Federal contract award

N0002419C2125

SUBMARINE PLANNING YARD

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeSUP OF SHIPBUILDING GROTON
NAICS336611 — Ship Building and Repairing
PSC1905 — Combat Ships and Landing Vessels
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$1.4B
Current contract value$1.4B
Potential contract value / ceiling$1.4B
Start dateJul 11, 2019
Current end dateDec 31, 2028
Potential end dateDec 31, 2028
Latest award activityMay 29, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 294 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 29, 2026A00059$0EXTEND END DATE TO PROCURE DIGITAL VOLTAGE REGULATOR SYSTEM
May 21, 2026P00225$-1.4MDEOB MOD
Apr 6, 2026P00224$-3.0MFUNDING DEOB MOD
Feb 23, 2026P00223$0CEILING REALIGNMENT
Jan 29, 2026A00058$0PERIODIC RELEASE OF CLAIMS
Jan 27, 2026A00057$0EXTENSION OF PERIOD OF PERFORMANCE OF THE DIGITAL VOLTAGE REGULATOR SYSTEM.
Oct 28, 2025A00055$0EXTEND PERIOD OF PERFORMANCE OF UPGRADE MATERIAL KITS AND COMPONENT SPARES.
Oct 28, 2025A00056$0PERIOD OF PERFORMANCE EXTENSION OF SWING SET MATERIAL KITS
Sep 30, 2025AZ0010$1.9MVIRGINIA CLASS TECHNICAL INSTRUCTION FOR MATERIAL PROCUREMENT IN SUPPORT OF BACKFITTING CIRCUIT D COMPONENTS
Sep 25, 2025P00222$-500.0KPOP EX & FUNDING
Sep 23, 2025AZ0009$5.2MADJUDICATING PROCUREMENT OF FOUR SHIPSETS OF INTERNAL COMMUNICATION SYSTEMS.
Aug 28, 2025P00221$-1.6MFY21 - OPN (FY20) - PHNSY
Aug 8, 2025AZ0008$1.7MPROCURE FOUR HIGH PRESSURE AIR DEHYDRATORS
Aug 4, 2025P00220$-4.9MDEOBLIGATION
Jul 15, 2025A00054$0RELEASE OF CLAIMS AS OF 30 JUNE 2024
Jul 2, 2025P00219$309.6KCEILING XFER & FUNDING MODIFICATION
May 27, 2025P00218$-1.5MDEOBLIGATION MODIFICATION
May 22, 2025AZ0007$703.0KPROCUREMENT OF SHIP CONTROL BACKFITS
May 15, 2025P00217$-2.1MDEOB MODIFICATION
May 5, 2025P00216$609.0KFUNDING ACTION
May 2, 2025A00052$0PERIOD OF PERFORMANCE EXTENSION ORDER 423AJ1
May 2, 2025A00053$0PERIOD OF PERFORMANCE EXTENSION
Apr 21, 2025A00051$0PERIOD OF PERFORMANCE EXTENSION
Apr 18, 2025P00215$804.5KFUNDING
Apr 14, 2025P00214$-3.0MDEOB
Mar 6, 2025A00050$0ADDED ENGINEERING CHANGE INSTRUCTION TO THE TECHNICAL INSTRUCTION
Mar 6, 2025P00213$678.0KFUNDING ACTION
Jan 28, 2025P00212$-4.3MDEOB AND AMDIN
Dec 13, 2024A00049$886.5KMATERIAL PROCUREMENT IN SUPPORT OF SHIP CONTROL BACKFIT UPGRADE
Dec 10, 2024P00211$1.1MFUNDING MOD
Dec 6, 2024A00048$0RELEASE OF CLAIMS
Dec 2, 2024A00047$3.0MPROCUREMENT OF FOUR VIRGINIA CLASS BLOCK I-III HIGH PRESSURE AIR DEHYDRATORS (HPADS)
Nov 26, 2024P00210$-1.2MDEOB MOD
Sep 30, 2024A00046$3.0MPROCURE SHIPSETS OF SHIP ALTERATION MATERIAL
Sep 25, 2024P00209$-87.8KINC FUNDING & DEOB
