Federal contract award
N0002420C2120
LEAD YARD SUPPORT
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | SUP OF SHIPBUILDING GROTON |
| NAICS | 336611 — Ship Building and Repairing |
| PSC | 1905 — Combat Ships and Landing Vessels |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $5.0B |
| Current contract value | $6.1B |
| Potential contract value / ceiling | $7.3B |
| Start date | Oct 13, 2019 |
| Current end date | Jun 30, 2028 |
| Potential end date | Jun 30, 2028 |
| Latest award activity | Jun 4, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 200 of 335 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 12, 2026 | A00121 | $0 | THE PERIOD OF PERFORMANCE EXTENSION IS FOR SERVO-VALVE PHASE III |
| Jun 12, 2026 | A00122 | $-660.7K | RISK REDUCTION EFFORTS |
| Jun 4, 2026 | A00120 | $0 | NO-COST PERIOD OF PERFORMANCE (POP) EXTENSION MODIFICATION DUE TO TESTING AND STAND AVAILABILITY WHILE AWAITING THE RESCHEDULED TEST WINDOW. |
| Jun 4, 2026 | P00202 | $458.5M | DEVELOPMENT STUDIES & DESIGN |
| May 21, 2026 | A00119 | $4.0M | DESIGN BOW CONFORMAL ARRAY |
| Apr 24, 2026 | P00201 | $0 | LEAD YARD SUPPORT |
| Apr 15, 2026 | P00200 | $10.0M | LEAD YARD SUPPORT |
| Apr 14, 2026 | P00199 | $39.5M | LEAD YARD SUPPORT |
| Apr 12, 2026 | P00198 | $-10.0M | LEAD YARD SUPPORT |
| Apr 2, 2026 | P00197 | $222.0M | LEAD YARD SUPPORT |
| Mar 19, 2026 | P00196 | $-953.0K | SSW (RDT&E) |
| Feb 28, 2026 | P00195 | $66.0M | SSW (RDT&E) |
| Feb 19, 2026 | P00194 | $0 | SSW (RDT&E) |
| Feb 10, 2026 | A00117 | $0 | THIS ORDER IS TO EXTEND THE PERIOD OF PERFORMANCE FOR THE DESIGN MODIFICATION TO MITIGATE THE 3R DESIGN PHENOMENON ON THE BLOCK V SHIP SERVICE TURBINE GENERATOR (SSTG) SET, MAGNETIC BEARINGS (SPECIFICALLY THE GENERATOR EXCITER END (GEE) BEARING). |
| Feb 10, 2026 | A00118 | $0 | NO COST PERIOD OF PERFORMANCE EXTENSION MODIFICATION FOR THE DESIGN AND QUALIFICATION SUPPORT OF REDESIGNED (CAMS)CONTRACT ADMINISTRATION MANAGEMENT SYSTEM |
| Jan 29, 2026 | A00115 | $0 | RELEASE OF CLAIMS THROUGH DECEMBER 2024 |
| Jan 29, 2026 | A00116 | $0 | NO COST MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE FOR ON SERVO VALVE REDESIGN (PHASE 4). |
| Jan 29, 2026 | P00193 | $43.7M | VCS LEAD YARD SUPPORT |
| Jan 8, 2026 | P00192 | $0 | SSW (RDT&E) |
| Dec 19, 2025 | P00191 | $52.4M | SSW (RDT&E) |
| Dec 15, 2025 | A00114 | $0 | TRANSFER GOVERNMENT FURNISHED PROPERTY FROM N00024-10-C-2118 |
| Dec 10, 2025 | A00113 | $0 | THIS GOVERNMENT PROPERTY GAIN TRANSFER MODIFICATION FOR LETTER 330:SE/1103479/1.0 DATED 9 JUNE 2025 |
| Dec 10, 2025 | P00190 | $75.0M | SSW (RDT&E) |
| Dec 4, 2025 | P00189 | $13.5M | SSW (RDT&E) |
