Federal contract award
N0002416C2427
DETAIL DESIGN AND CONSTRUCTION (DD&C) FOR LHA 8 (INITIAL EFFORT LIMITED TO PLANNING, ADVANCED ENGINEERING AND PROCUREMENT OF LONG LEAD TIME MATERIAL)
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | SUP OF SHIPBUILDING CONV AND REPAIR |
| NAICS | 336611 — Ship Building and Repairing |
| PSC | 1905 — Combat Ships and Landing Vessels |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIXED PRICE INCENTIVE |
| Obligations | $3.4B |
| Current contract value | $3.5B |
| Potential contract value / ceiling | $3.5B |
| Start date | Jun 30, 2016 |
| Current end date | Dec 31, 2026 |
| Potential end date | Dec 31, 2026 |
| Latest award activity | May 26, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 200 of 676 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 26, 2026 | A00585 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| May 6, 2026 | A00584 | $1.0M | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| May 4, 2026 | A00583 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Apr 27, 2026 | A00582 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Apr 22, 2026 | A00581 | $10.0K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Apr 8, 2026 | P00077 | $53.7M | FPDS-NG VALUE TO ALLOW POSTING |
| Mar 31, 2026 | A00580 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Mar 16, 2026 | P00075 | $70.0K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Mar 16, 2026 | P00076 | $4.8M | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Feb 11, 2026 | A00579 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jan 30, 2026 | P00074 | $40.0M | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jan 28, 2026 | A00578 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jan 16, 2026 | A00577 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Dec 16, 2025 | A00576 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Dec 11, 2025 | A00575 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Dec 10, 2025 | P00073 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Dec 4, 2025 | A00574 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Nov 17, 2025 | A00572 | $365.7K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Nov 17, 2025 | A00573 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Nov 12, 2025 | A00571 | $2.4M | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Nov 3, 2025 | A00570 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Oct 23, 2025 | A00568 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Oct 23, 2025 | A00569 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Sep 24, 2025 | A00567 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Sep 23, 2025 | A00566 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Sep 16, 2025 | A00565 | $8.0K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Sep 8, 2025 | A00564 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Aug 25, 2025 | A00562 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Aug 25, 2025 | A00563 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Aug 20, 2025 | A00561 | $-8.6K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Aug 14, 2025 | A00559 | $-16.7K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Aug 14, 2025 | A00560 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Aug 13, 2025 | A00558 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Aug 12, 2025 | A00557 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jul 31, 2025 | A00555 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jul 31, 2025 | A00556 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jul 14, 2025 | A00554 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jul 14, 2025 | P00072 | $350.0K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jul 10, 2025 | A00553 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jun 26, 2025 | P00071 | $79.4M | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jun 11, 2025 | A00552 | $10.0K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jun 5, 2025 | A00551 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| May 28, 2025 | A00550 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| May 27, 2025 | AZ0012 | $64.7K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| May 20, 2025 | A00549 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| May 19, 2025 | A00548 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Apr 25, 2025 | P00070 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Mar 26, 2025 | A00547 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Mar 24, 2025 | A00546 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Mar 17, 2025 | A00545 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Feb 28, 2025 | A00544 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Feb 24, 2025 | P00069 | $270.0K | FUNDING MOD |
| Feb 13, 2025 | A00542 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Feb 13, 2025 | A00543 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jan 31, 2025 | A00541 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jan 28, 2025 | A00540 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jan 23, 2025 | A00539 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jan 22, 2025 | A00537 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jan 22, 2025 | A00538 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jan 17, 2025 | A00536 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jan 13, 2025 | A00533 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jan 13, 2025 | A00534 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jan 13, 2025 | A00535 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Dec 20, 2024 | A00532 | $3.1M | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Dec 17, 2024 | A00531 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Dec 17, 2024 | P00068 | $117.5K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Dec 9, 2024 | A00530 | $500.0K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Nov 21, 2024 | A00529 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Nov 20, 2024 | A00528 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Nov 13, 2024 | A00527 | $8.0K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Nov 6, 2024 | P00067 | $250.0K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Oct 31, 2024 | A00526 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Oct 29, 2024 | A00525 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Oct 15, 2024 | A00523 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Oct 15, 2024 | A00524 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Oct 7, 2024 | A00522 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Oct 1, 2024 | A00521 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Sep 12, 2024 | A00520 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Sep 12, 2024 | P00066 | $-41.8K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Aug 28, 2024 | P00065 | $108.2K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Aug 27, 2024 | A00519 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Aug 16, 2024 | A00518 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Aug 7, 2024 | A00517 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jul 31, 2024 | A00516 | $3.4M | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jul 24, 2024 | A00515 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jul 16, 2024 | A00514 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jul 10, 2024 | A00513 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jul 1, 2024 | A00511 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jul 1, 2024 | A00512 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jun 18, 2024 | A00510 | $8.0K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jun 17, 2024 | A00509 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jun 11, 2024 | A00508 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jun 4, 2024 | A00507 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| May 21, 2024 | A00506 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| May 9, 2024 | A00505 | $203.0K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Apr 30, 2024 | P00064 | $340.8K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Apr 23, 2024 | A00504 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Apr 10, 2024 | A00503 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Mar 26, 2024 | A00501 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Mar 26, 2024 | A00502 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Mar 20, 2024 | A00500 