Federal contract award

N0002418C4314

USS BOISE (SSN 764) PLANNING

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeSUP OF SHIPBUILDING CONV AND REPAIR
NAICS336611 — Ship Building and Repairing
PSC1905 — Combat Ships and Landing Vessels
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$1.1B
Current contract value$1.7B
Potential contract value / ceiling$1.8B
Start dateOct 16, 2017
Current end dateSep 30, 2029
Potential end dateSep 30, 2029
Latest award activityMay 11, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 160 of 160 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 11, 2026A00123$0USS BOISE (SSN 764) ENGINEERING OVERHAUL EXECUTION ADDING ATTACHMENT 48.
May 11, 2026A00122$0USS BOISE (SSN 764) ENGINEERING OVERHAUL EXECUTION MATERIAL TRANSFER TO FACILITIES USE CONTRACT N62793-22-C-0002
Mar 31, 2026A00121$0USS BOISE (SSN 764) ENGINEERING OVERHAUL EXECUTION TO AUTHORIZE SERIAL CHANGE 330, AND UPDATE THE APPROVAL DATE FOR THE SMALL BUSINESS SUBCONTRACTING PLAN.
Mar 26, 2026A00120$0USS BOISE (SSN 764) ENGINEERING OVERHAUL (EOH) EXECUTION ADJUDICATION MODIFICATION FOR GROWTH POOL CHANGES 01 MARCH 2026 - 21 MARCH 2026
Mar 23, 2026A00119$0USS BOISE (SSN 764) ENGINEERING OVERHAUL EXECUTION TO AUTHORIZE SERIAL CHANGE 329.
Mar 6, 2026A00118$0USS BOISE (SSN 764) ENGINEERING OVERHAUL (EOH) EXECUTION ADJUDICATION MODIFICATION FOR GROWTH POOL CHANGES 08 FEBRUARY 2026- 28 FEBRUARY 2026.
Feb 13, 2026A00117$0USS BOISE (SSN 764) ENGINEERING OVERHAUL (EOH) EXECUTION ADJUDICATION MODIFICATION FOR GROWTH POOL CHANGES 01 FEBRUARY 2026 - 07 FEBRUARY 2026
Feb 5, 2026P00034$0USS BOISE (SSN 764) EOH EXECUTION
Feb 4, 2026A00116$0USS BOISE (SSN 764) ENGINEERING OVERHAUL (EOH) EXECUTION ADJUDICATION MODIFICATION FOR GROWTH POOL CHANGES 28 DECEMBER 2025- 31 JANUARY 2026
Jan 8, 2026A00115$0USS BOISE (SSN 764)ENGINEERING OVERHAUL EOH EXECUTION ADJUDICATION MODIFICATION FOR GROWTH POOL CHANGES 07 DECEMBER 2025-27 DECEMBER 2025.
Dec 19, 2025P00033$5.0MUSS BOISE (SSN 764) EOH EXECUTION
Dec 9, 2025A00113$0USS BOISE (SSN 764) ENGINEERING OVERHAUL EXECUTION AUTHORIZATION OF FMR 0463.00 FOR SERIAL CHANGE 325
Dec 9, 2025A00114$0USS BOISE (SSN 764) ENGINEERING OVERHAUL EXECUTION ADJUDICATION MODIFICATION FOR GROWTH POOL CHANGES 16 NOVEMBER 2025-06 DECEMBER 2025.
Dec 8, 2025A00112$87.2KUSS BOISE (SSN 764) ENGINEERING OVERHAUL EXECUTION CREATION OF CLINS 0052 AND 0053 FOR AIT SERVICE AND SUPPORT.
Nov 19, 2025A00111$0USS BOISE (SSN 764) EOH EXECUTION ADJUDICATION MODIFICATION FOR GROWTH POOL CHANGES 02 NOVEMBER 2025- 15 NOVEMBER 2025.
Nov 7, 2025A00110$0USS BOISE (SSN 764) ENGINEERING OVERHAUL (EOH) EXECUTION ADJUDICATION MODIFICATION FOR GROWTH POOL CHANGES 19 OCTOBER 2025 - 01 NOVEMBER 2025
Oct 31, 2025A00109$0USS BOISE (SSN 764) EOH EXECUTION AWARD FMR 0422.00 AND CORRECT ALLOTMENT OF FUNDS
Oct 23, 2025A00108$0USS BOISE (SSN 764) ENGINEERING OVERHAUL (EOH) EXECUTION ADJUDICATION MODIFICATION FOR GROWTH POOL CHANGES 14 SEPTEMBER 2025 - 18 OCTOBER 2025
Sep 29, 2025A00107$-601.3KUSS BOISE (SSN 764) ENGINEERING OVERHAUL (EOH) EXECUTION TO AWARD CLIN 0040 FMR 0146.00 (PERFORM UT INSPECTIONS) AND DE-OBLIGATE EXPIRING FUNDING ON CLIN 0012AA.