| Nov 7, 2025 | P00188 | $0 | SSW (RDT&E) |
| Nov 5, 2025 | A00112 | $954.6K | CONSTRUCTION DESIGN SUPPORT (CDS) TRANSFER OF EDS CABLE COSTS |
| Nov 4, 2025 | A00110 | $0 | RELEASE OF CLAIMS THROUGH 30 JUNE 2024 |
| Nov 4, 2025 | A00111 | $9.6M | CONSTRUCTION DESIGN SUPPORT (CDS) TRANSFER OF NUFLO COSTS |
| Oct 30, 2025 | P00186 | $0 | SSW (RDT&E) |
| Oct 30, 2025 | P00187 | $9.8M | SSW (RDT&E) |
| Oct 24, 2025 | P00185 | $26.4M | SSW (RDT&E) |
| Oct 21, 2025 | A00109 | $0 | BOW CONFORMAL ARRAY |
| Oct 20, 2025 | P00184 | $-10.3M | SSW (RDT&E) |
| Oct 14, 2025 | P00183 | $0 | SSW (RDT&E) |
| Oct 9, 2025 | A00108 | $0 | BALANCE TESTING FOR RISK REDUCTION |
| Oct 8, 2025 | P00182 | $-12.7M | SSW (RDT&E) |
| Oct 1, 2025 | A00107 | $2.5M | DIESEL GENERATOR QUALIFICATION UNIT CONSTRUCTION |
| Sep 30, 2025 | A00106 | $0 | NO COST PERIOD OF PERFORMANCE EXTENSION FOR SERVO VALVE REDESIGN - MPU QUALIFICATION TESTING OF WORK (PHASE 4.A SUPPLEMENT) |
| Sep 26, 2025 | P00181 | $141.5M | SSW (RDT&E) |
| Sep 18, 2025 | P00180 | $745.6K | SSW (RDT&E) |
| Sep 17, 2025 | A00105 | $52.9K | DIESEL GENERATOR QUALIFICATION UNIT CONSTRUCTION |
| Sep 4, 2025 | P00179 | $-679.8K | SSW (RDT&E) |
| Sep 3, 2025 | P00178 | $13.5M | SSW (RDT&E) |
| Aug 25, 2025 | A00104 | $252.0K | BALANCE TESTING FOR RISK REDUCTION |
| Aug 20, 2025 | A00103 | $1.8M | BALANCE TESTING FOR RISK REDUCTION |
| Aug 18, 2025 | A00102 | $64.9K | DESIGN AND QUALIFICATION SUPPORT - CENTRAL ATMOSPHERE MONITORING SYSTEM |
| Aug 7, 2025 | P00177 | $0 | SSW (RDT&E) |
| Jul 25, 2025 | P00176 | $83.3M | SSW (RDT&E) |
| Jul 21, 2025 | P00175 | $0 | SSW (RDT&E) |
| Jul 14, 2025 | P00174 | $10.1M | SSW (RDT&E) |
| Jul 2, 2025 | P00173 | $59.2M | SSW (RDT&E) |
| Jul 1, 2025 | P00172 | $0 | SSW (RDT&E) |
| Jun 17, 2025 | P00171 | $38.1M | SSW (RDT&E) |
| Jun 3, 2025 | P00170 | $-2.2M | DE-OBLIGATION OF UNUSED FUNDS. |
| May 19, 2025 | A00101 | $0 | PERIOD OF PERFORMANCE EXTENSION REQUEST NO COST |
| May 15, 2025 | P00169 | $0 | SSW (RDT&E) - PARTIAL DEFINITIZATION OF UCA |
| May 5, 2025 | A00099 | $0 | SENSOR REDESIGN |
| May 5, 2025 | A00100 | $0 | VOLTAGE REGULATOR REDESIGN |
| Apr 30, 2025 | P00168 | $42.6M | SSW (RDT&E) |
| Apr 10, 2025 | P00167 | $22.5M | SSW (RDT&E) |
| Apr 2, 2025 | A00098 | $0 | RELEASE OF CLAIMS THROUGH DECEMBER 2023 |
| Apr 1, 2025 | A00096 | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT MODIFICATION A00095 DATED 17 MARCH 2025. |
| Apr 1, 2025 | A00097 | $0 | RELEASE OF CLAIMS THROUGH 30 JUNE 2023 |
| Mar 17, 2025 | A00095 | $1.2M | VOLTAGE REGULATOR REDESIGN. |
| Mar 14, 2025 | P00166 | $107.8M | SSW (RDT&E) |
| Mar 7, 2025 | A00094 | $438.0K | DIESEL GENERATOR QUALIFICATION UNIT - RISK MITIGATION EFFORTS |
