Federal contract award

N0002416C2229

DETAIL DESIGN AND CONSTRUCTION (DD&C) FOR T-AO 205

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeSUP OF SHIPBUILDING CONV AND REPAIR
NAICS336611 — Ship Building and Repairing
PSC1915 — Cargo and Tanker Vessels
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIXED PRICE INCENTIVE
Obligations$5.9B
Current contract value$6.0B
Potential contract value / ceiling$6.0B
Start dateJun 30, 2016
Current end dateMar 22, 2028
Potential end dateMar 22, 2028
Latest award activityJun 4, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 350 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 9, 2026A00272$01Q26 RBP
Jun 4, 2026A00271$2.0MCY26 WORK TASK FORM POOL PLUS-UP
Jun 1, 2026A00270$0206 GUCL REQN CORRECTION
May 27, 2026A00269$121.5KECP-147 / LAPTOP DE-OB
May 12, 2026A00268$872.4KT-AO 210 SELECTED SHIP BL1B
May 6, 2026A00267$383.6KT-AO 209 BL 5-C BIRD JOHNSON AND T-AO 211-212 BL GUCL
May 5, 2026A00266$116.3KT-AO 210 BL GUCL
Apr 28, 2026A00265$284.0KT-AO 211AF ECP-138
Apr 10, 2026P00080$22.3MT-AO 213 SELECTED SHIP
Apr 3, 2026A00264$879.9KT-AO 209 BL 5B
Mar 23, 2026A00263$-45.9KT-AO 209 CLIN 5005 5 DAYS DE-OB
Mar 13, 2026A00262$910.0KT-AO 213 ECP-130 E-STREAM 2.0 INTERFACE DRAWINGS
Mar 4, 2026A00261$3.3M2026 WTF POOL PLUS-UP AND 208/209 FO/LO REIMBURSEMENT
Feb 20, 2026A00260$5.0MT-AO 210 SELECTED SHIP
Feb 12, 2026A00259$0T-AO 210-213 3Q25 RBP
Feb 10, 2026A00258$0T-AO 208 AND 209 CY24 EPA
Jan 29, 2026P00078$0T-AO 213 SELECTED SHIP
Jan 29, 2026P00079$43.5MT-AO 213 SELECTED SHIP
Jan 21, 2026A00257$50.7KT-AO 208 BUY LIST 1E
Dec 18, 2025A00256$711.4KT-AO 212-213 ECP 101 NIXIE 25E UPDATE
Dec 15, 2025A00255$0DE-OB RE-OB TO CORRECT A00202
Dec 10, 2025A00254$289.7KT-AO 209 FOA EXTENSION AND 207-209 COMBINED BL PART NUMBER ADJUSTMENT
Dec 4, 2025A00253$0T-AO 209 2Q25 RBP
Nov 19, 2025A00252$1.5MT-AO 209 BUY LIST 5-A
Nov 3, 2025A00251$323.7K2Q25 RBP, 2024 EPA, 207-209 BUY LIST COMBINED E
Oct 30, 2025A00250$1.1MT-AO 213 ECP-129
Oct 29, 2025A00249$156.5KECP-115 CANES AND ICL UPDATE
Oct 29, 2025P00077$6.3MT-AO 207 AND 208 SELECTED SHIP
Oct 1, 2025A00248$499.4KT-AO 212-213 ECP-103 DARKENED SHIP
Sep 22, 2025A00247$213.2KT-AO 213 ECP-126
Sep 15, 2025A00246$440.0KT-AO 208 JP5 REIMBURSEMENT
Sep 9, 2025A00245$2.6MT-AO 211-213 ADG LOOP CHANGE (ECP-114)
Sep 5, 2025A00244$265.8KT-AO 208 BL COMBINED 1-D
Aug 8, 2025A00243$27.0KT-AO 209-211 LAPTOPS BUY LIST 1Q25 RBP
Aug 4, 2025A00242$89.8KBUY LISTS 207-209 COMBINED-D 207 COMBINED-D
Jul 31, 2025P00076$1.5MT-AO SPECIAL STUDIES FUNDING AND T-AO 208 GUARANTY CORRECTION OF DEFECTS FUNDING.