Sep 24, 2025A00106$0USS BOISE (SSN 764) ENGINEERING OVERHAUL (EOH) EXECUTION ADJUDICATION MODIFICATION FOR GROWTH POOL CHANGES 07 SEPTEMBER 2025 - 13 SEPTEMBER 2025
Sep 17, 2025A00105$0USS BOISE (SSN 764) EOH EXECUTION ADJUDICATION OF THE AUTHORIZED AND NEGOTIATED FMRS FOR THE PERIOD OF 17 AUG 2025-06 SEPT 2025 THAT HAVE BEEN MUTUALLY AGREED TO DATE.
Sep 15, 2025P00032$17.3MUSS BOISE (SSN 764) EOH EXECUTION
Sep 10, 2025A00104$-12.5MUSS BOISE (SSN 764) ENGINEERED OVERHAUL EXECUTION - DE-OBLIGATION OF CANCELLING FUNDS FROM CONTRACT LINE ITEM NUMBERS 0033 AND 0035
Sep 2, 2025A00103$3.5MUSS BOISE (SSN 764) ENGINEERED OVERHAUL EXECUTION - AWARD FMRS 0148.00, 0152.00, 4314.52, AND 0374.00 SERIAL CHANGE 322, UPDATE CONTRACT TYPE FOR CLIN0040 SLIN 13, AND ADMINISTRATIVELY CHANGE THE PERIOD OF PERFORMANCE ON CLIN 0044
Aug 20, 2025A00102$0USS BOISE (SSN 764) ENGINEERING OVERHAUL (EOH) EXECUTION ADJUDICATION MODIFICATION FOR GROWTH POOL CHANGES 20 JULY 2025 - 16 AUGUST 2025
Jul 28, 2025A00101$0USS BOISE (SSN 764) ENGINEERED OVERHAUL - EXECUTION - AUTHORIZATION OF SERIAL CHANGES 309, 314, 315, 316, 320, AND 321
Jul 24, 2025A00099$0USS BOISE (SSN 764) EOH EXECUTION. ADJUDICATION MODIFICATION FOR GROWTH POOL CHANGES 06 JULY 2025 - 19 JULY 2025
Jul 24, 2025A00100$168.0KUSS BOISE (SSN 764) ENGINEERED OVERHAUL EXECUTION (EOH) AUTHORIZATION FIELD MODIFICATION REQUEST (FMR) 4314-73
Jul 21, 2025A00098$27.3KUSS BOISE (SSN 764) ENGINEERED OVERHAUL EXECUTION AUTHORIZATION FIELD MODIFICATION REQUESTS (FMRS) 0138.00, 0149.00, AND 0165.00
Jul 14, 2025A00097$0USS BOISE (SSN 764) ENGINEERING OVERHAUL (EOH) EXECUTION ADJUDICATION MODIFICATION FOR GROWTH POOL CHANGES 08 JUNE 2025 - 05 JULY 2025
Jul 3, 2025A00096$92.6KUSS BOISE (SSN 764) ENGINEERED OVERHAUL EXECUTION ESTABLISH PRICED CONTRACT LINE ITEM NUMBER (CLIN) 0051 AS A CONTINUATION OF CLIN 0042 FOR ALTERATION INSTALLATION TEAM SERVICE AND SUPPORT.
Jun 25, 2025A00095$36.4KUSS BOISE (SSN 764) ENGINEERED OVERHAUL - EXECUTION REALIGN PREVIOUSLY DE-OBLIGATED FUNDS FROM 0042CA, 0042CB, 0042CC, AND 0042CD TO A PRICED CONTRACT LINE ITEM 0050 FOR ACCOUNTING PURPOSES WITH ALTERATION INSTALLATION TEAM WORK.
