Federal contract award

N0002416C2116

CVN 80 ENGINEERING EFFORTS AND STEEL

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVSEA HQ
NAICS336611 — Ship Building and Repairing
PSC1905 — Combat Ships and Landing Vessels
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIXED PRICE INCENTIVE
Obligations$13.4B
Current contract value$19.9B
Potential contract value / ceiling$19.9B
Start dateMay 23, 2016
Current end dateJun 2, 2036
Potential end dateJun 2, 2036
Latest award activityJun 5, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 418 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 12, 2026A00227$2.2MCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION ISSUING UNPRICED CHANGE ORDERS HEADQUARTERS/FIELD MODIFICATION REQUESTS FMR 2006, HMR 2054, HMR 2067, HMR 2097, HMR 2098, HMR 2119.06, HMR 2120, HMR 1120.15, HMR 2531, HMR 2059.01, AND HMR 2102.
Jun 8, 2026A00226$1.2MCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION ISSUING UNPRICED CHANGE ORDERS HEADQUARTERS MODIFICATION REQUESTS 1525.01 REV 1, 2056.00, 2060.00, AND 2119.02.
Jun 5, 2026P00175$14.6MFUND SLINS
Jun 4, 2026A00225$2.7KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION AWARDING FIELD MODIFICATION REQUEST 8025 TO REFRESH DATA ENTRY/DISPLAY TERMINAL HARDWARE
May 28, 2026A00224$15.0KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2042.00. THE PURPOSE OF THIS CHANGE IS TO PROVIDE LAMINATED DAMAGE CONTROL SUBDIVISION PLATES TO DAMAGE CONTROL UNIT LOCKERS AT DELIVERY.
May 21, 2026A00223$2.4MCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION ISSUING UNPRICED CHANGE ORDERS HEADQUARTERS MODIFICATION REQUESTS 2033, 2044, 2502, AND 2530
May 20, 2026A00222$1.9MCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION ISSUING UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2119.03 TO INSTALL ACOUSTIC DAMPENING INSULATION AND TILES ADJACENT TO MOTOR GENERATOR
May 18, 2026A00221$2.5MCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION ISSUING UNPRICED CHANGE ORDERS HEADQUARTERS MODIFICATION REQUESTS 2119.04, 2068, 2069, 2121, 2504, AND 2514
May 8, 2026A00220$125.0KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2094.00 REV 2 UPDATING ATTACHMENT 10, SCHEDULE F OF THE CONTRACT
May 7, 2026P00173$22.0MCVN 78 CLASS SHORE BASED SPARES - MTG LETTER CONTRACT
May 7, 2026P00174$3.0MCLIN 0020 INCREMENTAL FUNDING
May 5, 2026A00218$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION PERIODIC RELEASE MODIFICATION FOR THE PERIOD OF 1 JAN 2025 TO 30 JUN 2025
May 5, 2026A00219$37.0KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION AWARDING FIELD MODIFICATION REQUEST 2008.00 TO REPLACE A LOST CONTROLLER
May 1, 2026A00217$315.0KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION UNPRICED CHANGE ORDERS HEADQUARTERS MODIFICATION REQUESTS 2100 & 2520.01 UPDATING GOVERNMENT FURNISHED INFORMATION FOR WIRE BRAIDING MACHINE AND CORRECTING POWER CALCULATIONS FOR RADAR RECEIVER TRANSMITTER
Apr 30, 2026A00216$1.2MCVN 80 81 DETAILED DESIGN & CONSTRUCTION UNPRICED CHANGE ORDERS HEADQUARTERS MODIFICATION REQUESTS 2040 & 1525.02 UPDATING REQUIREMENTS FOR HUMIDITY CONTROL IN STOREROOMS AND SECURITY FEATURES FOR WEAPONS DEPARTMENT WORK CENTERS
Apr 29, 2026A00214$1.5MCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION CONTRACT MODIFICATION FOR FIELD MODIFICATION REQUEST 2004.00 REVISION 1 PROCURING ADDITIONAL CONTRACTOR FURNISHED IT ASSETS FOR VIEWING INTEGRATED DIGITAL SYSTEM PRODUCTS IN THE INDUSTRIAL ENVIRONMENT
Apr 29, 2026A00215$2.4MCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2073.00 INSTALLING DECORATIVE SHEATHING IN FLAG CABINS & STATEROOMS, CAPTAIN'S CABIN, STUDY & STATEROOM, AND CHIEF OF STAFF STUDY & STATEROOM
