Federal contract award

N0002417C2100

SSN 802 AND 803 LONG LEAD TIME MATERIAL

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeSUP OF SHIPBUILDING GROTON
NAICS336611 — Ship Building and Repairing
PSC1905 — Combat Ships and Landing Vessels
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIXED PRICE INCENTIVE
Obligations$34.9B
Current contract value$35.9B
Potential contract value / ceiling$40.8B
Start dateFeb 14, 2017
Current end dateJun 2, 2036
Potential end dateJun 2, 2036
Latest award activityJun 2, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 453 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 2, 2026A00375$391.6KINSTALL IMPROVED DIESEL GENERATOR BLACK START HEAT SHIELD.
May 21, 2026A00374$71.5KPROCUREMENT OF TWO DS16-SUB WASHERS-EXTRACTORS AND PROVIDE PREVENTATIVE MAINTENANCE AND STORAGE
May 20, 2026A00373$0CANCELLATION OF SUBJECT MOD A00259
May 19, 2026A00372$0REVISED BILLING FOR SUBJECT CONTRACT- 4Q25
May 14, 2026A00370$0ADDITIVE MANUFACTURE (AM) TRASH DISPOSAL UNIT (TDU) VALVE BODY LINER.
May 14, 2026A00371$0RADAR EHP UNIT DIVERSION
May 12, 2026A00368$0IMPLEMENT STOWAGE CHANGES
May 12, 2026A00369$16.8KWATERTIGHT DOOR INSPECTIONS
May 11, 2026P00065$-16.9MSSN 812 CONSTRUCTION (BOAT 2, FY 24)
May 5, 2026A00367$0DELETION/CHANGES/ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS
Apr 22, 2026P00064$0SSN 812 CONSTRUCTION (BOAT 2, FY 24)
Apr 15, 2026A00366$23.2KEXTEND PERIOD PERFORMANCE OF HUNTINGTON HALLS CREW BERTHING THROUGH MAY 2026
Apr 7, 2026A00365$593.7KPROVIDING UNDER 50K COUPONS TO REDUCE DELAYS WHILST COMPLETING WORK WITHIN SCOPE.
Apr 1, 2026A00364$204.1KPROCUREMENT OF SELF-CONTAINED BREATHING APPARATUS MASKS
Apr 1, 2026P00063$275.2MSSN 812 CONSTRUCTION (BOAT 2, FY 24)
Mar 23, 2026A00363$0ADMINISTRATIVE MODIFICATION TO MODIFICATION A00343 TO CORRECT APPLICABLE HULLS.
Mar 18, 2026A00362$0ADMINISTRATIVE MODIFICATION TO MODIFICATION A00304 TO CORRECT MODIFICATION AUTHORITY
Mar 16, 2026A00360$0REPLACE DIESEL FRESHWATER HOSE
Mar 16, 2026A00361$51.8KCOST INCREASE AND PERIOD OF PERFORMANCE EXTENSION FOR PROCUREMENT OF TEN WASHERS-EXTRACTORS AND PREVENTATIVE MAINTENANCE AND STORAGE
Mar 11, 2026A00358$0TRANSFER OF GENERATORS BETWEEN MULTIPLE VIRGINIA BLOCK CONTRACTS
Mar 11, 2026A00359$0COMPENSATION ADJUSTMENT DECEMBER 2025
Mar 5, 2026A00357$0THE DIVERSION OF A WATERTIGHT DOOR BETWEEN HULLS.