Jun 23, 2025A00094$0USS BOISE (SSN 764) ENGINEERED OVERHAUL - EXECUTION - AWARD FIELD MODIFICATION REQUEST 0129.00 SERIAL CHANGE 229
Jun 20, 2025A00093$0USS BOISE (SSN 764) ENGINEERING OVERHAUL (EOH) EXECUTION ADJUDICATION MODIFICATION FOR GROWTH POOL CHANGES 18 MAY 2025 - 07 JUNE 2025
Jun 12, 2025A00092$25.5KUSS BOISE (SSN 764) ENGINEERED OVERHAUL EXECUTION - AWARD FIELD MODIFICATION REQUEST (FMR) 0207.00
Jun 6, 2025A00091$0USS BOISE (SSN 764) ENGINEERED OVERHAUL - EXECUTION - AWARD FIELD MODIFICATION REQUEST 0326.00 SERIAL CHANGE 318
Jun 4, 2025A00090$-36.4KUSS BOISE (SSN 764) ENGINEERED OVERHAUL (EOH) EXECUTION DE-OBLIGATION OF SUBCONTRACT LINE ITEM NUMBERS (SLINS) 0042CA, 0042CB, 0042CC, 0042CD
May 22, 2025A00089$0USS BOISE (SSN 764) ENGINEERING OVERHAUL EXECUTION ADJUDICATION OF AUTHORIZED AND NEGOTIATED FIELD MODIFICATION REQUESTS FOR THE PERIOD OF 05.11.25-05.17.25 THAT HAVE BEEN NEGOTIATED TO DATE.
May 19, 2025A00088$2.0MUSS BOISE (SSN 764) ENGINEERING OVERHAUL (EOH) FIELD MODIFICATION REQUEST (FMR) 0167.00 TRAINING IMPLEMENTATION FOR TESTING
May 14, 2025A00087$0USS BOISE (SSN 764) ENGINEERING OVERHAUL EXECUTION ADJUDICATION OF NEGOTIATED AND AUTHORIZED GROWTH CHANGES FROM 4.13.25-5.10.25.
May 8, 2025P00031$0USS BOISE (SSN 764) EOH EXECUTION
Apr 28, 2025A00086$57.9KUSS BOISE (SSN 764) ENGINEERED OVERHAUL EXECUTION. FUNDING FOR NEW WORK ASSOCIATED WITH FIELD MODIFICATION REQUEST 0166.00 - TRAINING IMPLEMENTATION
Apr 24, 2025P00030$0USS BOISE (SSN 764) EOH EXECUTION
Apr 17, 2025A00085$0USS BOISE (SSN 764) ENGINEERED OVERHAUL EXECUTION ADJUDICATION MODIFICATION FOR GROWTH POOL CHANGES 16 MARCH 2025-12 APRIL 2025
Mar 26, 2025A00084$0USS BOISE (SSN 764) ENGINEERING OVERHAUL (EOH) EXECUTION ADJUDICATION MODIFICATION FOR GROWTH POOL CHANGES 09 MARCH 2025 - 15 MARCH 2025.
Mar 20, 2025A00083$10.4KUSS BOISE (SSN 764) ENGINEERING OVERHAUL EXECUTION ESTABLISHING SLIN 0042CD
Mar 17, 2025A00082$0USS BOISE (SSN 764) ENGINEERING OVERHAUL EXECUTION ADJUDICATION MODIFICATION FOR GROWTH POOL CHANGES 23 FEBRUARY 2025- 08 MARCH 2025
Mar 4, 2025A00081$0USS BOISE (SSN 764) ENGINEERING OVERHAUL (EOH) EXECUTION ADJUDICATION MODIFICATION FOR GROWTH POOL CHANGES 09 FEBRUARY 2025 - 22 FEBRUARY 2025
Feb 24, 2025A00080$0USS BOISE (SSN 764) EOH EXECUTION ADJUDICATION MODIFICATION FOR GROWTH POOL CHANGES 26 JANUARY 2025- 08 FEBRUARY 2025
Feb 4, 2025A00079$0USS BOISE (SSN 764) EOH EXECUTION UPDATE TO 8010 CONNEX BOX LANGUAGE UNDER SECTION C- DESCRIPTION/SPECS/WORK STATEMENT TO ASSIGN RESPONSIBILITY TO SHIP'S FORCE.
Feb 3, 2025A00078$0USS BOISE (SSN 764) EOH EXECUTION ADJUDICATION MODIFICATION FOR GROWTH POOL CHANGES 08 DECEMBER 2024- 25 JANUARY 2025
Dec 18, 2024A00077$0USS BOISE (SSN 764) EOH EXECUTION ADJUDICATE THE AUTHORIZED AND NEGOTIATED FMRS FOR THE PERIOD OF 03 NOVEMBER 2024- 07 DECEMBER 2024 THAT HAVE BEEN MUTUALLY AGREED TO DATE.