| Feb 28, 2025 | P00165 | $14.8M | SSW (RDT&E) ADDITIONAL FY25 MATERIAL PROCUREMENTS |
| Feb 14, 2025 | AZ0013 | $4.1M | SENSOR REDESIGN |
| Feb 11, 2025 | P00164 | $5.8M | SSW (RDT&E) |
| Jan 31, 2025 | P00163 | $25.0M | SSW (RDT&E) |
| Dec 23, 2024 | A00092 | $0 | PERIOD OF PERFORMANCE EXTENSION |
| Dec 20, 2024 | A00091 | $1.7M | DIESEL GENERATOR COST GROWTH AND EXTEND THE PERIOD OF PERFORMANCE |
| Dec 20, 2024 | P00162 | $-19.0K | SSW (RDT&E) |
| Dec 13, 2024 | A00090 | $3.6M | SERVO VALVE QUALIFICATION TESTING |
| Dec 11, 2024 | A00089 | $0 | VOLTAGE REGULATOR REDESIGN. |
| Nov 20, 2024 | P00161 | $759.0K | SSW (RDT&E) |
| Nov 14, 2024 | P00160 | $2.4M | SSW (RDT&E) |
| Nov 13, 2024 | A00088 | $0 | DESIGN AND QUALIFICATION SUPPORT - CENTRAL ATMOSPHERE MONITORING SYSTEM |
| Oct 29, 2024 | P00159 | $123.7M | SSW (RDT&E) |
| Oct 28, 2024 | A00087 | $0 | ORDER 6021 NO COST PERIOD OF PERFORMANCE EXTENSION |
| Oct 25, 2024 | P00158 | $20.4M | FY25 LEVEL OF EFFORT FUNDING |
| Oct 24, 2024 | P00157 | $0 | SSW (RDT&E) |
| Oct 4, 2024 | P00156 | $130.4M | SSW (RDT&E) |
| Sep 27, 2024 | P00155 | $4.0M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Sep 16, 2024 | P00154 | $2.4M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Sep 10, 2024 | P00153 | $10.2M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Aug 28, 2024 | P00152 | $0 | DEVELOPMENT STUDIES & DESIGN SUPPORT - INCREASED LEVEL OF EFFORT UNDER CLIN 4150 (FROM CLIN 3101) |
| Aug 22, 2024 | P00151 | $15.1M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Aug 19, 2024 | P00150 | $-7.1M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Aug 5, 2024 | P00149 | $45.9M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Jul 31, 2024 | P00148 | $-673.4K | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Jul 19, 2024 | AZ0012 | $4.9M | ORDER 6113 ADJUDICATING MODIFICATION - SERVO-VALVE DETAILED DESIGN |
| Jul 18, 2024 | P00147 | $0 | DEVELOPMENT STUDIES & DESIGN SUPPORT - ADDITIONAL REQUIREMENTS IN SUPPORT OF SUBSEA AND SEABED WARFARE MOD VCS |
| Jul 10, 2024 | AZ0011 | $1.3M | ORDER 6116 ADJUDICATING MODIFICATION - DIESEL GENERATOR QUALIFICATION UNIT CONSTRUCTION |
| Jul 1, 2024 | P00146 | $-6.1M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Jun 25, 2024 | P00145 | $73.1M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Jun 18, 2024 | P00144 | $0 | DEVELOPMENT STUDIES & DESIGN SUPPORT. DE-SCOPING OF EXISTING REQUIREMENT |
| Jun 11, 2024 | A00086 | $0 | AGREEMENT FOR GOVERNMENT USE OF CONTRACTOR AIRCRAFT FOR TRAVEL BETWEEN SUPSHIP GROTON AND SUPSHIP NEWPORT NEWS OR WASHINGTON NAVY YARD |
| Jun 10, 2024 | A00085 | $1.7M | COMPONENT, SOFTWARE, AND SYSTEM PRELIMINARY DESIGN. |