Feb 25, 2026A00356$0ADMIN MOD TO A00355
Feb 23, 2026A00354$0DIVERT LAB ARRAY MATERIAL CANCELLATION
Feb 23, 2026A00355$0DIVERT FLUID FLOW RESTRICTOR CANCELLATION
Feb 19, 2026A00353$0ADMINISTRATIVE MODIFICATION TO A00352
Feb 13, 2026A00352$1ADMINISTRATIVE MODIFICATION FOR A00345
Feb 12, 2026A00351$2.4MLAB ARRAY CABLES DESIGN UPGRADE
Feb 11, 2026A00349$0DIVERT FLUID FLOW RESTRICTOR
Feb 11, 2026A00350$0DIVERT FLUID FLOW RESTRICTOR
Feb 10, 2026A00348$0DIVERT SONAR TERMINAL TO THE FLEET
Feb 9, 2026A00347$0DIVERT AFT LOW PRESSURE BLOWER
Feb 5, 2026A00346$0DIVERSION OF MEDICAL CHILL BOX BETWEEN HULLS
Jan 29, 2026A00345$2.1MPROCUREMENT OF CONSTANT FLOW FITTINGS
Jan 28, 2026A00344$0REVISED BILLING PRICE 3Q25
Jan 6, 2026P00062$7.1MSSN 812 CONSTRUCTION (BOAT 2, FY 24)
Dec 23, 2025A00343$0INCORPORATION OF PREVIOUSLY AUTHORIZED CHANGES UNDER COUPON PROCESS FOR VIRGINIA CLASS AUTHORIZING MOD A00191
Dec 22, 2025A00342$0DELETION/CHANGES/ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON-BOARD REPAIR PARTS
Dec 16, 2025A00341$111.5KORDER FOR CREW MESSING/BERTHING AT NEWPORT NEWS SHIPBUILDING
Dec 15, 2025A00340$598.7KESTABLISHMENT OF A PROCESS FOR SHIP'S FORCE WORK CONTROLS DURING NEW CONSTRUCTION.
Dec 9, 2025A00337$0PERFORM AIR CONDITIONER TESTING ON VIRGINIA PAYLOAD MODULES
Dec 9, 2025A00338$0DIVERT DIESEL SEA WATER PUMP
Dec 9, 2025A00339$0CHANGE IN PROCUREMENT NEEDS FOR ATMOSPHERE MONITORING SYSTEM.
Nov 24, 2025A00336$1.1MDESIGN DATA REVIEW TEAM INCORPORATION OF VIRGINIA PAYLOAD MODULE DRAWINGS
Nov 21, 2025A00335$0IMPLEMENTATION OF VIRGINIA CLASS SPECIFICATION CHANGE PROPOSALS
Nov 20, 2025A00334$0DIVERSION OF JOYSTICKS
Nov 18, 2025A00333$0DIVERSION OF DURA-9 SEAM FILLER KITS
Nov 12, 2025A00332$0DIVERSION OF LONG FAIRING ASSEMBLY
Nov 7, 2025A00331$0TRANSFER CENTRAL ATMOSPHERE MONITORING SYSTEM UNITS FOR FLEET TESTING
Nov 3, 2025A00330$0UPDATES ON BOARD REPAIR PARTS STOWAGE REQUIREMENTS IN ACCORDANCE WITH REDESIGN LIST
Oct 29, 2025A00329$0REVISED BILLING FOR SUBJECT CONTRACT - 2Q25
Oct 27, 2025A00328$0ADMINISTRATIVE MODIFICATION PERIODIC RELEASE JUNE 2024
Oct 24, 2025AZ0015$-151.1KUPDATE DESCRIPTION TO READ AS FOLLOWS: PROCURE SHIP SERVICE HYDRAULIC OIL COOLER DESIGNS WITH UPGRADED BUNDLES
Oct 21, 2025A00327$382.6KINCORPORATE DRAIN PUMP MATERIAL CHANGE
Oct 21, 2025AZ0014$351.1KMIDBLOCK V INSERTION, VIRGINIA PAYLOAD MODULE FORWARD BULKHEAD MODIFICATIONS