Dec 13, 2024A00076$31.2KTHE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH SLIN0042BA, 0042CA, 0042CB, 0042CC.
Nov 27, 2024P00029$14.9MUSS BOISE (SSN 764) EOH EXECUTION
Nov 19, 2024A00075$0THE PURPOSE OF THIS MODIFICATION IS TO AWARD FMR 4314-70 FOR THE USS BOISE (SSN 764)
Nov 14, 2024P00028$399.0MUSS BOISE (SSN 764) EOH EXECUTION
Nov 12, 2024A00074$0USS BOISE (SSN 764) EOH EXECUTION ADJUDICATION MODIFICATION FOR GROWTH POOL CHANGES 29 SEPT 2024- 02 NOV 2024
Oct 10, 2024A00073$0USS BOISE (SSN 764) EOH EXECUTION ADMINISTRATIVE MODIFICATION TO CORRECT THE COST AND FEE BREAKDOWN FOR CLIN 0007 THAT WAS COMPLETED ON MODIFICATION A00070
Oct 7, 2024A00072$0USS BOISE (SSN 764) EOH EXECUTION ADJUDICATION MODIFICATION FOR GROWTH POOL CHANGES 11 AUG 2024- 28 SEPT 2024
Sep 23, 2024A00071$31.2KISSUE FUNDING FOR USS BOISE (SSN 764) FMR 4314-53
Sep 9, 2024A00070$1.2MUSS BOISE (SSN 764) EOH EXECUTION CLIN 0007 FUNDING PLUS UP
Aug 28, 2024A00069$0ADMINISTRATIVE UPDATES FOR CLIN 0042 AND MIN AND MAX FEE FOR SSN 764 USS BOISE
Aug 19, 2024A00068$0USS BOISE EOH ADJUDICATION MODIFICATION FOR GROWTH POOL CHANGES 30 JUNE 2024 - 10 AUGUST 2024
Aug 6, 2024AZ0001$1.5MSHIP SHORE FACILITY, USS BOISE (SSN 764) EOH EXECUTION,
Jul 23, 2024A00066$342.6KUSS BOISE(SSN 764) EOH RFP 450/2178 FAIRWATER CONTINGENT MATERIAL (OPTIONS 2 & 4).
Jul 23, 2024A00067$0USS BOISE (SSN 764) EOH EXECUTION - AUTHORIZE FMR 4314-82 ECI NOSIS
Jul 11, 2024A00065$0USS BOISE EOH ADJUDICATION MODIFICATION FOR GROWTH POOL CHANGES 23 FEBRUARY 2024 - 29 JUNE 2024
Jun 5, 2024P00027$14.8MUSS BOISE (SSN 764) EOH EXECUTION
May 16, 2024A00064$3.5MUSS BOISE (SSN 764) EOH EXECUTION INCREASE EXCESS FUNDS ON CLIN 0001
May 1, 2024A00063$0USS BOISE (SSN 764) EOH EXECUTION - AUTHORIZE FMR 4314-56
Apr 26, 2024A00062$-3.6MUSS BOISE (SSN 764) EOH EXECUTION DECREASE EXCESS FUNDS ON CLIN 0003 AND 0005AA.
Apr 16, 2024P00026$212.0MUSS BOISE (SSN 764) EOH EXECUTION
Apr 11, 2024A00061$0USS BOISE (SSN 764) EOH EXECUTION- CHANGE CLIN 0007 DELIVERY DATE TO 30SEP2029, CHANGE CLIN 0008 DELIVERY DATE TO 08JAN2024, CHANGE CLIN 0009 DELIVERY DATE TO 30MAR2026.
Apr 2, 2024A00060$0USS BOISE (SSN 764) EOH EXECUTION- AUTHORIZE FMR 4314-41 AND FMR 4314-42
Feb 27, 2024A00059$7.3MUSS BOISE (SSN 764) EOH EXECUTION - ISSUE UCO FMR 4314-40
Feb 23, 2024P00025$37.2MUSS BOISE (SSN 764) EOH EXECUTION
Dec 22, 2023A00058$0EARLY PRODUCTION PERIOD (EPP) - EXTEND DELIVERY DATE FOR CLINS 0007, 0008, 00009, AND 0035 TO 21 JAN 2024.