Sep 19, 2024AZ0006$7.5MPROCUREMENT OF ROTATABLE POOL MATERIAL SET OF CHILL WATER AND SHIP SERVICE HYDRAULIC PUMPS
Sep 10, 2024P00208$1.5MPOP EX & INC FUNDING
Sep 6, 2024A00045$0PERIOD OF PERFORMANCE EXTENSION
Aug 30, 2024A00044$0RELEASE OF CLAIMS 30 JUN 23
Aug 28, 2024P00207$3.7MINC FUNDING
Aug 20, 2024P00206$7.3MINC FUNDING, CEILING TRANSFER, AND POP EXTENSION
Aug 6, 2024P00205$11.5MINC FUNDING
Jul 30, 2024P00204$33.0MPOP EXT, FUNDING AND CEILING
Jul 25, 2024A00043$16.6MMATERIAL PROCUREMENT IN SUPPORT OF SHIP ALTERATION
Jul 10, 2024P00203$12.8MPOP EXTENSION + FUNDING
Jul 1, 2024P00202$0POP EXTENSION
Jun 21, 2024P00201$8.5MFUNDING MOD
Jun 20, 2024A00042$0HYDRAULIC ACTUATORS FOR VIRGINIA ROTATABLE POOL MATERIAL
Jun 14, 2024P00200$11.4MFUNDING ACTION
Jun 7, 2024AZ0005$1.3MHYDRAULIC ACTUATORS FOR VIRGINIA ROTATABLE POOL MATERIAL
Jun 5, 2024P00199$27.5MFUNDING ACTION
May 17, 2024P00198$11.9MFUNDING ACTION
May 8, 2024P00197$6.7MFUNDING ACTION
May 6, 2024P00196$0PRICING INCREASE FOR BOW DOME EFFORT
Apr 25, 2024P00195$10.6MFUNDING ACTION
Apr 10, 2024P00194$7.9MFUNDING ACTION
Apr 2, 2024P00193$341.9KFUNDING ACTION AND POP EXT OF CLINS
Mar 26, 2024P00192$16.4MFUNDING ACTION
Mar 21, 2024P00191$3.2MFUNDING/CEILING INCREASE
Mar 7, 2024A00041$3.2MPROVIDE ADDITIONAL FUNDING
Feb 12, 2024P00190$77.2KFY21 - OPN (FY20) - PHNSY
Feb 7, 2024A00040$0RELEASE OF CLAIMS 30 JUN 22
Feb 1, 2024P00189$7.3MFUNDING ACTION
Jan 26, 2024A00039$0RELEASE OF CLAIMS
Jan 26, 2024P00188$18.0MFUNDING ACTION
Jan 19, 2024A00038$0HYDRAULIC ACTUATORS FOR VIRGINIA ROTATABLE POOL MATERIAL
Dec 14, 2023P00187$12.3MFUNDING ACTION
Dec 12, 2023P00186$501.1KFUNDING ACTION ONLY
Dec 5, 2023P00185$6.0MFUNDING ACTION
Dec 4, 2023A00037$11.5MROTATABLE POOL MATERIAL PURCHASE FOR FUTURE VIRGINIA REPAIR AVAILABILITIES
Nov 29, 2023A00036$0CHANGE IN DEFINITIZATION SCHEDULE TO ORDER 443CB4
Nov 28, 2023A00035$730.7KPROCURE HYDRAULIC PUMP
Nov 16, 2023P00184$17.3MFUNDING ACTION
Nov 6, 2023A00034$4.8MHYDRAULIC ACTUATORS FOR VIRGINIA ROTATABLE POOL MATERIAL
Oct 31, 2023P00183$7.1MFUNDING ACTION
Oct 19, 2023P00182$2.2MFUNDING ACTION
Oct 17, 2023P00181$898.0KFUNDING ACTION
Oct 6, 2023AZ0004$679.2KDEFINITIZATION OF ORDER 453AB1 WATERBORNE ENCLOSURE
Sep 29, 2023P00180$12.3MFUNDING ACTION
Sep 25, 2023A00033$0MATERIAL FOR IN-SERVICE SYSTEM UPGRADE
Sep 21, 2023P00179$10.2MFUNDING MOD
Sep 13, 2023A00032$0443CB4 DEFINITIZATION SCHEDULE REVISION
Sep 1, 2023P00178$10.6MFUNDING MOD AND POP EXTENSION
Aug 18, 2023P00177$8.2MFUNDING MOD AND POP EXT
Aug 14, 2023A00031$7.8MPROCUREMENT OF CHILL WATER PUMPS AND MOTORS
Aug 4, 2023A00030$4.1MPROCUREMENT OF DIGITAL VOLTAGE REGULATOR SYSTEMS