Oct 9, 2025A00326$0ADMINISTRATIVE MODIFICATION TO A00300
Oct 8, 2025AZ0013$3.0KMODULE DIVERSION
Sep 30, 2025A00325$41.5MEQUITABLE ADJUSTMENT
Sep 30, 2025AZ0012$0MAROTTA VALVES DIVERSION
Sep 26, 2025A00324$5.3KDIVERSION OF MODULES
Sep 18, 2025AZ0011$123.5KMICROPROCESSOR BOARDS
Sep 17, 2025A00321$0MATERIAL DIVERSION
Sep 17, 2025A00322$0DELETION/CHANGES/ADDITIONS OF GOVERNMENT FURNISHED SPECIAL STOWAGE
Sep 17, 2025A00323$0STOWAGE REQUIREMENTS
Sep 16, 2025A00319$0DIVERT TWO (2) LONG FAIRING ASSEMBLY
Sep 16, 2025A00320$0MATERIAL DIVERSION
Sep 10, 2025P00061$6.9MSSN 812 CONSTRUCTION (BOAT 2, FY 24)
Sep 8, 2025A00318$0THIN LINE TOWED ARRAY HANDLING SYSTEM REDUCED WRAP CAPSTAN ASSEMBLY MODIFIED DESIGN IMPLEMENTATION
Aug 29, 2025A00317$0WEAPONS SHIPPING TRUNK ALIGNMENT OF UPPER HATCH FAIRING
Aug 25, 2025A00316$0WEAPONS SHIPPING TRUNK ALIGNMENT OF UPPER HATCH FAIRING
Aug 20, 2025A00315$0DELETION/CHANGES/ADDITIONS OF GOVERNMENT FURNISHED SPECIAL STOWAGE
Aug 19, 2025AZ0010$270.1KADDITIONAL SHIP SYSTEM TURBINE GENERATOR TESTING
Aug 13, 2025A00314$0DIVERT DIFFERENTIAL PRESSURE DETECTOR TO ANOTHER SHIP
Aug 11, 2025A00313$0REPLACE FLIGHT CONTROL JOYSTICK
Aug 5, 2025A00312$0INCORPORATES LIABILITY COVERAGE FOR THE BALANCE TESTING OF THE MAIN PROPULSION UNIT, A FUTURE DESIGN EFFORT, INTO THE CONSTRUCTION CONTRACT.
Aug 4, 2025AZ0008$2.6MTANK LEVEL INDICATION CONNECTOR REDESIGN
Aug 4, 2025AZ0009$117.6KSAIL CONDUCTIVITY, TEMPERATURE, AND DEPTH SENSOR REDESIGN
Jul 28, 2025P00060$0SSN 812 CONSTRUCTION (BOAT 2, FY 24)
Jul 21, 2025A00310$25.0MPROCUREMENT OF FIVE ONBOARD REPAIR PART SHIP-SETS
Jul 3, 2025A00309$171.6KNON-CONDUCTIVE COATING AND LOW SMOKE COATING EARLY IMPLEMENTATION OF SELECT COMPONENTS
Jul 2, 2025A00308$45.1KORDER 9920 COMMON WEAPON LAUNCHER ANALOG DEVICES
Jul 1, 2025A00307$0REVISED BILLING PRICE THROUGH 1ST QUARTER 2025
Jun 25, 2025A00306$0DELETION/CHANGES/ADDITIONS OF GOVERNMENT FURNISHED SPECIAL STOWAGE
Jun 18, 2025A00304$0DIVERSION OF HULL PENETRATOR ASSEMBLY
Jun 18, 2025A00305$115.7KPROCUREMENT OF CONSTRUCTION SPARES FOR INSULATED-GATE BIPOLAR TRANSISTORS
Jun 17, 2025A00303$0STOWAGE FOR VIRGINIA CLASS
Jun 4, 2025A00302$121.2KPROCURE CAMERA COMPONENTS
Jun 3, 2025A00300$0INSTALL ADVANCED MATERIAL TAILCONE VERSION 3
Jun 3, 2025A00301$676.9KPROCUREMENT OF SHIP SERVICE HYDRAULIC OIL COOLER DESIGNS
May 28, 2025A00299$0WATERTIGHT DOOR INSTALLATION