Sep 21, 2023A00057$0EARLY PRODUCTION PERIOD (EPP)
Mar 16, 2023P00024$0EARLY PRODUCTION PERIOD (EPP)
Feb 2, 2023A00056$0EARLY PRODUCTION PERIOD (EPP)
Jul 1, 2022P00023$0EARLY PRODUCTION PERIOD (EPP)
Apr 20, 2022A00055$0EARLY PRODUCTION PERIOD (EPP)
Apr 11, 2022P00022$0USS BOISE
Feb 22, 2022A00054$0EARLY PRODUCTION PERIOD (EPP)
Feb 8, 2022A00053$0EARLY PRODUCTION PERIOD (EPP)
Sep 16, 2021P00021$0USS BOISE UPDATE TO THE EARLY PRODUCTION PERIOD (EPP) ATTACHMENT 36
Jul 1, 2021A00052$-2.0MEARLY PRODUCTION PERIOD (EPP). AUTHORIZE AWARD OF CLIN 0001 INCENTIVE.
Jun 2, 2021P00020$0EARLY PRODUCTION PERIOD (EPP)
Feb 19, 2021A00051$0USS BOISE (SSN 764) EOH MATERIAL TRANSFER
Sep 23, 2020A00050$243.3KHQ NON-NUCLEAR ALTERATIONS
Sep 21, 2020P00019$351.8MUSS BOISE ENGINEERED OVERHAUL (EOH)
Sep 15, 2020AB2001$0INCORPORATE CLAUSE
Sep 4, 2020A00049$0USS BOISE (SSN 764) PLANNING
Aug 21, 2020A00048$777.5KUSS BOISE (SSN 764) REA
Aug 13, 2020P00018$0USS BOISE (SSN 764) ENGINEERED OVERHAUL
Jul 20, 2020A00047$0USS BOISE (SSN 764)
Jul 15, 2020A00046$0CORRECT PRICING TABLE.
Jun 26, 2020P00017$22.8MUSS BOISE (SSN 764) EOH PLANNING AND EXECUTION
Jun 19, 2020A00045$250.2KUSS BOISE (SSN 764) AIT ALTERATIONS
Jun 19, 2020P00016$2.0MUSS BOISE (SSN 764) ENGINEERED OVERHAUL
Jun 15, 2020P00015$2.0MUSS BOISE (SSN 764) ENGINEERED OVERHAUL
Jun 5, 2020P00014$2.0MUSS BOISE (SSN 764) EOH PLANNING AND EXECUTION
Jun 1, 2020P00013$2.0MUSS BOISE (SSN 764) EOH PLANNING AND EXECUTION
May 26, 2020P00012$2.0MUSS BOISE (SSN 764) PLANNING AND EXECUTION
May 6, 2020P00011$0USS BOISE (SSN 764) EOH PLANNING AND EXECUTION
Mar 20, 2020A00044$2.7MUSS BOISE (SSN 764) 0012AC EXECUTION
Mar 13, 2020P00010$2.0MUSS BOISE (SSN 764) EOH
Feb 27, 2020P00009$15.0MUSS BOISE (SSN 764) PLANNING
Nov 21, 2019A00043$0USS BOISE (SSN 764) PLANNING
Nov 6, 2019A00042$0USS BOISE (SSN 764) PLANNING
Oct 30, 2019A00041$0USS BOISE (SSN 764) PLANNING
Oct 24, 2019P00008$0USS BOISE (SSN 764) PLANNING
Oct 8, 2019A00040$0USS BOISE (SSN 764) PLANNING
Sep 27, 2019A00039$351.7KUSS BOISE (SSN 764) PLANNING
Sep 18, 2019A00038$5.0MUSS BOISE (SSN 764) PLANNING
Aug 23, 2019A00037$0USS BOISE (SSN 764) PLANNING
Jul 3, 2019A00036$-243.3KUSS BOISE (SSN 764) PLANNING
Jun 20, 2019A00035$3.1MUSS BOISE (SSN 764) PLANNING
Jun 6, 2019A00034$0USS BOISE (SSN 764) PLANNING
May 21, 2019A00033$5.0MUSS BOISE (SSN 764) PLANNING
May 13, 2019P00007$0THE PURPOSE OF THIS MODIFICATION IS TO ADJUST THE DELIVERY/PERIOD OF PERFORMANCE TERMS, AS WELL AS INCENTIVE TERMS TO SUPPORT AN EOH START IN FY20.