Jul 31, 2023A00029$982.5KMATERIAL PROCUREMENT OF THE WATERBORNE DECK ENCLOSURE
Jul 28, 2023P00176$19.2MFUNDING MOD
Jul 24, 2023P00175$5.7MFUNDING MOD
Jul 11, 2023P00174$6.7MFUNDING MOD
Jul 6, 2023A00028$0RELEASE OF CLAIMS 31 DEC 2021
Jun 30, 2023P00173$22.2MFUNDING MOD
Jun 13, 2023P00172$6.6MFUNDING MOD
May 31, 2023P00171$-14.1MFUNDING MOD
May 25, 2023A00027$636.1KBOW DOME PROCUREMENT
May 25, 2023AZ0003$1.3MINTERIOR COMMUNICATION SYSTEM BACKFIT KITS
May 16, 2023P00170$10.4MFY23
May 3, 2023A00026$766.5KHYDRAULIC PUMP ROTOR MODIFICATION
Apr 25, 2023P00169$4.3MFUNDING MOD
Apr 6, 2023P00168$7.6MFUNDING ONLY ACTION
Mar 29, 2023P00167$29.5MFUNDING MOD
Mar 16, 2023P00166$21.3MFUNDING MOD
Mar 2, 2023P00165$8.4MFUNDING MOD
Feb 21, 2023P00164$-7.6MFUNDING ACTION
Feb 9, 2023P00163$9.8MFUNDING ACTION
Feb 6, 2023P00162$6.9MFUNDING MOD
Jan 20, 2023P00161$6.0MFUNDING MOD
Jan 9, 2023P00160$4.0MFUNDING MOD
Dec 22, 2022P00159$1.3MFUNDING MOD
Dec 15, 2022P00158$1.6MFY23
Dec 12, 2022P00157$5.3MFUNDING MOD
Dec 9, 2022A00025$778.0KTECHNICAL INSTRUCTION FOR HANDLING MATERIAL PROCUREMENT
Dec 6, 2022P00156$8.1MFUNDING MOD
Nov 17, 2022P00155$3.6MFUNDING MOD
Nov 8, 2022P00154$4.9MFUNDING MOD
Oct 26, 2022P00153$3.4MFUNDING MOD
Oct 19, 2022P00152$8.4MFUNDING MOD
Sep 28, 2022P00151$31.2MFUNDING MOD
Sep 26, 2022A00024$0REPLACING FY21 FUNDS FOR FY20 EXPIRING FUNDS
Sep 26, 2022P00150$1.9MFY23 FUNDING ACTION
Sep 16, 2022P00149$2.9MFUNDING ACTION MOD
Sep 13, 2022A00023$0COST ACCOUNTING STANDARDS CORRECTION
Sep 8, 2022P00148$2.4MFUNDING ACTION MOD
Aug 26, 2022A00022$1.5MFUNDING INCREASE OF LIMITATION OF LIABILITY
Aug 26, 2022P00147$5.9MFUNDING MOD ACTION
Aug 18, 2022A00021$0TRANSFER OF GP
Aug 16, 2022P00146$9.0MFUNDING MOD
Aug 10, 2022P00144$5.5MEXERCISING AN OPTION
Aug 10, 2022P00145$7.0MFUNDING MOD
Aug 1, 2022P00143$7.4MFUNDING MOD
Jul 13, 2022P00142$5.7MFUNDING MOD
Jul 6, 2022P00141$7.5MFUNDING MOD
Jun 28, 2022P00140$14.9MFUNDING ACTION MOD
Jun 24, 2022P00139$12.6MFUNDING MOD
Jun 10, 2022P00138$4.2MFUNDING MOD
Jun 7, 2022P00137$900.0KFUNDING MOD
May 31, 2022P00136$6.2MFUNDING MOD
May 24, 2022P00135$3.5MFUNDING MOD
May 17, 2022P00134$2.1MFUNDING MOD
May 9, 2022P00133$3.7MFUNDING MOD
May 4, 2022P00132$3.7MFY22
Apr 21, 2022P00131$17.2MFUNDING MOD
Apr 18, 2022A00020$0PERIODIC RELEASE OF CLAIMS 30JUN2020
Apr 7, 2022A00019$0PERIODIC RELEASE FOR 31 DEC 2020
Apr 6, 2022P00130$1.8MFUNDING MOD
Apr 1, 2022P00129$2.0MFUNDING MOD
Mar 25, 2022P00128$9.1MFUNDING MODIFICATION
Mar 18, 2022P00127$1.9MFUNDING MOD
Mar 14, 2022P00126$2.7MFUNDING MOD
Mar 4, 2022P00125$1.2MFUNDING MOD
Feb 28, 2022P00124$4.0MFUNDING MOD
Feb 18, 2022P00123$6.3MFUNDING MOD