Apr 22, 2026A00212$151.0KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2047.00 TO INCREASE PHARMACY STORAGE
Apr 22, 2026A00213$48.5KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 1078.01 TO PROVIDED INSTALLATION OF RAGSNAG RINGS IN THE VACUUM, COLLECTION, HOLDING, AND TRANSFER SYSTEM TO PREVENT SYSTEM CLOGGING
Apr 17, 2026A00211$9.6KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2510.00 IDENTIFYING GOVERNMENT FURNISHED EQUIPMENT REQUIRED TO INSTALL CLOSE-IN WEAPONS SYSTEM BLOCK 1B
Apr 16, 2026A00210$22.1KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2515.00 PROVIDING UPDATED GOVERNMENT FURNISHED INFORMATION TO SUPPORT THE INSTALLATION OF SONAR SOUNDING SET DURING CONSTRUCTION
Apr 15, 2026P00172$20.0MCVN 81 DETAILED DESIGN & CONSTRUCTION
Apr 14, 2026A00209$120.0KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2512.00 UPDATING GOVERNMENT FURNISHED INFORMATION FOR THE INSTALLATION OF DIGITAL HYBRID SPEED LOG
Apr 8, 2026P00171$0WORKFORCE INCENTIVE CLIN 2080 AND SHORE BASED SPARES T&CS
Apr 6, 2026A00208$2.5MCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION ISSUING UNPRICED CHANGE ORDERS FOR HEADQUARTERS MODIFICATION REQUESTS 2095.00, 1119.07, 2034.00, 2037.00, 2046.00, 2052.00 AND 2503.00
Apr 1, 2026A00207$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION GOVERNMENT PROPERTY TRANSFER FROM CVN 80/81 CONTRACT TO VCS BLOCK V CONTRACT
Apr 1, 2026P00170$149.5MCVN 80 AND 81 FY26 WAGE INVESTMENTS
Mar 30, 2026A00206$73.7KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION TO AWARD FIELD MODIFICATION REQUEST 2013 WHICH PROCURES THE VENDOR REPAIR OF DAMAGED FILTER/SEPARATOR
Mar 30, 2026P00169$671.9MCVN 81 INSTALLMENT FUNDING 0120 INSTALLMENT FUNDING 0020 INCREMENTAL FUNDING
Mar 25, 2026A00205$2.5MCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION ISSUING UNPRICED CHANGE ORDERS HEADQUARTERS MODIFICATION REQUESTS 2093, 2035, 2045, 2506, 2509, 2519, 1120.19, 1120.20, 2043, 2124, 2036, 2119.05, AND 2049
Mar 25, 2026P00168$0CDRL A009 UPDATE
Mar 24, 2026A00204$2.4KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION AWARDING FIELD MODIFICATION REQUEST 2005.01 TO SHIP OBSOLETE JET BLAST DEFLECTOR ACTIVE FRONT END DRIVES TO NAVY SUPPLY IN SUPPORT OF CVN 78 AND CVN 79
Mar 9, 2026A00203$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION REVISING BILLING PRICES FOR CALENDAR YEAR 2025, QUARTER 4
Mar 9, 2026AZ0017$603.9KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION DEFINITIZING FIELD MODIFICATION REQUEST 2007.00 FOR THE PROCUREMENT OF UPGRADED CVN INFORMATION TECHNOLOGY HARDWARE
Mar 4, 2026A00202$261.2KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION AWARDING FIELD MODIFICATION REQUESTS 2009, 2010, 2011, AND 2012 FOR LOST AND DAMAGED MATERIALS
Mar 2, 2026A00201$693.9KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION AWARDING AN EQUITABLE ADJUSTMENT FOR LOST, DAMAGED, DESTROYED, AND STOLEN GOVERNMENT PROPERTY BATCH 4
Feb 25, 2026P00167$1.9MCLIN 0020 RDTE FUNDING CLIN 0120 IDS BILLABLE FEE ADJUSTMENT AND FUNDING
Feb 20, 2026A00200$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION ISSUING UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2066.00 CHANGING CONTRACTOR FURNISHED SAFES AND SECURE FILING CABINETS TO GOVERNMENT FURNISHED EQUIPMENT
Feb 19, 2026A00198$124.8KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION CONTRACT MODIFICATION ISSUING UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2511.00 PROVIDING ADDITIONAL GUIDANCE FOR INSTALLATION OF TORPEDO COUNTERMEASURES SET
Feb 19, 2026A00199$36.5KCVN 80& 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION ISSUING UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2055.00 TO UPGRADE AVIATION INTERMEDIATE MAINTENANCE DEPARTMENT JETI FUEL CABINET