Apr 18, 2019A00032$0USS BOISE (SSN 764) PLANNING
Apr 5, 2019A00031$2.3MUSS BOISE (SSN 764) PLANNING
Mar 19, 2019A00030$0USS BOISE (SSN 764) PLANNING
Mar 12, 2019A00029$0USS BOISE (SSN 764) PLANNING
Mar 1, 2019A00028$0USS BOISE (SSN 764) PLANNING
Feb 28, 2019A00026$0USS BOISE (SSN 764) PLANNING
Feb 28, 2019A00027$0USS BOISE (SSN 764) PLANNING
Feb 22, 2019A00025$0USS BOISE (SSN 764) PLANNING
Jan 16, 2019A00024$0USS BOISE (SSN 764) EXTEND POP AND LAST DATE TO EXERCISE OPTIONS, EXTENDS INCENTIVE DATES
Dec 20, 2018A00023$0USS BOISE (SSN 764) PLANNING
Dec 18, 2018A00022$2.0MUSS BOISE (SSN 764) CLIN 0012AB INCREASE
Dec 11, 2018A00021$1.9MUSS BOISE (SSN 764) PLANNING
Dec 3, 2018A00020$5.3KUSS BOISE (SSN 764) PLANNING
Nov 21, 2018A00019$1.9MUSS BOISE (SSN 764) PLANNING
Nov 16, 2018A00018$10.0KUSS BOISE (SSN 764) PLANNING
Nov 2, 2018A00017$2.0MUSS BOISE (SSN 764) PLANNING
Oct 19, 2018A00016$0USS BOISE (SSN 764) PLANNING
Oct 3, 2018A00015$0USS BOISE (SSN 764) PLANNING
Sep 27, 2018A00013$14.2KUSS BOISE (SSN 764) PLANNING
Sep 27, 2018A00014$0USS BOISE (SSN 764) PLANNING
Sep 24, 2018A00012$0USS BOISE (SSN 764) PLANNING
Sep 20, 2018P00006$0USS BOISE (SSN 764) PLANNING
Aug 30, 2018A00011$1.0MUSS BOISE (SSN 764) RE-ALIGN MAN-DAYS&AUTHORIZE FMRS
Aug 29, 2018A00010$10.0MUSS BOISE (SSN 764) NEW WORK PLANNING
Aug 9, 2018A00009$2.5MUSS BOISE (SSN 764) REALIGN WORK TO ACCOMPLISH EARLY START PERIOD
Jul 19, 2018A00008$0USS BOISE (SSN 764)
Jul 17, 2018P00005$0USS BOISE (SSN 764) PLANNING
Jul 12, 2018P00004$0USS BOISE (SSN 764) PLANNING
Jun 15, 2018A00007$9.8MUSS BOISE (SSN 764) EXERCISE OPTION CLIN 0012AB
May 23, 2018A00006$596.6KUSS BOISE (SSN 764) PLANNING; AUTHORIZE&FUND FMR 003
May 17, 2018P00003$0USS BOISE (SSN 764) PLANNING
May 15, 2018A00005$0USS BOISE (SSN 764) INCORPORATE NAVSEA CLAUSE 5252.245-9115; RENT FREE USE OF GOVERNMENT PROPERTY
Apr 4, 2018A00004$200.0KUSS BOISE (SSN 764) EXERCISE OPTION CLIN 0003 FY 18 NEW WORK PLANNING
Mar 28, 2018A00003$540.5KUSS BOISE (SSN 764) PLANNING, EXERCISE OPTION CLIN 0011AA
Mar 23, 2018A00002$356.9KUSS BOISE (SSN 764) PLANNING, EXERCISE&FUND OPTION CLIN 0007; HQ NON-NUC ALTERATIONS
Mar 15, 2018P00002$0USS BOISE (SSN 764) PLANNING
Nov 20, 2017A00001$3.9MUSS BOISE (SSN 764) EXERCISE OPTION CLIN 0008
Nov 20, 2017P00001$0USS BOISE (SSN 764) PLANNING
Oct 16, 20170$59.3MUSS BOISE (SSN 764) PLANNING

Estimated positioning window

Sep 30, 2028 – Mar 30, 2029

Recompete signal:
60/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 60/100. Available recorded signals: 55 points.

Contract end 2029-09-30 (1064 days from calculation)
+15 points
39 historical awards in this buyer and category group
+15 points
160 recorded award transactions
+10 points
Latest award action: 2026-05-11
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.