May 27, 2025A00298$0DIVERT THE STERN PLANE OPERATING ROD
May 13, 2025A00297$4.5MGOVERNMENT FURNISHED REPAIR QUICK RESPONSE ACTIONS
May 9, 2025A00295$0DIVERT DIESEL GENERATOR CONTROL MODULES
May 9, 2025A00296$0UPDATES WEIGHT AND MOMENT DATA ON CHANGE ORDER MODIFICATION A00079
May 7, 2025A00294$0PERIODIC RELEASE OF CLAIMS - 31 DEC 24
Apr 30, 2025PZ0059$8.4BSSN 812 CONSTRUCTION (BOAT 2, FY 24)
Apr 28, 2025A00293$0INSTALLATION OF UNDERSEA DOMINANCE GROUP
Apr 23, 2025A00292$0UPDATING OVERTIME PREMIUM CLAUSE VALUE
Apr 17, 2025A00291$0GENERATION 2 POWER CONVERSION MODULE LOCAL CONTROL PANEL UPGRADE
Apr 16, 2025A00290$0DIVERT OUTER STRUCTURE OUTER DIAMETER REFERENCE CELL AND ANODE CABLE ASSEMBLIES
Apr 10, 2025A00289$0REVISED BILLING PRICE 4Q24
Apr 9, 2025A00288$117.6KOFF-SHIP CREW BERTHING AND MESSING
Apr 8, 2025A00287$0HIGH PRESSURE DRAIN SYSTEM DRAWING CHANGES
Apr 7, 2025A00286$3.8MINCORPORATE SPECTROSCOPY EQUIPMENT
Apr 1, 2025A00285$0UPDATE WEIGHTS FOR A00232
Mar 14, 2025A00284$0BERTHING DOOR MODIFICATION
Mar 13, 2025A00283$0JANUARY 2025 ESCALATION
Mar 12, 2025A00282$0GOVERNMENT PROPERTY TRANSFER
Mar 11, 2025A00281$0DIVERT HYD SIMPLEX PUMP #1
Mar 6, 2025A00280$463.1KDELETION/CHANGES/ADDITIONS OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS
Mar 3, 2025A00279$97.2KDESIGN DATA REVIEW TEAM, ENGINEERING REPORT INTERNAL, COUNTERMEASURE LAUNCHER HULL INSERT.
Feb 28, 2025A00278$346.9KDESIGN DATA REVIEW TEAM - SHOCK CLEARANCE ISSUE
Feb 26, 2025A00277$0NON-CONDUCTIVE COATING AND LOW SMOKE COATING EARLY IMPLEMENTATION OF SELF COMPONENTS
Feb 20, 2025A00276$1.2MPURCHASE OF PASSIVE LAB ARRAY CABLE ASSY
Feb 13, 2025A00273$0IMPLEMENTS ADDITIVE MANUFACTURING OF TRASH DISPOSAL UNIT LINER
Feb 13, 2025A00274$0JOINT FLEET MAINTENANCE MANUAL REVISION D CHANGE 4
Feb 13, 2025A00275$0BRIDGE ACCESS TRUNK HATCH DIVERSION CHANGE HULL APPLICABILITY
Feb 12, 2025A00272$0DIVERT ELECTRICAL HULL PENETRATOR ASSEMBLY
Feb 4, 2025A00269$0MODIFY STOP BOLT NEW CONSTRUCTION TEST PROCEDURES
Feb 4, 2025A00270$0DIVERT PIGTAIL CABLE ASSEMBLIES
Feb 4, 2025A00271$0DIVERT SHIP CONTROL JOYSTICK DATA CABLES
Jan 30, 2025A00268$0IMPLEMENTATION OF NON-CONDUCTIVE COATINGS
Jan 23, 2025A00266$0DELETION/CHANGES/ADDITIONS OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS
Jan 23, 2025A00267$0CHANGE TO A00248
Jan 22, 2025A00265$0GOVERNMENT PROPERTY TRANSFER
Jan 21, 2025A00264$1.5MBUOYANT CABLE ANTENNA HANDLING SYSTEM UPGRADES