Jul 21, 2025A00241$310.8KT-AO 211-213 PTO/PTI & POWER AND LIGHTING OBSOLESCENCE (ECP-H-096)
Jul 9, 2025A00240$1.5MWORK TASK FORM POOL PLUS UP
Jul 7, 2025A00239$333.8KT-AO RFVS AND T-AO 207 JP5
Jun 16, 2025P00075$54.7MT-AO 209, 210, 211, AND 213 COST TO COMPLETE FUNDING AND ADMINISTRATIVE COST OVERRUN TRACKING MODIFICATION
Jun 5, 2025A00238$1.6MT-AO 213 ECP-128
May 27, 2025A00237$-372.6KT-AO 208 AFFF MODIFICATION (ECP-H-116)
Apr 28, 2025A00236$914.1KWTF POOL PLUS UP 207 FO LO REIMBURSEMENT 4Q24 RBP T-AO 208 EPA
Apr 22, 2025A00235$04Q24 RBP & CY23 EPA UPDATE
Apr 11, 2025P00074$130.2KT-AO PIO
Mar 24, 2025A00234$242.4KT-AO 208 BL 1C
Mar 17, 2025A00233$123.8KT-AO 207 BL 4C
Mar 11, 2025A00232$0T-AO WORK TASK FORM POOL REALIGNMENT
Mar 6, 2025A00231$637.1KT-AO 213 E-STREAM 2.0 ROCKWELL PARTS (ECP-100)
Feb 21, 2025A00230$148.7KT-AO 207 BL COMBINED-C
Feb 7, 2025A00229$352.4KT-AO 208 FOA EXTENSION
Feb 6, 2025A00228$2.0MT-AO 207-209 BL1C-COMBINED
Feb 5, 2025A00227$0WTF POOL REALIGNMENT (CLIN 7003)
Jan 15, 2025A00226$5.5KT-AO 209 BL 1C
Dec 6, 2024A00225$0T-AO 208 FOA TRANSFER OF CUSTODY
Dec 4, 2024A00224$0T-AO 205AF 2Q24 RBP T-AO 206,207,209 & 210 CY23 EPA
Dec 3, 2024P00071$600.0KT-AO 213 SELECTED SHIP
Nov 18, 2024A00223$17.3KT-AO 207 SELECTED SHIP PROVISIONED ITEM ORDER
Nov 6, 2024A00222$143.5KT-AO 208 BL 1B
Oct 30, 2024A00221$0T-AO 208AF
Oct 30, 2024P00070$5.2MT-AO 213 SELECTED SHIP
Oct 29, 2024A00220$105.1KT-AO 207 BL COMBINED-B
Oct 22, 2024A00219$5.3KT-AO 209 BL 1B
Oct 9, 2024A00218$0T-AO 206 AND 207 4Q23 RBP
Sep 25, 2024A00217$50.9KT-AO WTF POOL PLUS UP
Sep 13, 2024P00068$0ADMINISTRATIVE ACTION ONLY
Sep 5, 2024A00216$52.1KT-AO 211 ECP-098 CANCELLATION
Aug 30, 2024A00215$51.5KT-AO 206 BUY LIST POST-C
Aug 29, 2024P00067$1.0MT-AO 208 FUNDING
Aug 28, 2024A00214$25.4KT-AO 208 ECP-057 CANCELLATION COSTS
Jul 31, 2024A00213$534.5KT-AO 209AF ECP-090
Jul 26, 2024A00212$412.2KT-AO WORK TASK FORM POOL PLUS UP
Jul 25, 2024A00211$2.5MT-AO 211AF ECP-110
Jul 23, 2024A00210$1.0MECP-083 & ECP-084
Jul 19, 2024A00209$7.0MT-AO 207-209 BUY LIST 1B COMBINED
Jul 11, 2024A00208$1.6MT-AO 205 & 206 BUY LIST COMBINED-A.
