Federal contract award

N0002418C2300

CONSTRUCTION OF LCS FLIGHT 0+ SHIP

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeSUP OF SHIPBUILDING CONV AND REPAIR
NAICS336611 — Ship Building and Repairing
PSC1905 — Combat Ships and Landing Vessels
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIXED PRICE INCENTIVE
Obligations$1.6B
Current contract value$2.1B
Potential contract value / ceiling$2.2B
Start dateOct 6, 2017
Current end dateApr 30, 2027
Potential end dateApr 30, 2027
Latest award activityMay 14, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 247 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 11, 2026P00099$941.9KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
May 14, 2026A00145$6.8MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
May 11, 2026A00144$0LCS 27-31 POOL NEGOTIATIONS
May 4, 2026P00098$950.0KINCREMENTAL FUNDING
Apr 13, 2026A00142$04Q25 REVISED BILLING
Apr 13, 2026A00143$0BOFOR ORDER POP EXTENSION
Apr 2, 2026P00097$2.9MLCS 27 AND LCS 29 POST DELIVERY INCREMENTAL FUNDING COST ONLY
Feb 19, 2026P00096$1.2MLCS 31 IPDA FUNDING
Feb 12, 2026A00141$0RFDS 662, 663, 736, 746, 753, AND 781
Jan 30, 2026P00095$3.2MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Jan 26, 2026A00140$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Dec 22, 2025P00094$2.8MCOST ONLY WARRANTY-RELATED FUNDING
Nov 18, 2025P00093$460.0KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Nov 5, 2025P00092$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Oct 28, 2025A00139$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Oct 20, 2025P00091$990.0KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Sep 29, 2025P00090$2.2MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Sep 23, 2025P00089$880.1KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Sep 16, 2025A00138$13.4MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Sep 16, 2025P00088$2.1MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Aug 19, 2025P00087$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Aug 15, 2025P00086$2.9MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Aug 4, 2025A00137$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Jul 22, 2025P00085$2.3MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Jun 26, 2025A00136$14.6MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Jun 10, 2025P00084$325.0KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
May 22, 2025P00083$1.6MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
May 19, 2025A00135$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
May 6, 2025A00134$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
May 1, 2025P00082$2.3MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Apr 30, 2025A00132$6.4MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Apr 30, 2025A00133$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Apr 28, 2025P00081$960.3KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Apr 3, 2025A00131$1.1MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Mar 31, 2025A00130$12.0MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Feb 27, 2025P00080$181.0KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Feb 20, 2025A00129$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Jan 30, 2025A00128$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Jan 14, 2025A00127$-342.3KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Dec 18, 2024P00079$3.0MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Dec 3, 2024P00078$2.8MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Oct 28, 2024P00077$294.6KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Sep 27, 2024A00126$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Sep 23, 2024A00125$2.0MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Sep 4, 2024P00076$200.0KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Aug 7, 2024P00075$-884.4KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Jul 31, 2024P00074$5.2MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Jul 22, 2024A00124$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Jul 15, 2024A00123$8.1MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Jul 1, 2024P00073$1.4MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Jun 4, 2024A00122$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
May 24, 2024P00072$3.6MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Apr 11, 2024A00121$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Apr 2, 2024A00120$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Mar 27, 2024P00071$4.8MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Feb 21, 2024P00070$1.7MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Feb 5, 2024P00069$879.8KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Jan 30, 2024A00119$-34.3KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Jan 11, 2024A00118$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Jan 9, 2024P00068$200.0KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Dec 11, 2023A00117$1.4MRADAR SPARES
Dec 4, 2023P00067$1.9MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Oct 24, 2023P00066$1.0MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Sep 14, 2023A00116$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Sep 1, 2023P00065$6.0MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Aug 29, 2023A00115$125.0KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Aug 22, 2023A00114$95.6KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Aug 1, 2023A00113$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Jul 24, 2023A00112$1.0MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Jul 11, 2023A00111$5.4MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Jul 6, 2023P00064$-2.2MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Jun 2, 2023A00110$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Jun 1, 2023P00063$61.8KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
May 30, 2023A00109$47.7KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
May 16, 2023P00062$3.4MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Apr 25, 2023A00108$642.7KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Apr 21, 2023A00107$13.5KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Apr 20, 2023PZ0001$1.1MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Mar 30, 2023A00106$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Mar 15, 2023P00061$4.3MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Mar 2, 2023A00105$94.6KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Jan 26, 2023A00104$459.6KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Dec 20, 2022P00060$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Dec 12, 2022P00059$11.8KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Dec 9, 2022A00103$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Nov 1, 2022P00058$-4.6MDEOB FOR SLINS 0013AB, 0213AB, AND 0313AB. ESTABLISH AND FUND SLINS 0513AD AND 0515AD
Oct 27, 2022A00102$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Oct 6, 2022ARZ999$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Oct 5, 2022A00101$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Oct 5, 2022P00057$180.8KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Sep 30, 2022P00056$6.1MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Aug 26, 2022P00055$656.3KLCS SIF CONSIDERATION
Aug 2, 2022A00100$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Jul 21, 2022P00054$0LCS CLASS DESIGN SERVICES AND POP EXTENSION MOD.
