048 | $100.7K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Mar 20, 2018 | A00047 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Mar 2, 2018 | A00046 | $4.5M | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Feb 28, 2018 | A00045 | $57.0K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Feb 26, 2018 | A00044 | $233.7K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Feb 16, 2018 | A00043 | $30.9K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Feb 13, 2018 | A00042 | $6.3M | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Jan 29, 2018 | A00041 | $434.2K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Jan 3, 2018 | A00040 | $2.5M | USS COLUMBUS (SSN 762) EOH AUTHORIZATION&FUNDING OF NEW WORK |
| Dec 26, 2017 | A00039 | $0 | USS COLUMBUS (SSN 762) EOH CLIN REALIGNMENT |
| Dec 8, 2017 | A00038 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Dec 7, 2017 | P00007 | $0 | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Dec 6, 2017 | A00037 | $93.5K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Dec 1, 2017 | A00036 | $392.6K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Nov 21, 2017 | A00034 | $81.4K | USS COLUMBUS (SSN 762) EOH EXECUTION |
| Nov 21, 2017 | A00035 | $12.8M | USS COLUMBUS (SSN 762) EOH EXECUTION |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
80/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 80/100. Available recorded signals: 75 points.
- Contract end 2026-12-20 (56 days from calculation)
- +35 points
- 39 historical awards in this buyer and category group
- +15 points
- 240 recorded award transactions
- +10 points
- Latest award action: 2026-06-12
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.