Feb 18, 2026A00197$160.0KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION ISSUING MODIFICATION FOR UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2094.00 REVISION 1 TO UPDATE SCHEDULE F FOR OFFICE SPACE, SOFTWARE REQUIREMENTS, PARKING MEDICAL SPACES & COMMUNICATION CENTER
Jan 23, 2026A00196$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION CONTRACT MODIFICATION TO REVISE BILLING PRICE FOR CALENDAR YEAR 2025 3RD QUARTER SUBMITTALS AND UPDATE THE WEIGHTING FACTORS FOR CVN 80 AND CVN 81 IN ATTACHMENT 15
Jan 8, 2026A00195$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION TO TRANSFER CUSTODY OF GOVERNMENT PROPERTY FROM THE CVN 80/81 CONTRACT TO THE FACILITIES USE CONTRACT
Dec 22, 2025A00194$275.0KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2084.00 REMOVES THE REQUIREMENT FOR MODIFIED BEARING STAVE SIZES AND ESTABLISHES THE CANT ANGLE OF THE MAIN STRUT
Dec 19, 2025A00193$32.6MCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2523.00 PROVIDING UPDATED GOVERNMENT FURNISHED INFORMATION FOR THE INSTALLATION OF CONSOLIDATED AFLOAT NETWORKS AND ENTERPRISE SERVICES NETWORK DROPS
Dec 18, 2025A00191$50.0KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2096.00 MODIFYING FORD CLASS SPECIFICATION TO ALLOW USE OF COMMERCIAL PRODUCTS FROM NAVY SHIPBOARD FIBER OPTICS RECOMMENDED COMPONENTS LIST
Dec 18, 2025A00192$100.0KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2120.02 TO IMPROVE ACCESSIBILITY AND VISIBILITY OF ADVANCED ARRESTING GEAR CABLE SHOCK ABSORBER ENCLOSURE
Dec 17, 2025A00190$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION ACCEPTANCE OF GOVERNMENT PROPERTY TRANSFER OF (4) DRILL LOCATION TEMPLATES FOR INFORMATION DISTRIBUTION CENTER EQUIPMENT RACKS FROM CVN 79
Dec 12, 2025P00166$11.5MCLIN 0020 AND 0120 FUNDING CLIN 2001 POP EXTENSION
Dec 8, 2025A00189$640.0KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2051.00 TO ADD AIR CONDITIONING TO THE HAZARDOUS MATERIALS COMPLEX
Nov 24, 2025P00164$700.5MCVN 80 INSTALLMENT FUNDING
Nov 19, 2025P00163$78.1MQOS CAPEX FUNDING
Nov 14, 2025A00188$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION PERIODIC RELEASE MODIFICATION FOR THE PERIOD OF JULY 1, 2024 TO DECEMBER 31, 2024
Nov 7, 2025A00187$145.5KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION ISSUING UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2520 UPGRADING SURFACE SEARCH RADAR TO NEXT GENERATION SURFACE SEARCH RADAR
Oct 14, 2025A00186$288.0KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION TO ISSUE UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2038.00 TO MAKE THE LITHIUM ION BATTERY SHOP JOINT STRIKE FIGHTER COMPATIBLE
Oct 8, 2025A00185$75.2KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION ISSUING UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2507.00 FOR DIGITAL INTEGRATED LAUNCH & RECOVERY TV SURVEILLANCE SYSTEM
Oct 7, 2025A00184$240.0KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION ISSUING UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2092.00 FOR ADVANCED WEAPONS ELEVATOR HUMAN MACHINERY INTERFACES
Oct 6, 2025A00183$85.0KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION ISSUING UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2088.00 FOR GYM EQUIPMENT
Oct 3, 2025A00182$390.0KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION TO ISSUE UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 1120.17 TO RELOCATE AND INSTALL ADVANCED ARRESTING GEAR TERMINAL IMPACT PADS
Oct 2, 2025A00181$187.5KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION ISSUING UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 1119.08 TO EXTEND OIL RETURN LINES IN LUBE OIL STOWAGE TANKS.