Jul 14, 2022A00099$125.0KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Jun 23, 2022A00098$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
May 26, 2022P00053$2.8MLCS 27 IPDA CLIN 0003 AND 0005 OPTION EXERCISE.
May 23, 2022A00097$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Apr 15, 2022A00096$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Apr 6, 2022P00052$0SECTION G CORRECTION TO COST CODE FOR SLIN 0413AF
Mar 8, 2022A00095$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Feb 24, 2022A00094$80.0KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Feb 23, 2022P00051$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Feb 9, 2022P00050$125.0KMATERIAL
Jan 18, 2022P00049$131.2KLCS CLASS DESIGN EFFORTS
Jan 3, 2022A00093$71.6KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Dec 21, 2021A00092$0INCORPORATION OF PCW-1441
Dec 21, 2021P00048$6.3MCLASS DESIGN SUPPORT FOR LCS
Dec 16, 2021A00091$03RD QUARTER REVISED BILLING
Nov 17, 2021A00090$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Nov 4, 2021A00089$0POP EXTENSION FOR MATERIAL ORDER
Nov 1, 2021P00047$576.2KLCS CLASS SERVICES
Oct 5, 2021P00046$3.9MEXERCISE OPTION, FUND AND EXTEND POP
Oct 1, 2021A00088$0UPDATE TO BUILD SPEC
Sep 21, 2021A00087$02ND QUARTER REVISED BILLING
Aug 24, 2021A00086$1.5MLCS 29 COSAL ORDER INCREMENT 1.
Jul 29, 2021P00045$261.5KFUNDING ACTIONS FOR CLASS DESIGN AND ENGINEERING SUPPORT
Jul 14, 2021P00044$-30.0KFUNDING ADJUSTMENT
Jul 7, 2021P00043$5.5MLCS CONFIGURATION CHANGES
Jul 1, 2021A00085$0BSCN 085
Jun 21, 2021A00084$98.5KLCS 27 COSAL INC 2
May 25, 2021P00042$717.1KCLASS DESIGN SERVICES FUNDING
May 20, 2021A00083$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
May 12, 2021A00082$0RFD 607
May 3, 2021P00041$1.2MCONFIGURATION MANAGEMENT CHANGES
Apr 30, 2021A00081$0PCW-1433
Apr 19, 2021A00080$0CY20 EPA
Apr 14, 2021A00079$0RFD 535A, 603
Apr 9, 2021A00078$0PCW-1431
Apr 8, 2021A00077$215.6KPCW-1119R5
Apr 7, 2021A00076$0PCW-1387
Apr 6, 2021A00075$269.8KPCW-1401
Mar 10, 2021A00074$0PCW-1424
Mar 2, 2021P00040$0ADMINISTRATIVE UPDATE TO STATEMENT OF WORK
Feb 10, 2021A00073$04TH QUARTER 2020 REVISED BILLING
Feb 3, 2021A00072$441.9KLCS 27 COSAL INC 1
Feb 2, 2021A00071$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Jan 25, 2021A00069$0FULLY PRICE AND IMPLEMENT PCW-1422
Jan 25, 2021A00070$0PCW-1395 BUILD SPEC UPDATE 27AF
Jan 14, 2021A00067$0RFD-593
Jan 14, 2021A00068$0FULLY IMPLEMENT RFD 591 AND 592.