| May 29, 2024 | A00084 | $0 | ORDER 6109 PERIOD OF PERFORMANCE EXTENSION |
| May 28, 2024 | P00143 | $0 | DEVELOPMENT STUDIES & DESIGN SUPPORT - ADDITIONAL REQUIREMENT RELATED TO PROGRAM MANAGEMENT SUBTASK TEAM SUBMARINE PROGRAM MANAGER UNIVERSITY |
| May 23, 2024 | A00083 | $0 | EXTENSION FOR PERIOD OF PERFORMANCE |
| May 23, 2024 | P00142 | $60.6M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| May 15, 2024 | P00141 | $-3.4M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| May 10, 2024 | A00082 | $75.0K | FUNDING FOR SERVOVALVE REDESIGN |
| May 1, 2024 | A00081 | $1.5M | COMPONENT, SOFTWARE, AND SYSTEM PRELIMINARY DESIGN |
| Apr 19, 2024 | P00140 | $108.8M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Apr 17, 2024 | P00139 | $0 | DEVELOPMENT STUDIES & DESIGN SUPPORT. DEFINITIZATION OF A UCA EFFORT AND CONTINUATION OF ONGOING EFFORTS. |
| Apr 10, 2024 | P00138 | $1.4M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Apr 9, 2024 | P00137 | $-19.9M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Mar 26, 2024 | A00079 | $1.4M | ORDER 6116 LIMITATION OF LIABILITY INCREASE |
| Mar 26, 2024 | A00080 | $1.0M | COMPONENT, SOFTWARE, AND SYSTEM PRELIMINARY DESIGN. |
| Mar 7, 2024 | A00078 | $373.8K | DESIGN & REDESIGNED CENTRAL ATMOSPHERE MONITORING SYSTEM |
| Mar 6, 2024 | P00136 | $20.2M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Mar 5, 2024 | AZ0010 | $-1.7M | COMMON WEAPON LAUNCHER FOR UNDERSEA DOMINANCE GROUPS |
| Feb 27, 2024 | P00135 | $14.4M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Feb 22, 2024 | AZ0009 | $1.0M | ORDER 6021 LIMITATION OF GOVERNMENT LIABILITY FUNDING INCREASE AND PERIOD OF PERFORMANCE EXTENSION |
| Feb 13, 2024 | A00077 | $-9.7M | ORDER 6110 FUNDING DE-OBLIGATION |
| Feb 9, 2024 | P00134 | $16.2M | DEVELOPMENT STUDIES & DESIGN SUPPORT. INCREASE CLIN 4175 LOE HOURS (FROM CLIN 3101 EXCESS HOURS) |
| Feb 6, 2024 | A00075 | $397.9K | DEFINITIZE CHANGE ORDER FOR THE SERVOVALVE REDESIGN |
| Feb 6, 2024 | A00076 | $0 | NO COST MODIFICATION FOR THE SERVOVALVE PHASE 4A SUPPLEMENT |
| Feb 2, 2024 | P00133 | $-44.4M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Jan 19, 2024 | P00132 | $152.5M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Jan 18, 2024 | A00074 | $1.6M | VOLTAGE REGULATOR REDESIGN. |
| Dec 22, 2023 | P00131 | $6.0M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Dec 20, 2023 | A00073 | $0 | RELEASE OF CLAIMS THROUGH DECEMBER 2022 |
| Dec 14, 2023 | A00072 | $1.2M | AUTHORIZING MODIFICATION FOR VALVE REDESIGN TESTING |
| Dec 12, 2023 | A00071 | $0 | ORDER 6102 PERIOD OF PERFORMANCE EXTENSION |
| Dec 11, 2023 | A00070 | $0 | RELEASE OF CLAIMS MODIFICATION |