Oct 1, 2025A00180$446.4KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION ISSUING UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2508.00 TO UPDATE GOVERNMENT FURNISHED INFORMATION IN SUPPORT OF ANTI-SHIP MISSILE DEFENSE RADAR INSTALLATION
Sep 30, 2025A00179$99.8KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION CONTRACT MODIFICATION TO AWARD HEADQUARTERS MODIFICATION REQUEST 2202.00, UPDATING CONTRACT DATA REQUIREMENTS LIST A003
Sep 30, 2025P00162$4.3MCVN 81 DETAILED DESIGN & CONSTRUCTION
Sep 24, 2025P00161$294.1KCVN 81 DETAILED DESIGN & CONSTRUCTION
Sep 19, 2025A00178$275.0KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION ISSUING MODIFICATION FOR UNPRICED CHANGE ORDERS HEADQUARTERS MODIFICATION REQUESTS 1535.00 (TORPEDO COUNTERMEASURE UPGRADE) & 1121.00 (SCUTTLE IN OXYGEN GENERATOR ON MAIN DECK)
Sep 17, 2025A00177$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION CONTRACT MODIFICATION TO REVISE BILLING PRICE FOR CALENDAR YEAR 2025 QUARTER 2 AND UPDATE ATTACHMENT 15 WEIGHTING FACTORS
Sep 11, 2025A00176$566.1KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION CONTRACT MODIFICATION TO AWARD AN EQUITABLE ADJUSTMENT FOR LOST, DAMAGED, DESTROYED, AND STOLEN GOVERNMENT PROPERTY BATCH 3
Sep 5, 2025A00175$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION CONTRACT MODIFICATION TO AWARD HEADQUARTERS MODIFICATION REQUEST 1130.00 (SPECIFICATION CHANGE ONLY) TO CORRECT A CONTRACTUAL DEFECT IN FORD CLASS SHIP SPECIFICATION SECTION 434
Sep 4, 2025A00174$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION CONTRACT MODIFICATION TO AWARD HEADQUARTERS MODIFICATION REQUEST 2077.00 AND UPDATE SECTION C FOR TRANSITION FROM TECHNICAL DOCUMENT MANAGEMENT INFORMATION SYSTEM TO MODEL BASED PRODUCT SUPPORT
Aug 27, 2025A00173$357.5KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION UNPRICED CHANGE ORDER ISSUING MODIFICATION FOR HEADQUARTERS MODIFICATION REQUEST 2505 TO INSTALL CONSOLIDATED AFLOAT NETWORKS AND ENTERPRISE SERVICES HARDWARE 2.0
Aug 27, 2025P00160$21.1MCVN 81 DETAILED DESIGN & CONSTRUCTION
Aug 21, 2025P00159$54.5KCVN 81 DETAILED DESIGN & CONSTRUCTION
Aug 11, 2025A00172$96.0KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION CONTRACT MODIFICATION TO ISSUE UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2041.00 FOR HANGAR BAY & AIRCRAFT INTERMEDIATE MAINTENANCE DEPARTMENT LIGHTING IMPROVEMENT
Jul 31, 2025A00169$83.5KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION CONTRACT MODIFICATION TO ISSUE HEADQUARTERS MODIFICATION REQUEST 2082.00 (UNPRICED CHANGE ORDER) TO PROCURE PORTABLE FIRE EXTINGUISHERS
Jul 31, 2025A00170$147.5KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION CONTRACT MODIFICATION TO ISSUE UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2085.00 FOR EMERGENCY DIESEL GENERATOR CIRCUIT BREAKERS
Jul 31, 2025A00171$20.0KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION CONTRACT MODIFICATION TO ISSUE UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2087.00 TO RECONFIGURE ARMORY DOORS
Jul 29, 2025P00158$0EPA 2024 UPDATE AWE CENTER OF EXCELLENCE INCENTIVES EARNED