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Mar 18, 2024 | AZ0011 | $592.9K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Mar 5, 2024 | A00499 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Feb 29, 2024 | A00497 | $390.2K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Feb 29, 2024 | A00498 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Feb 28, 2024 | A00496 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Feb 21, 2024 | P00063 | $131.0K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Feb 13, 2024 | AZ0010 | $155.7K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Feb 8, 2024 | A00495 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jan 30, 2024 | A00494 | $10.0K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jan 30, 2024 | AZ0009 | $280.4K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jan 24, 2024 | A00493 | $1.3M | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jan 24, 2024 | AZ0008 | $277.0K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jan 12, 2024 | A00492 | $1.0M | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jan 9, 2024 | A00491 | $1.4M | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Dec 19, 2023 | A00490 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Dec 13, 2023 | A00487 | $112.5K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Dec 13, 2023 | A00488 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Dec 13, 2023 | A00489 | $77.1K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Dec 6, 2023 | A00486 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Nov 30, 2023 | A00485 | $138.7K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Nov 30, 2023 | P00062 | $4.7M | LHA 8 DETAIL DESIGN AND CONSTRUCTION. LAUNCH INCENTIVE FUNDING SLIN 000306. |
| Nov 28, 2023 | A00483 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Nov 28, 2023 | A00484 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Nov 16, 2023 | A00482 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Nov 16, 2023 | P00061 | $276.9K | LHA 8 DETAIL DESIGN AND CONSTRUCTION. INCENTIVE FUNDING AND SPECIAL STUDIES FUNDING. |
| Oct 31, 2023 | A00481 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Oct 30, 2023 | A00480 | $843.5K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Oct 19, 2023 | A00478 | $76.2K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Oct 19, 2023 | A00479 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Oct 17, 2023 | A00477 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Oct 10, 2023 | A00475 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Oct 10, 2023 | A00476 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Oct 10, 2023 | P00060 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION, SHIFT HOURS UNDER CLINS AND CHANGE POP |
| Sep 20, 2023 | A00474 | $3.3M | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Sep 19, 2023 | A00472 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Sep 19, 2023 | A00473 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Sep 13, 2023 | A00471 | $87.3K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Sep 7, 2023 | A00470 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Sep 1, 2023 | P00059 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION SECTION B INCENTIVES UPDATE |
| Aug 30, 2023 | AZ0006 | $96.0K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Aug 30, 2023 | AZ0007 | $22.7K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Aug 25, 2023 | AZ0005 | $196.5K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Aug 23, 2023 | A00469 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Aug 18, 2023 | A00467 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Aug 18, 2023 | A00468 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Aug 17, 2023 | AZ0004 | $72.2K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Aug 10, 2023 | A00466 | $10.0K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jul 27, 2023 | P00058 | $-61.3K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jul 26, 2023 | A00465 | $41.3K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jul 25, 2023 | A00463 | $194.3K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jul 25, 2023 | A00464 | $131.2K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jul 12, 2023 | A00462 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jun 20, 2023 | A00461 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jun 14, 2023 | P00057 | $240.9K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jun 13, 2023 | A00460 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jun 7, 2023 | A00459 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jun 6, 2023 | A00458 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| May 31, 2023 | A00456 | $483.0K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| May 31, 2023 | A00457 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| May 23, 2023 | AZ0003 | $266.7K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| May 18, 2023 | A00455 | $662.2K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| May 18, 2023 | P00056 | $710.0K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| May 12, 2023 | A00454 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| May 11, 2023 | A00453 | $2.8M | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Apr 25, 2023 | A00452 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Apr 24, 2023 | A00451 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Apr 21, 2023 | P00055 | $400.0K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Apr 7, 2023 | A00449 | $1.0M | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Apr 7, 2023 | A00450 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Apr 4, 2023 | A00448 | $18.0K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Mar 28, 2023 | A00447 | $2.9M | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Mar 27, 2023 | P00054 | $589.6K | LHA 8 SNUBBERS MATERIAL ONLY |
| Mar 17, 2023 | A00446 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Mar 9, 2023 | P00053 | $1.6M | FUNDING ONLY |
| Feb 24, 2023 | A00445 | $391.5K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Feb 22, 2023 | A00444 | $10.0K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Feb 15, 2023 | A00443 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Feb 14, 2023 | A00442 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Feb 9, 2023 | A00441 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jan 30, 2023 | A00440 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jan 25, 2023 | A00439 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jan 23, 2023 | A00437 | $1.6M | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jan 23, 2023 | A00438 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jan 17, 2023 | A00436 | $-76.4K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Jan 10, 2023 | P00052 | $100.0K | LHA 8 DETAIL DESIGN AND CONSTRUCTION. DEOB AND OBLIGATION OF FUNDING. CHANGE OF COR INFO UNDER SECTION G. |
| Dec 22, 2022 | A00435 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Dec 15, 2022 | A00434 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Dec 12, 2022 | A00433 | $332.2K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Dec 5, 2022 | A00432 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Nov 23, 2022 | A00431 | $283.2K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Nov 21, 2022 | A00430 | $395.0K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Nov 14, 2022 | A00428 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Nov 14, 2022 | A00429 | $211.4K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Nov 7, 2022 | P00051 | $1.1M | EXERCISE OPTION CLIN 0011, FUNDING CLIN 0003 AND 0011. |
| Nov 4, 2022 | A00427 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Oct 25, 2022 | A00426 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Oct 18, 2022 | A00425 | $12.0K | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Oct 5, 2022 | A00424 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
| Oct 3, 2022 | A00423 | $0 | LHA 8 DETAIL DESIGN AND CONSTRUCTION |
Estimated positioning window
Nov 1, 2026 – Jan 30, 2027
80/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 80/100. Available recorded signals: 75 points.
- Contract end 2026-12-31 (60 days from calculation)
- +35 points
- 21 historical awards in this buyer and category group
- +15 points
- 676 recorded award transactions
- +10 points
- Latest award action: 2026-05-26
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.