| Dec 6, 2023 | P00130 | $13.0M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Nov 7, 2023 | P00129 | $18.0M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Oct 30, 2023 | P00127 | $0 | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Oct 30, 2023 | P00128 | $7.0M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Oct 24, 2023 | AZ0008 | $1.3M | ARRAY REDESIGN. |
| Oct 18, 2023 | P00126 | $71.4M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Oct 11, 2023 | P00125 | $15.0M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Oct 6, 2023 | P00124 | $0 | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Oct 5, 2023 | A00069 | $5.3M | LEAD YARD SUPPORT UNDEFINITIZED CONTRACT ACTION FOR SHIP SERVICE TURBINE GENERATOR SENSOR REDESIGN |
| Oct 3, 2023 | P00123 | $4.1M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Sep 29, 2023 | P00122 | $126.0M | DEVELOPMENT STUDIES & DESIGN SUPPORT |
| Sep 27, 2023 | P00121 | $0 | LEAD YARD SUPPORT |
| Sep 23, 2023 | P00120 | $1.1M | LEAD YARD SUPPORT |
| Sep 21, 2023 | P00119 | $6.8M | LEAD YARD SUPPORT |
| Sep 20, 2023 | P00118 | $-1.8M | LEAD YARD SUPPORT |
| Sep 14, 2023 | A00066 | $0 | ORDER 6108 PERIOD OF PERFORMANCE EXTENSION |
| Sep 14, 2023 | A00067 | $0 | ORDER 6102 PERIOD OF PERFORMANCE EXTENSION |
| Sep 14, 2023 | A00068 | $0 | NO COST PERIOD OF PERFORMANCE INCREASE FOR ORDER 6112 |
| Sep 6, 2023 | A00065 | $2.0M | ORDER 6021 LIMITATION OF GOVERNMENT LIABILITY FUNDING INCREASED TO 50% |
| Aug 24, 2023 | P00117 | $24.9M | LEAD YARD SUPPORT |
| Aug 11, 2023 | P00116 | $1.8M | LEAD YARD SUPPORT |
| Aug 3, 2023 | P00115 | $19.9M | LEAD YARD SUPPORT |
| Jul 24, 2023 | P00114 | $28.8M | LEAD YARD SUPPORT |
| Jul 21, 2023 | A00064 | $0 | PERIODIC RELEASE OF CLAIMS |
| Jul 20, 2023 | A00063 | $0 | ORDER 6104 PERIOD OF PERFORMANCE EXTENSION |
| Jul 17, 2023 | AZ0007 | $1.0M | TASK ORDER FOR VALVE REDESIGN AND QUALIFICATION TESTING |
| Jul 17, 2023 | P00113 | $0 | LEAD YARD SUPPORT |
| Jul 11, 2023 | P00112 | $8.2M | LEAD YARD SUPPORT |
| Jun 30, 2023 | P00111 | $3.3M | LEAD YARD SUPPORT |
| Jun 27, 2023 | P00110 | $0 | LEAD YARD SUPPORT |
| Jun 16, 2023 | A00062 | $0 | THIS MODIFICATION IS FOR THE TRANSFER OF GOVERNMENT FURNISHED PROPERTY ONTO THIS CONTRACT. |
| Jun 15, 2023 | AZ0006 | $4.3M | ADJUDICATING MODIFICATION FOR THE ADDITION OF THE PROPULSION TURBINE THROTTLE CONTROL CUT-OFF VALVE |
| Jun 14, 2023 | P00109 | $39.4M | LEAD YARD SUPPORT - FUNDING AND ADDITIONAL MATERIAL |
| May 12, 2023 | P00108 | $1.5M | LEAD YARD SUPPORT |
| May 9, 2023 | A00061 | $0 | ORDER 6112 PERIOD OF PERFORMANCE EXTENSION |