Jul 8, 2024A00207$354.6KECP-H-102 T-AO 208AF STAINLESS STEEL VALVES & PIPING
Jun 11, 2024A00206$396.5KT-AO 209AF ECP-047
Jun 3, 2024P00066$65.8MT-AO 213 SELECTED SHIP
May 29, 2024A00205$148.2KT-AO 209AF ECP-089 HELO OBSTRUCTION LIGHTS
May 23, 2024A00204$1.6MT-AO 207 BUY LIST COMBINED-A
May 14, 2024A00203$1.3MECP-H-061 T-AO 209AF TURNKEY APPROACH & GFI APPROACH
May 6, 2024A00202$5.2MT-AO 207-209 BUY LIST COMBINED - A
Apr 23, 2024A00201$18.1KT-AO 206 BL 7 POST B
Apr 19, 2024A00199$731.8KT-AO 207 BUY LIST 4A & T-AO 209 BUY LIST 1A
Apr 19, 2024A00200$71.0KCY24 WTF POOL PLUS UP
Apr 17, 2024P00065$11.5MT-AO 213 SELECTED SHIP
Apr 3, 2024P00064$1.0MT-AO 213 SELECTED SHIP
Apr 2, 2024A00198$-917T-AO 210AF ECP-088
Mar 14, 2024A00197$2.3MT-AO 208 BUY LIST 1A
Feb 27, 2024A00196$43.7KT-AO CY24 WTF POOL PLUS UP
Feb 21, 2024A00195$408.3KECP-078 T-AO 209AF ASD MOTOR & ENCODER
Feb 20, 2024A00194$160.1KT-AO 208AF ECP-087
Feb 14, 2024A00193$1.9KT-AO 206 BUY LIST 6 SPEC REV 1 (PRICE ADJUSTMENT)
Feb 9, 2024A00192$2.0MT-AO CY24 WORK TASK FORM POOL
Feb 6, 2024P00063$2.2MT-AO 213 SELECTED SHIP
Feb 1, 2024A00191$17.7KECP-086 ASGSI VLA MOD
Jan 5, 2024A00189$205.3KT-AO 208AF ECP-074 & ECP-079
Jan 5, 2024A00190$45.0KT-AO 206 BL6 NONSPEC-B
Dec 20, 2023A00188$564.8KT-AO 208AF ECP-081 MDE VALVE ACTUATOR ANALOG CONTROL 207 BUY LIST 3 NONSPEC-B
Dec 15, 2023A00187$503.5KECP-062 RELOCATION OF GUN MOUNTS & BALLISTIC SHIELDS
Dec 14, 2023P00062$8.2MT-AO 213 SELECTED SHIP
Dec 11, 2023A00186$0T-AO 206-210 2Q23 RBP
Dec 5, 2023P00061$0T-AO 213 SELECTED SHIP
Nov 21, 2023A00184$310.4KT-AO 211 AND 212 2Q23 RBP T-AO 207 BL FME 3B
Nov 17, 2023P00060$8.5MT-AO 213 SELECTED SHIP
Nov 16, 2023A00183$1.2MT-AO 208AF ECP-044 T-AO 207AF ECP-053 T-AO 208AF ECP-072
Nov 2, 2023A00182$194.7KT-AO 208 ECP-069 AND ECP-073
Nov 2, 2023P00059$7.5MT-AO 213 SELECTED SHIP
Nov 1, 2023A00181$929.9KT-AO 207-209 BUY LIST GUCL-A EN_DK, T-AO 207-207 BUY LIST GUCL-A SD_SU, T-AO 207AF ECP-026 SLIDING BLOCK PARTS
Oct 30, 2023P00058$1.0MT-AO 213 SELECTED SHIP
Oct 17, 2023A00180$1.3MT-AO WTF POOL PLUS UP
Oct 5, 2023A00179$48.4KT-AO 208AF ECP-076
Oct 4, 2023A00178$6.9KT-AO 208 ECP-055 CANCELLATION COSTS
Sep 27, 2023P00057$706.1KT-AO 213 SELECTED SHIP
Sep 26, 2023A00177$3.3MT-AO 208AF ECP-071, T-AO 205 AND 206 FUEL REIMBURSEMENT
Sep 25, 2023A00176$0T-AO SECTION C EDITS
Sep 25, 2023P00056$667.2KT-AO 213 SELECTED SHIP
Sep 20, 2023A00175$676.5KT-AO 205 JP5 PIPING CLAIM