Jan 14, 2021P00039$1.4MFUNDING FOR LCS CLASS DESIGN EFFORTS
Jan 13, 2021A00065$0PCW-1381
Jan 13, 2021A00066$0RFD 598
Dec 18, 2020A00064$160.8KPCW-1371
Dec 10, 2020A00062$0RFD 556
Dec 10, 2020A00063$0PCW-1412
Nov 24, 2020P00038$0UPDATE PERIODS OF PERFORMANCE FOR CLASS DESIGN SERVICES
Nov 20, 2020A00060$03RD QUARTER 2020 REVISED BILLING
Nov 20, 2020A00061$17.6KFULLY FUND AND IMPLEMENT PCW-1375
Oct 21, 2020A00059$0CHANGE ACO ON CONTRACT
Oct 13, 2020A00058$2.0MPCW-1315R1
Oct 6, 2020P00037$13.1MOPTION EXERCISE FOR LCS CLASS DESIGN SERVICES
Oct 1, 2020A00057$3.6MPCW-1325R1, GAP CHANGE FOR 27AF
Sep 16, 2020A00056$0RFD-568
Sep 14, 2020A00055$3.4MPCW-1366R2
Sep 11, 2020A00054$02Q20 REVISED BILLING
Sep 9, 2020A00053$6.4KPCW-1212R1
Aug 25, 2020A00052$0PCW 1314C2
Aug 20, 2020A00051$0PCW-1405R1
Aug 20, 2020P00036$1.7MENGINEERING EFFORTS
Aug 13, 2020A00050$9.0KPCW-1378
Aug 11, 2020A00049$-8.9KPCW-1335 AND UPDATED MAKE OR BUY PLAN
Aug 10, 2020P00035$-288.0KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Jul 30, 2020A00048$-6.3KRFDS 544 AND 545
Jul 1, 2020A00047$-313.8KCHANGE ORDER FOR THE OPTIMIZED STERN RAMP FOR LCS 27, 29, 31.
Jun 11, 2020A00046$-88.9KPCWS 1216 AND 1334
Jun 10, 2020A00045$907.5KENGINEERING CHANGE ORDER FOR OPTIMIZED STERN RAMPS.
May 19, 2020P00034$375.0KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Apr 30, 2020A00044$01ST QUARTER 2020 REVISED BILLING PRICE
Apr 15, 2020A00042$29.5KINCORPORATION OF PCW-1347
Apr 15, 2020A00043$-51.0KPCW-1333 FOR LCS-27AF
Mar 19, 2020A00041$-3.2KMULTIPLE DEVIATIONS
Mar 11, 2020A00040$-1.5MONR FUNDING DE-OBLIGATION
Mar 11, 2020P00033$300.0KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Mar 3, 2020P00032$450.0KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Feb 28, 2020A00039$658.6KPCW-1249
Feb 27, 2020A00038$0RFD-523
Feb 26, 2020P00031$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Feb 6, 2020A00037$04Q19 REVISED BILLING
Jan 23, 2020A00036$1.5MLASER FUNDING
Jan 23, 2020P00030$450.0KTHE PURPOSE OF THIS MODIFICATION IS TO: - REVISE SECTION F TO MODIFY THE PERIOD OF PERFORMANCE FOR SLIN 0113AL, 0113AP, AND 0113AQ TO 14 APR 2020 - DEOBLIGATE FUNDING FROM 0113AH - CREATE AND FUND 0213AE
Jan 8, 2020P00029$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Dec 23, 2019A00035$0ONR LASER FUNDING REALIGNMENT
Dec 20, 2019A00034$03RD QTR 2019 REVISED BILLING
Dec 17, 2019P00028$200.0KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Nov 14, 2019A00033$04Q19 BSCN/CACN PACKAGE
Nov 5, 2019P00027$7.5MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Nov 1, 2019A00032$1.8MONR LASER FUNDING MOD
Oct 28, 2019A00031$17.7KPCW-1332C1, OVERFLOW TANK ALARM CHANGES
Oct 24, 2019A00030$0PCW-1326C2 REDEFINE MPCMS PROPULSION CONTROL FOR LCS-27AF.
Oct 4, 2019P00026$7.1MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Sep 26, 2019A00029$1.3MONR FUNDING FOR LASER
Sep 26, 2019P00025$1.1MCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Sep 19, 2019A00027$2.5MFY18 STERN RAMP PROCUREMENT
Sep 19, 2019A00028$100.9KPCW 1196R1 TCDL SYSTEM CHANGE TO MST FOR LCS-25
Sep 18, 2019P00023$0CONSTRUCTION OF LCS FLIGHT 0+ SHIP
Sep 18, 2019P00024$80.0KCONSTRUCTION OF LCS FLIGHT 0+ SHIP
Sep 13, 2019A00026$02Q19 REVISED BILLING
Sep 3, 2019P00022$250.0KCONSTRUCTION OF LCS FLIGHT 0+ SHIP

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2027-04-30 (187 days from calculation)
+35 points
36 historical awards in this buyer and category group
+15 points
247 recorded award transactions
+10 points
Latest award action: 2026-05-14
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.