| May 8, 2023 | A00060 | $3.5M | UNDEFINITIZED CONTRACT ACTION FOR COMPONENT, SOFTWARE AND SYSTEM PRELIMINARY DESIGN. |
| May 4, 2023 | P00107 | $0 | LEAD YARD SUPPORT |
| Apr 24, 2023 | P00106 | $81.3M | LEAD YARD SUPPORT |
| Apr 12, 2023 | A00059 | $0 | ORDER 6104 PERIOD OF PERFORMANCE EXTENSION |
| Apr 11, 2023 | A00058 | $2.8M | UNDEFINITIZED CONTRACT ACTION FOR DIESEL GENERATOR |
| Mar 31, 2023 | A00057 | $0 | ORDER 6108 DIESEL GENERATOR PERIOD OF PERFORMANCE EXTENSION |
| Mar 29, 2023 | A00056 | $1.6M | SERVOVALVE REDESIGN - INCREASE LIMITATION OF GOVERNMENT LIABILITY |
| Mar 29, 2023 | P00105 | $160.4M | LEAD YARD SUPPORT |
| Feb 23, 2023 | P00104 | $122.9M | LEAD YARD SUPPORT |
| Feb 21, 2023 | P00103 | $0 | LEAD YARD SUPPORT |
| Feb 17, 2023 | A00055 | $2.6M | AUTHORIZING MODIFICATION FOR VALVE REDESIGN |
| Feb 9, 2023 | P00101 | $0 | LEAD YARD SUPPORT |
| Jan 30, 2023 | P00100 | $-590.0K | LEAD YARD SUPPORT |
| Jan 13, 2023 | P00099 | $38.7M | LEAD YARD SUPPORT |
| Dec 23, 2022 | P00098 | $2.8M | LEAD YARD SUPPORT |
| Dec 22, 2022 | P00097 | $-1.8M | LEAD YARD SUPPORT |
| Dec 12, 2022 | P00095 | $0 | LEAD YARD SUPPORT |
| Dec 12, 2022 | P00096 | $9.3M | LEAD YARD SUPPORT |
| Nov 22, 2022 | A00054 | $0 | ORDER 6108 PERIOD OF PERFORMANCE EXTENSION |
| Nov 8, 2022 | P00094 | $88.6M | LEAD YARD SUPPORT |
| Oct 25, 2022 | A00053 | $0 | ORDER 6104 PERIOD OF PERFORMANCE EXTENSION |
| Oct 25, 2022 | P00093 | $15.0M | LEAD YARD SUPPORT |
| Oct 24, 2022 | A00052 | $0 | ORDER 6112 PERIOD OF PERFORMANCE EXTENSION |
| Oct 24, 2022 | P00092 | $10.4M | LEAD YARD SUPPORT |
| Oct 21, 2022 | P00091 | $20.8M | LEAD YARD SUPPORT |
| Oct 19, 2022 | A00051 | $0 | DIESEL GENERATOR PERIOD OF PERFORMANCE EXTENSION |
| Oct 13, 2022 | P00090 | $3.7M | LEAD YARD SUPPORT |
| Oct 7, 2022 | P00089 | $0 | LEAD YARD SUPPORT |
| Oct 3, 2022 | P00088 | $27.7M | LEAD YARD SUPPORT |
| Sep 30, 2022 | P00086 | $2.8M | LEAD YARD SUPPORT |
| Sep 30, 2022 | P00087 | $87.2M | LEAD YARD SUPPORT |
| Sep 27, 2022 | A00050 | $0 | JUNE 2021 RELEASE OF CLAIMS |
| Sep 26, 2022 | P00084 | $0 | LEAD YARD SUPPORT |
| Sep 26, 2022 | P00085 | $4.0M | LEAD YARD SUPPORT |
| Sep 12, 2022 | P00083 | $7.0M | LEAD YARD SUPPORT |
| Sep 2, 2022 | A00049 | $500.0K | LEAD YARD SUPPORT COMMON WEAPON LAUNCHER |
Estimated positioning window
Jun 30, 2027 – Dec 30, 2027
70/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 70/100. Available recorded signals: 65 points.
- Contract end 2028-06-30 (607 days from calculation)
- +25 points
- 11 historical awards in this buyer and category group
- +15 points
- 335 recorded award transactions
- +10 points
- Latest award action: 2026-06-04
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.