Sep 18, 2023A00174$239.1KT-AO 206 BUY LIST 7 POST-A
Sep 11, 2023A00173$283.0KECP-H-043 T-AO 207AF HEAVY DOOR CLOSURES
Aug 31, 2023A00172$25.1KT-AO 208AF ECP-077 & T-AO 205 SEA CHEST INS
Aug 17, 2023A00171$0T-AO 208 ECP-085
Aug 15, 2023A00170$11.4KT-AO 208AF ECP-075
Aug 11, 2023A00169$1000.0KCY23 WTF POOL PLUS UP
Aug 11, 2023P00055$5.8MT-AO 205 AND T-AO 206 SELECTED SHIP
Aug 10, 2023A00168$14.0KOUTFITTING MOD CANCELLATION COSTS
Aug 3, 2023A00167$96.4KT-AO 205 BUY LIST 18C
Aug 3, 2023P00054$517.5KT-AO 206 SELECTED SHIP
Jul 26, 2023A00166$01QCY23 RBP & 2022 EPA
Jul 21, 2023A00165$51.6KT-AO 209AF ECP-070
Jul 7, 2023A00164$919.3KT-AO 205 BL 16D, T-AO 206 BL 6 WART, T-AO 207 BL 3 WART
Jun 30, 2023A00163$497.5KT-AO 207 BL3 SPEC & T-AO 206 BL6 FME DE-OB
Jun 28, 2023A00162$869.2KT-AO 206 BUY LIST 5B T-AO 206 BUY LIST 6RR-A AND T-AO 206 BUY LIST 2C
Jun 27, 2023P00053$0T-AO 213 SELECTED SHIP
Jun 21, 2023P00052$1.1MPIO SPARES
Jun 20, 2023A00160$252.0KT-AO WTF POOL PLUS UP
Jun 20, 2023A00161$1.6MT-AO 206 AND 207 TMS BUY LIST
Jun 14, 2023A00159$830.3KT-AO 207 BL 3RR
Jun 13, 2023A00158$49.8KT-AO 206 BUY LIST 6SPEC
Jun 9, 2023A00157$-5.2KT-AO 213 DE-OBLIGATION OF FUNDING ASSOCIATED WITH ECP-052
Jun 1, 2023P00051$92.5MT-AO 213 SELECTED SHIP
May 26, 2023A00156$176.9KT-AO 207AF ACOUSTIC COUNTERMEASURES RSL (ECP-052)
May 25, 2023A00155$397.6KT-AO 206 BL 6NONSPEC AND 207 BL 3NONSPEC
May 23, 2023A00154$3.9MT-AO 206 BL 6FME, T-AO 207 BL 3FME, T-AO 207AF ECP064
May 19, 2023P00050$736.2MT-AO 213 SELECTED SHIP
May 12, 2023A00153$1.3MT-AO 209AF ECP-059
May 8, 2023A00152$54.6KECP-067 T-AO 211AF WOOD SNATCH BLOCK PARTS
May 8, 2023P00049$0T-AO 212 SELECTED SHIP
May 2, 2023A00151$212.1KT-AO 211AF MARPOL CHANGES (ECP-066)
Apr 14, 2023A00150$0T-AO 4QCY22 RBP
Apr 13, 2023A00149$39.0KT-AO 205 BL19B
Apr 11, 2023A00148$665.3KT-AO WTF POOL
Apr 6, 2023A00147$438.9KT-AO 206 AF CHANGE ORDER
Apr 3, 2023A00146$224.5KT-AO 205 BUY LIST 17B & T-AO 206 BUY LIST 3B
Mar 29, 2023A00145$84.2KT-AO 206 ECP-031 AND 036 CANCELLATION COSTS
Mar 24, 2023A00144$435.9KT-AO 207 ECP-034 & T-AO WTF POOL REALIGN
Mar 23, 2023A00143$19.1KECP-063 MORIAH NETWORK SWITCH TO J-7 T-AO 207AF
Mar 16, 2023A00141$03QCY22 RBP & 2021 EPA TO INCLUDE T-AO 207
Mar 16, 2023A00142$1.5KT-AO 205 BUY LIST 20B
Mar 14, 2023A00140$101.7KT-AO 206 BUY LIST 4B
Mar 14, 2023P00048$87.7MT-AO 212 SELECTED SHIP
Mar 2, 2023A00139$112.2KT-AO 206-208 LAPTOPS T-AO 205 16C T-AO 206AF ECP-068
Feb 24, 2023A00138$4.1MT-AO 208AF ECP-060