Feb 11, 2022P00122$2.8MFUNDING MODIFICATION
Feb 8, 2022P00121$147.0KFUNDING MODIFICATION
Feb 7, 2022A00018$1.5MDELIVERY OF SHIPSET #3 DIGITAL VOLTAGE REGULATOR SYSTEM (DVRS)
Jan 31, 2022P00120$5.2MFUNDING MODIFICATION
Jan 24, 2022P00119$2.2MINCREMENTAL FUNDING
Jan 18, 2022P00118$5.7MFUNDING MODIFICATION
Jan 6, 2022P00117$677.2KFY22
Dec 20, 2021P00116$5.7MPMS392 SUBMARINES
Dec 14, 2021P00115$3.6MSUBMARINES PMS392
Dec 10, 2021A00017$3.0MLONG LEAD MATERIAL
Dec 3, 2021P00114$4.7MSUBMARINES PMS392
Nov 19, 2021P00113$14.3MSUBMARINES PMS392
Nov 17, 2021P00112$4.8MSUBMARINES PMS392
Nov 9, 2021P00111$2.2MSUBMARINES
Nov 5, 2021A00016$0GAINING MOD TO RECEIVE GFP FROM N00024-99-C-2900
Oct 28, 2021P00110$6.0MSUBMARINES PMS392
Oct 25, 2021P00109$540.0KSUBMARINES PMS392
Oct 18, 2021P00108$3.9MSUBMARINES PMS392
Sep 29, 2021P00107$5.2MSUBMARINES PMS392
Sep 23, 2021P00106$5.2MSUBMARINES PMS392
Sep 21, 2021A00015$-187.2KDEFINITIZE ORDER 423AJ3 REV B
Sep 21, 2021AZ0002$846.3KDEFINITIZE ORDER 423AJ2
Sep 15, 2021P00105$1.3MSUBMARINES PMS392
Sep 9, 2021A00013$1.3MDEFINITIZE ORDER 423AJ1
Sep 4, 2021P00104$426.9KSUBMARINES PMS392
Aug 30, 2021P00103$1.5MSUBMARINES PMS392
Aug 24, 2021P00102$1.7MSUBMARINES PMS392
Aug 16, 2021P00101$5.8MSUBMARINES PMS392
Aug 12, 2021P00100$7.7MSUBMARINES PMS392
Aug 2, 2021P00099$3.1MPMS392 SUBMARINES
Jul 26, 2021P00098$1.1MSUBMARINES PMS392
Jul 22, 2021P00097$4.2MSUBMARINES PMS392
Jul 21, 2021A00012$91.7KCOST INCREASE ORDER 423AJ3 REV A
Jul 19, 2021P00096$3.3MSUBMARINES PMS392
Jul 7, 2021P00095$12.4MPMS392 SUBMARINES 2410A
Jul 6, 2021A00011$0THE PURPOSE OF THIS MODIFICATION IS TO IMPLEMENT NAVSEA 0400-AD-URM-010 (TAG OUT USERS MANUAL), REV 7, ACN 1/A AND ACN 2/A.
Jun 30, 2021P00094$8.3MSUBMARINES PMS392
Jun 17, 2021P00093$-32.0KPMS392 SUBMARINES
Jun 10, 2021P00092$1.1MSUBMARINES PMS392
May 27, 2021P00091$2.3MSUBMARINES PMS392
May 24, 2021P00090$1.7MPMS392 SUBMARINES
May 18, 2021P00089$2.4MPMS392 SUBMARINES
May 7, 2021P00088$690.6KPMS392 SUBMARINES
May 3, 2021A00010$0GAINING MOD TO RECEIVE GFP FROM N00024-04-C-2100
Apr 29, 2021P00087$4.7MPMS392 SUBMARINES
Apr 28, 2021A00009$529.3KORDER 423AB1 ADJUDICATING MOD
Apr 22, 2021P00086$4.1MPMS392 SUBMARINES
Apr 15, 2021P00085$33.4KFY21 - PMS392

Estimated positioning window

Dec 31, 2027 – Jun 30, 2028

Recompete signal:
60/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 60/100. Available recorded signals: 55 points.

Contract end 2028-12-31 (791 days from calculation)
+15 points
11 historical awards in this buyer and category group
+15 points
294 recorded award transactions
+10 points
Latest award action: 2026-05-29
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.