Jul 9, 2025A00168$2.3MCVN 80&81 DETAILED DESIGN & CONSTRUCTION MODIFICATION ISSUING UNPRICED CHANGE ORDERS HEADQUARTERS MODIFICATION REQUESTS 2076.00 (INSTALL REACTOR COMPARTMENT LIGHTING) & 2059.00 (REPLACE DISPOSAL SYSTEM WITH INCINERATOR) AND UPDATE SECTION J
Jun 25, 2025P00157$0INCREASE OVERTIME PREMIUM CEILING
Jun 18, 2025A00167$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION TO AWARD HEADQUARTERS MODIFICATION REQUEST 1129.00 SPECIFICATION CHANGE ONLY TO REMOVE LANGUAGE FROM SHIP SPECIFICATION SECTION 094
Jun 17, 2025A00166$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION TO REVISE BILLING PRICE FOR CALENDAR YEAR 2025, 1ST QUARTER AND UPDATE WEIGHTING FACTORS
Jun 16, 2025P00156$2.2MCVN 81 DETAILED DESIGN & CONSTRUCTION
Jun 13, 2025A00165$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION TO AWARD FIELD MODIFICATION REQUEST 1312.00 WHICH REVISES SCHEDULE A
Jun 10, 2025P00155$0QOS CAPEX UPDATE
May 15, 2025P00154$4.0MCVN 81 DETAILED DESIGN & CONSTRUCTION
May 1, 2025A00164$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION PERIODIC RELEASE MODIFICATION JANUARY 1, 2024 TO JUNE 30, 2024
Apr 30, 2025P00153$407.3MSPECIAL WAGE AND FACILITY INVESTMENTS - CR ANOMALY
Apr 17, 2025P00152$4.4MCVN 81 DETAILED DESIGN & CONSTRUCTION
Apr 16, 2025A00163$792.5KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION CONTRACT MODIFICATION TO ISSUE UNPRICED CHANGE ORDERS HEADQUARTERS MODIFICATION REQUESTS 2020.00 REVISION 1 AND 2079.00.
Apr 15, 2025A00162$1.1MCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION CONTRACT MODIFICATION TO AWARD AN EQUITABLE ADJUSTMENT FOR LOST, DAMAGED, DESTROYED, AND STOLEN GOVERNMENT PROPERTY - BATCH 2
Apr 3, 2025A00160$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION MODIFICATION TO MAKE AN ADMINISTRATIVE CHANGE TO PROPULSION PLANT SCHEDULE A IN ACCORDANCE WITH FIELD MODIFICATION REQUEST 1311.00
Apr 3, 2025A00161$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION CONTRACT MODIFICATION TO REVISE BILLING PRICE FOR CALENDAR YEAR 2024, 4TH QUARTER AND UPDATE WEIGHTING FACTORS
Mar 3, 2025A00159$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION CONTRACT MODIFICATION TO REVISE BILLING PRICE FOR CALENDAR YEAR 2024, 3RD QUARTER AND UPDATE WEIGHTING FACTORS
Feb 27, 2025A00158$33.5KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION CONTRACT MODIFICATION TO ISSUE UNPRICED CHANGE ORDER HEADQUARTERS MODIFICATION REQUEST 2081.00
Feb 5, 2025A00157$0CVN 80/81 DETAILED DESIGN & CONSTRUCTION - EXTEND BUILDER'S RISK COVERAGE TO NEWPORT NEWS SHIPBUILDING - CHARLESTON OPERATIONS.
Jan 29, 2025A00156$0CVN 80-81 DETAILED DESIGN & CONSTRUCTION HEADQUARTERS MODIFICATION REQUEST 2078.00 (SPEC CHANGE ONLY) STUD MATERIAL TESTING CHANGE.
Jan 23, 2025P00151$872.4KCVN 81 DETAILED DESIGN & CONSTRUCTION
Jan 15, 2025P00150$1.0BCVN 81 DETAILED DESIGN & CONSTRUCTION
Jan 3, 2025P00149$4.0MCVN 81 DETAILED DESIGN & CONSTRUCTION
Dec 19, 2024A00154$0CVN 80/81 DETAILED DESIGN & CONSTRUCTION ACCEPTANCE OF GOVERNMENT PROPERTY TRANSFER OF GRILLAGE PIN FIXTURES FROM CVN 79
Dec 19, 2024A00155$500.0KCVN 81 DETAILED DESIGN & CONSTRUCTION - FMR 2007.00 - CVN 81 IT UPGRADES.