Jan 15, 2025A00263$0EARLY IMPLEMENTATION OF CAPSTAN NON-CONDUCTIVE COATING AND LOW SMOKE COATING
Jan 7, 2025P00058$188.0MSSN 804 CONSTRUCTION (BOAT 1, FY20)
Dec 30, 2024A00262$0DIVERT CHIN ARRAY PROJECTOR CABLING
Dec 20, 2024A00260$2.8MPROCURE SERVOVALVES
Dec 20, 2024A00261$0MAIN PROPULSION UNIT PROPULSION TURBINE THROTTLE CONTROL TESTING PHASE 1 AND PHASE 2
Dec 19, 2024A00257$6.8MLIMITS TO WELD BUILDUP
Dec 19, 2024A00258$0DIVERT VIRGINIA PAYLOAD TUBE CABLING
Dec 19, 2024A00259$0DAMAGE CONTROL CONEX BOXES
Dec 12, 2024A00255$0DIVERT SECONDARY PROPULSION UNIT (SPU) CABLE TENSIONING DEVICE
Dec 9, 2024A00254$03RD QUARTER 2024 REVISED BILLING
Dec 5, 2024P00057$0SSN 804 CONSTRUCTION (BOAT 1, FY20)
Dec 4, 2024A00253$0DELETION/CHANGES/ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE OBRP
Nov 27, 2024A00252$0AIR PARTICLE DETECTOR REMOVAL
Nov 26, 2024A00251$0DIVERT WEAPONS HOIST ENCODER
Nov 5, 2024A00250$330.8KHIGH PRESSURE AIR COMPRESSOR DRIP TRAY REPLACEMENT
Nov 4, 2024A00248$64.1KDELETION/CHANGES/ADDITIONS OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS (LETTER #90)
Nov 4, 2024A00249$0ADMINISTRATIVE MODIFICATION TO CORRECT ERROR
Nov 4, 2024AZ0007$271.2KPROCURE RHEOSTAT PLATE ASSEMBLIES
Oct 29, 2024A00246$0ADMINISTRATIVE MODIFICATION TO CORRECT A00243
Oct 29, 2024A00247$89.5KREPLACE MAIN SEA WATER VALVE
Oct 28, 2024A00245$371.5KRUDDER WORK
Oct 25, 2024A00244$0DELETION/CHANGES/ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS
Oct 24, 2024A00243$562.4KREVERSE OSMOSIS BRINE DISCHARGE RELIEF VALVE AND INLET PIPING DESIGN CHANGE
Oct 23, 2024A00242$155.4KOFF-SHIP CREW BERTHING AND MESSING FACILITY
Oct 16, 2024A00241$4.1MTHIN LINE TOWED ARRAY HANDLING SYSTEM OUTBOARD SIGNAL PATH UPGRADE
Oct 16, 2024P00056$6.9MSSN 804 CONSTRUCTION (BOAT 1, FY20)
Oct 15, 2024A00240$0DIVERT FLUID FLOW RESTRICTOR
Oct 10, 2024A00238$0DIVERT LINEAR TRANSDUCER
Oct 10, 2024A00239$0ADMINISTRATIVE MODIFICATION TO A00206
Oct 8, 2024P00055$658.5MSSN 804 CONSTRUCTION (BOAT 1, FY20)
Oct 7, 2024A00237$16.0KEMERGENCY DIESEL GENERATOR TROUBLESHOOTING LAPTOP OBSOLESCENCE
Sep 25, 2024A00236$0CABINET VENDOR UPGRADE AND RETROFIT
Sep 19, 2024A00235$123.8KPOTASSIUM CHROMATE SOLUTION RE-USE
Sep 13, 2024A00234$0DIVERTING CIRCUIT CONNECTORS
Sep 12, 2024A00233$02ND QUARTER 2024 REVISED BILLING
Aug 30, 2024A00232$393.3KADDITIONAL CATHODIC PROTECTION IN THE MUD TANKS.