Feb 21, 2023A00137$214.3KT-AO 212 SELECTED SHIP
Feb 8, 2023P00047$200.0KT-AO 212 SELECTED SHIP
Feb 7, 2023A00136$739.7KT-AO 212 SELECTED SHIP
Jan 27, 2023A00134$708.6KT-AO 212 SELECTED SHIP
Jan 27, 2023A00135$6.8KT-AO 205 & 206 BL GUCL C
Jan 26, 2023A00133$1.1MT-AO 212 SELECTED SHIP
Jan 26, 2023P00046$7.0MT-AO 212 SELECTED SHIP
Jan 13, 2023P00045$368.5KT-AO 212 SELECTED SHIP
Jan 4, 2023A00132$360.3KT-AO 206AF ECP-029
Dec 19, 2022A00131$30.8KT-AO 212 SELECTED SHIP
Dec 14, 2022A00130$902.1KT-AO 206 BL5A
Dec 6, 2022A00129$62.8KT-AO ECP-056
Nov 30, 2022A00127$89.6KT-AO 207 ECP-065
Nov 30, 2022A00128$02Q22 RBP
Nov 29, 2022A00126$0T-AO CY 2021 ECONOMIC PRICE ADJUSTMENT (EPA)
Nov 18, 2022A00125$11.9KT-AO 212 SELECTED SHIP
Nov 17, 2022P00044$719.4KTA-O 205-207 FAST RESCUE BOATS
Oct 27, 2022A00124$20.8KT-AO 212 SELECTED SHIP
Oct 20, 2022A00123$114.4KT-AO 212 SELECTED SHIP
Oct 18, 2022P00043$0T-AO CAPITAL EXPENDITURES PROJECT
Sep 30, 2022A00122$114.0KT-AO 212 SELECTED SHIP
Sep 27, 2022A00121$500.4KT-AO 205 BL18A
Sep 20, 2022A00120$61.0KT-AO 212 SELECTED SHIP
Sep 15, 2022A00119$158.4KT-AO ECP-039
Aug 31, 2022P00042$18.2MADMINISTRATIVE ACTIONS
Aug 30, 2022P00041$0ADMINISTRATION UPDATES
Aug 15, 2022A00118$01Q22 RBP
Aug 11, 2022A00117$363.1KT-AO 212 SELECTED SHIP
Aug 10, 2022A00116$454.9KT-AO WTF POOL
Aug 4, 2022P00040$890.5MDETAIL DESIGN AND CONSTRUCTION OF T-AO 205 CLASS FLEET REPLENISHMENT OILERS
Aug 2, 2022A00115$0T-AO WTF REALIGN
Jul 20, 2022A00114$177.4KT-AO 206 & 207 ECP-023 PRINTER CABINET
Jul 19, 2022AZ0002$10.0KT-AO 205 ECP-016 DEFIN
Jul 18, 2022A00113$138.1KT-AO 205 - DETAIL DESIGN & CONSTRUCTION ECP-041, T-AO 205-210 WOOD SNATCH BLOCK PARTS
Jun 30, 2022A00112$1.1MT-AO 207AF ECP-035 MARPOL PIPING
Jun 28, 2022P00038$502.5MT-AO 205 CLASS LONG LEAD TIME MATERIAL

Estimated positioning window

Mar 22, 2027 – Sep 22, 2027

Modeled likelihood: 65%. These are AcornBids estimates, not confirmed solicitation dates.

{
  "psc": "1915",
  "naics": "336611",
  "agency": "Department of Defense",
  "office": "SUP OF SHIPBUILDING CONV AND REPAIR",
  "incumbent": "NATIONAL STEEL AND SHIPBUILDING COMPANY",
  "known_forecast": false,
  "option_end_date": "2028-03-22",
  "contract_end_date": "2028-03-22",
  "latest_action_date": "2026-06-04",
  "modification_count": 350,
  "previous_solicitation": "N0002415R2200",
  "historical_award_count": 2,
  "historical_cadence_days": 2993
}

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.