Dec 19, 2024P00148$-9.2MCVN 81 DETAILED DESIGN & CONSTRUCTION
Dec 13, 2024A00152$0CVN 80/81 DETAILED DESIGN & CONSTRUCTION - AWARD HMR 1125.00 (SCO)
Dec 13, 2024A00153$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION CONTRACT MODIFICATION TO EXTEND BUILDER'S RISK INSURANCE COVERAGE TO STEEL AMERICA
Dec 4, 2024P00147$35.0MCVN 81 DETAILED DESIGN & CONSTRUCTION
Dec 2, 2024P00146$1.0MCVN 81 DETAILED DESIGN & CONSTRUCTION
Nov 18, 2024P00145$59.6MFUNDING ACTION
Nov 5, 2024P00144$5.5MCVN 81 DETAILED DESIGN & CONSTRUCTION
Oct 31, 2024P00143$436.0MCVN 81 DETAILED DESIGN & CONSTRUCTION
Oct 29, 2024A00151$0CVN 80/81 DETAILED DESIGN & CONSTRUCTION - AWARD HMR 2080 SPEC CHANGE
Oct 10, 2024A00150$0CVN 80-81 DETAILED DESIGN & CONSTRUCTION PERIODIC RELEASE JUL-DEC 2023
Oct 3, 2024P00142$4.2MCVN 81 DETAILED DESIGN & CONSTRUCTION
Oct 2, 2024A00149$0CVN 80/81 DETAILED DESIGN AND CONSTRUCTION - ADMINISTRATIVE CHANGE TO UPDATE GOVERNMENT FURNISHED INFORMATION FOR ADVANCED ARRESTING GEAR ENERGY ABSORBER SUBSYSTEM
Oct 1, 2024A00148$0CVN 80-81 DETAILED DESIGN & CONSTRUCTION GOVERNMENT PROPERTY TRANSFER FROM CVN 79.
Sep 30, 2024A00147$7.0MCVN 80&81 DETAIL DESIGN & CONSTRUCTION CONTRACT MODIFICATION TO AWARD AN EQUITABLE ADJUSTMENT FOR LOST, DAMAGED, DESTROYED, AND STOLEN GOVERNMENT PROPERTY - BATCH 1
Sep 23, 2024P00141$3.2MCVN 81 DETAILED DESIGN & CONSTRUCTION
Sep 18, 2024P00140$6.2MCVN 81 DETAILED DESIGN & CONSTRUCTION
Sep 17, 2024P00139$1.0MCVN 81 DETAILED DESIGN & CONSTRUCTION
Aug 28, 2024A00146$0CVN 80/81 DETAILED DESIGN & CONSTRUCTION SCHEDULE A CHANGE
Aug 15, 2024A00145$0CVN 80/81 DETAILED DESIGN & CONSTRUCTION, CALENDAR YEAR 2024, 2ND QUARTER REVISED BILLING PRICE
Aug 5, 2024A00144$160.0KCVN 80/81 DETAILED DESIGN & CONSTRUCTION - MODIFY HOSE REEL ACCESS ARRANGEMENTS
Jul 23, 2024P00138$1.3MCVN 81 DETAILED DESIGN & CONSTRUCTION
Jul 22, 2024A00143$0CVN 80-81 DETAILED DESIGN & CONSTRUCTION SCHEDULE A UPDATES
Jul 16, 2024A00142$450.0KCVN 80-81 DETAILED DESIGN & CONSTRUCTION - UPDATES TO GALLEY EQUIPMENT
Jul 11, 2024A00141$0CVN 80/81 DETAILED DESIGN & CONSTRUCTION - SPEC CHANGE FOR GASKETS & FASTENERS IN PIPING.