Aug 28, 2024P00054$0SSN 804 CONSTRUCTION (BOAT 1, FY20)
Aug 22, 2024A00231$0GOVERNMENT PROPERTY TRANSFER
Aug 15, 2024A00230$0DELETION/CHANGES/ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS
Aug 2, 2024A00229$3.4MDESIGN DATA REVIEW TEAM ENGINEERING REPORT WEAPON LAUNCH CONSOLE REDESIGN
Jul 31, 2024A00228$0RELEASE OF CLAIMS
Jul 29, 2024A00227$0IMPLEMENTS SEVEN ADMINISTRATIVE SPECIFICATION CHANGE PROPOSALS
Jul 17, 2024A00226$275.6KWEAPONS SHIPPING TRUNK SPRINGS
Jul 10, 2024A00224$456.8KPROCURE NON-CONDUCTIVE COATING (NCC) UPGRADED CAPSTAN MATERIALS
Jul 10, 2024A00225$199.2KPROPULSION TURBINE THROTTLE CONTROL CABINETS TESTING
Jul 3, 2024A00223$29.6KCHANGE TO MAIN COOLANT-3 TEST PROCEDURE AND CONTROL DRIVE MECHANISM TECHNICAL MANUAL
Jul 1, 2024A00222$0RECORD COMPENSATION ADJUSTMENTS THROUGH APRIL 2024
Jun 26, 2024P00053$4.6MSSN 804 CONSTRUCTION (BOAT 1, FY20)
Jun 17, 2024A00221$01ST QUARTER 2024 REVISED BILLING
Jun 5, 2024A00220$0ESTABLISH PROCESS FOR SHIP FORCE WORK CONTROLS DURING NEW CONSTRUCTION
May 31, 2024A00219$0MIDBLOCK INSERTION, VIRGINIA FORWARD BULKHEAD MODIFICATIONS
May 9, 2024A00218$0GOVERNMENT PROPERTY TRANSFER
Apr 25, 2024A00217$0IMPLEMENTS REQUIRED STRUCTURAL FOUNDATION CHANGES
Apr 24, 2024A00216$7.9KMATERIAL DIVERSION SHIPPING COST
Apr 22, 2024A00213$0PURCHASE LONG LEAD TIME MATERIAL TO SUPPORT COMMON WEAPON LAUNCHER
Apr 22, 2024A00214$0DIVERT MATERIAL FOR GOVERNMENT USE.
Apr 22, 2024A00215$0ADMINISTRATIVE MODIFICATION TO ADD UNPRICED CONTRACT ACTION MODIFICATIONS AND A WEIGHT STATEMENT RESULT
Apr 16, 2024A00212$335.0KADDITIONAL SHIP SYSTEM TURBINE GENERATOR TESTING PHASE 1
Apr 12, 2024A00210$0DELETION/CHANGES ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS
Apr 12, 2024A00211$0DELETION/CHANGES/ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS
Apr 11, 2024A00209$0DELETION/CHANGES/ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS (LETTER #116)
Apr 10, 2024A00208$0DIVERT THIN LINE TOWED ARRAY OUTBOARD SENSOR ASSEMBLY
Apr 9, 2024A00207$0AUTHORIZES DIVERSION OF CABLES FOR GOV'T USE.
Apr 5, 2024A00206$164.0KPROCURE MICROPROCESSOR BOARDS
Apr 4, 2024A00205$04TH QUARTER 2023 REVISED BILLING
Apr 3, 2024A00204$118.9KVIRGINIA CLASS OFF-SHIP CREW BERTHING AND MESSING FACILITIES
Apr 1, 2024AZ0006$270.4KPROCURE RHEOSTAT PLATE ASSEMBLIES
Mar 27, 2024A00202$0DELETION/CHANGES/ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS
Mar 27, 2024A00203$0OCTOBER 2023 ESCALATION
Mar 26, 2024A00201$262.1KPROCUREMENT OF BLOCK FIVE CONSTRUCTION SPARES FOR SHIP SYSTEM TURBINE GENERATOR INSULATED-GATE BIPOLAR TRANSISTORS
Mar 25, 2024A00198$0ADD/DELETE STOWAGE REQUIREMENTS
Mar 25, 2024A00199$0MATERIAL DIVERSION FOR GOVERNMENT USE.
Mar 25, 2024A00200$0DELETION/CHANGES/ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS
Mar 22, 2024A00197$0MODIFY STOP BOLT NEW CONSTRUCTION TEST PROCEDURES

Estimated positioning window

Jun 2, 2035 – Dec 2, 2035

Recompete signal:
50/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 50/100. Available recorded signals: 45 points.

Contract end 2036-06-02 (3501 days from calculation)
+5 points
11 historical awards in this buyer and category group
+15 points
453 recorded award transactions
+10 points
Latest award action: 2026-06-02
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.