Jul 10, 2024A00140$1.5MCVN 80/81 DETAILED DESIGN & CONSTRUCTION CONTRACT CHANGE TO PROVIDE ENHANCED-VISUAL WORK INSTRUCTIONS FOR ADVANCED WEAPONS ELEVATORS
Jul 8, 2024A00139$195.0KCVN 80/81 DETAILED DESIGN & CONSTRUCTION MACHINERY - CONTROL & MONITORING SYSTEM SOFTWARE BASELINE UPDATE
Jul 1, 2024P00137$815.5KCVN 81 DETAILED DESIGN & CONSTRUCTION
Jun 26, 2024A00137$0CVN 80/81 DETAILED DESIGN & CONSTRUCTION CY2024Q1 REVISED BILLING PRICE
Jun 26, 2024A00138$60.0KCVN 80/81 DETAILED DESIGN & CONSTRUCTION HMR 1117.00
Jun 25, 2024P00136$889.6KCVN 81 DETAILED DESIGN & CONSTRUCTION
Jun 4, 2024P00135$4.1MCVN 81 DETAILED DESIGN & CONSTRUCTION
May 22, 2024P00134$678.3KSHORE BASED SPARES - EDG LUCS 2 GENERATOR REFURB
May 16, 2024A00135$0CVN 80/81 HMR 2500.01 SKED A CLEANUP
May 16, 2024A00136$0CVN 81 DETAILED DESIGN & CONSTRUCTION CONTRACT CHANGE
May 14, 2024P00133$33.4MCVN 81 DETAILED DESIGN & CONSTRUCTION
Apr 29, 2024A00133$0DETAILED DESIGN & CONSTRUCTION AWARD MODIFICATION
Apr 29, 2024A00134$40.0KDETAILED DESIGN & CONSTRUCTION ISSUING MODIFICATION
Apr 24, 2024A00132$0DETAILED DESIGN & CONSTRUCTION ADMINISTRATIVE MODIFICATION
Apr 22, 2024A00130$0DETAILED DESIGN & CONSTRUCTION MATERIAL TRANSFER
Apr 22, 2024A00131$0CVN 80-81 DETAILED DESIGN & CONSTRUCTION PERIODIC RELEASE
Apr 18, 2024P00132$0QOS SPECIAL INCENTIVE
Apr 15, 2024A00129$4.2MCVN 80/81 DETAILED DESIGN, & CONSTRUCTION AWARD MODIFICATION TO ACQUIRE CHEMISTRY ANALYSIS PH METER HOLDERS AND TEMPORARY NETWORK SERVICE TO SUPPORT PRE-COMMISSIONING UNIT OPERATIONS.
Apr 11, 2024P00131$3.9MCVN 81 DETAILED DESIGN & CONSTRUCTION
Apr 10, 2024P00130$1.1MCVN 81 DETAILED DESIGN & CONSTRUCTION
Apr 5, 2024A00128$112.5KDETAILED DESIGN & CONSTRUCTION ISSUING MODIFICATION
Apr 3, 2024A00127$350.0KDETAILED DESIGN & CONSTRUCTION CONTRACT CHANGE FMR
Mar 28, 2024A00126$1.1MDETAILED DESIGN & CONSTRUCTION CONTRACT CHANGE HMR
Mar 27, 2024A00125$0CVN 80/81 DETAILED DESIGN & CONSTRUCTION CONTRACT CHANGE
Mar 21, 2024A00124$2.8MDETAILED DESIGN & CONSTRUCTION CONTRACT CHANGE HMR
Mar 19, 2024P00129$26.1MCVN 81 DETAILED DESIGN & CONSTRUCTION
Feb 27, 2024AZ0016$-752.0KCVN 80/81 DETAILED DESIGN & CONSTRUCTION CONTRACT CHANGE
Feb 23, 2024P00128$295.1MCVN 81 DETAILED DESIGN & CONSTRUCTION
Feb 22, 2024A00123$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION
Feb 20, 2024AZ0015$-1.2MCVN 80 AND 81 DETAILED DESIGN & CONSTRUCTION CONTRACT CHANGE
Feb 9, 2024A00122$0CVN 80-81 DETAILED DESIGN & CONSTRUCTION CONTRACT CHANGE
Feb 7, 2024AZ0014$841.4KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION
Feb 6, 2024A00121$195.0KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION
Jan 31, 2024AZ0013$1.7MCVN 80 AND 81 DETAILED DESIGN & CONSTRUCTION
Jan 31, 2024P00127$0CVN 81 DETAILED DESIGN & CONSTRUCTION
Jan 30, 2024P00126$686.2MCVN 81 DETAILED DESIGN & CONSTRUCTION
Jan 25, 2024A00120$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION
Jan 25, 2024AZ0012$1.3MCVN 80 AND 81 DETAILED DESIGN & CONSTRUCTION CONTRACT CHANGE
Jan 25, 2024P00125$0CLIN 2001 FMS CASE UPDATE
Jan 24, 2024A00119$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION CONTRACT CHANGE
Jan 9, 2024A00118$0CVN 80/81 DETAILED DESIGN & CONSTRUCTION CONTRACT CHANGE
Jan 9, 2024P00124$0CLIN 2001 FRENCH FMS POP EXTENSION
Jan 5, 2024A00117$600.0KCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION
Dec 20, 2023A00116$0CVN 80/81 DETAILED DESIGN & CONSTRUCTION CONTRACT CHANGE
Dec 19, 2023P00123$5.0MFORD CLASS SHORE BASED SPARES - EDG CONTROLLER
Dec 14, 2023P00122$50.0MNAVY NUCLEAR ENTERPRISE WORKFORCE INCENTIVE
Dec 12, 2023A00115$0CVN 80/81 DETAILED DESIGN & CONSTRUCTION CONTRACT CHANGE
Dec 11, 2023P00121$14.5MCLINS 0020 (RDTE) 0120 (SCN) AND 1003 (SCN) FUNDING
Dec 4, 2023A00114$0CVN 80/81 DETAILED DESIGN & CONSTRUCTION CONTRACT CHANGE
Nov 30, 2023P00120$500.0KCLIN 0020 - FUNDING
Nov 29, 2023A00113$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION
Nov 21, 2023P00119$5.9MDRY DOCK 12 CAPEX INCENTIVE EVENT #2
Nov 20, 2023A00112$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION
Nov 13, 2023A00110$0CVN 80/81 DETAILED DESIGN & CONSTRUCTION CONTRACT CHANGE
Nov 13, 2023A00111$0CVN 80/81 DETAILED DESIGN & CONSTRUCTION CONTRACT CHANGE
Nov 8, 2023A00109$1.5MCVN 80 & 81 DETAILED DESIGN & CONSTRUCTION
Nov 7, 2023A00108$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION
Nov 1, 2023A00107$0CVN 80 & 81 DETAILED DESIGN & CONSTRUCTION
Oct 31, 2023P00118$0CVN 81 DETAILED DESIGN & CONSTRUCTION
Oct 30, 2023A00106$92.3KCVN 80 DETAILED DESIGN & CONSTRUCTION
Oct 18, 2023AZ0010$11.3KCVN 80 AND 81 DETAILED DESIGN & CONSTRUCTION CONTRACT CHANGE
Oct 18, 2023P00117$122.2MCVN 81 DETAILED DESIGN & CONSTRUCTION
Oct 10, 2023P00116$15.0MCVN 81 DETAILED DESIGN & CONSTRUCTION
Oct 6, 2023A00104$0CVN 80/81 DETAILED DESIGN & CONSTRUCTION
Oct 6, 2023A00105$531.1KCVN 80/81 DETAILED DESIGN & CONSTRUCTION CONTRACT CHANGE
Oct 3, 2023A00103$112.5KCVN 80/81 DETAILED DESIGN & CONSTRUCTION CONTRACT CHANGE
Sep 29, 2023A00102$162.0KCVN 81 DETAILED DESIGN & CONSTRUCTION
Sep 29, 2023P00115$5.3KCVN 81 DETAILED DESIGN & CONSTRUCTION
Sep 27, 2023A00100$0CVN 80/81 DETAILED DESIGN & CONSTRUCTION CONTRACT CHANGE
Sep 27, 2023A00101$0CVN 81 DETAILED DESIGN & CONSTRUCTION
Sep 22, 2023A00099$223.5KCVN 80 DETAILED DESIGN & CONSTRUCTION
Sep 22, 2023P00114$373.9MCVN 81 DETAILED DESIGN & CONSTRUCTION
Sep 19, 2023A00098$2.5MCVN 80/81 DETAILED DESIGN & CONSTRUCTION CONTRACT CHANGE
Sep 18, 2023AZ0009$-132.5KCVN 80/81 DETAILED DESIGN & CONSTRUCTION CONTRACT CHANGE
Sep 11, 2023A00097$0CVN 80-81 DETAILED DESIGN & CONSTRUCTION CY2023Q1 BILLING PRICE

Estimated positioning window

Jun 2, 2035 – Dec 2, 2035

Recompete signal:
50/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 50/100. Available recorded signals: 45 points.

Contract end 2036-06-02 (3501 days from calculation)
+5 points
126 historical awards in this buyer and category group
+15 points
418 recorded award transactions
+10 points
Latest award action: 2026-06-05
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.