Federal contract award

N0002420C4312

PLANNING&MATERIAL (O&MN)

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeSUP OF SHIPBUILDING GROTON
NAICS336611 — Ship Building and Repairing
PSC1905 — Combat Ships and Landing Vessels
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$1.4B
Current contract value$1.4B
Potential contract value / ceiling$1.4B
Start dateAug 14, 2020
Current end dateNov 1, 2027
Potential end dateNov 1, 2027
Latest award activityJun 2, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 546 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 10, 2026A00504$0UPDATE ATTACHMENT 16 WITH ALL AUTHORIZED GROWTH WORK THROUGH WEEKENDING JUNE 5, 2026. WORK INCLUDES REINSTALLATION OF INTERFERENCES IN MAIN BALLAST TANK 3B, CORRECTION FOR TEST DEFICIENCIES, HYDRAULIC TEST DEFICIENCIES, COUNTER MEASURE 11 REPAIRS.
Jun 2, 2026A00503$0UPDATE THE AVAILABILITY WORK PACKAGE WITH CHANGES 409-413 WHICH INCLUDES REMOVE, INSPECT AND REINSTALL CAP TO ELBOW UNIONS 29 &30 REPAIR CHILLED STORAGE BOX DEFICIENCIES REPAIR COUNTERMEASURE MANUAL OPERATOR AND PORT VIEWING PERISCOPE.
Jun 1, 2026A00502$0WEEKLY UPDATE TO ATTACHMENT 16 ADDING ALL AUTHORIZED GROWTH WORK THROUGH WEEKENDING 5/29/26. THIS INCLUDES NEGOTIATED WORK FOR THE INSTALLATION OF TEMPORARY TORPEDO TUBES 2 AND 3 AS WELL AS THE MANUFACTURING OF SHIMS WHICH ARE ESSENTIAL TO THIS WORK.
May 26, 2026A00501$0WEEKLY UPDATE TO ATTACHMENT 16 ADDING ALL AUTHORIZED GROWTH THRU WEEK ENDING 5/22/26.INCLUDES TEMPORARY FIRE FIGHTING SKID TESTING, TORPEDO TUBE REPAIRS, CHILL STORAGE DOOR REPLACEMENT, STRUCTURE WELD REPAIRS,STUD REPAIR ON MAIN BALLAST TANK 2B COVER
May 20, 2026A00499$0WEEKLY UPDATE TO ATTACHMENT 16 ADDING ALL AUTHORIZED GROWTH THRU WEEKENDING 5/15/26. INCLUDES REMOVAL OF GREASE LINES AND REINSTALLATION AND TESTING, REPLACE CLAMP HANGARS USING NEWLY SOURCED MATERIAL, REPLACE WORM GEAR AND WORM SHAFT IN VALVE.
May 20, 2026A00500$0UPDATE THE AVAILABILITY WORK PACKAGE WITH CHANGES 407-408 AND TO ADD SUBJECT WORK LINE ITEM 563A01 TO ATTACHMENT 2.
May 18, 2026A00498$0UPDATE SPECIFICATIONS 768.501A AND 768.502A TO INCORPORATE TECHNOLOGY INSERTION 22, AS WELL US UPDATE ALTERATION INSTALLATION TEAM SERVICE AND SUPPORT SHIP WORK LINE ITEM LIST AT NO COST.
May 12, 2026A00497$0WEEKLY UPDATE TO ATTACHMENT 16 REFLECTING ALL AUTHORIZED GROWTH THROUGH WEEKENDING MAY 8,2026. GROWTH INCLUDED STEEL INSPECTION DEFICIENCIES IN MAIN BALLAST TANK 3B AND 4B, HYDRAULIC PUMP TEST DEFICIENCY REPAIRS TO FIX LEAKS DISCOVERED.
May 12, 2026P00042$60.3MUSS HARTFORD (SSN 786) EOH EXECUTION
May 6, 2026A00495$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 01MAY26.PORT HYDRAULIC PUMP INTERFERENCE, FAIRWATER EXTERNAL/INTERNAL MAINTENANCE REQUIREMENT CARD 3 VOID AREA REPAIR, UNRESTRICTED OPERATION WELDS
May 6, 2026A00496$0UPDATING THE AVAILABILITY WORK PACKAGE TO INCLUDE NEW GROWTH WORK IDENTIFIED UNDER CHANGES 401-405
Apr 27, 2026A00493$0UPDATING THE AVAILABILITY WORK PACKAGE TO INCLUDE CHANGES INCLUDED IN SPECIFICATION 768.4070 AND SPECIFICATION 768.4361. CHANGES 374-377, 380-384, AND 400 ARE INCORPORATED AT NO COST TO INCORPORATE TECHNICAL INSERTION-22(TI)-22.
Apr 27, 2026A00494$0UPDATE TO ATTACHMENT 16 CAPTURING ALL GROWTH WORK AUTHORIZED FOR HARTFORD ENGINEERED OVERHAUL THROUGH WEEKENDING APRIL 24,2026 WHICH INCLUDED ADDITIONAL WELD REPAIRS IN MAIN BALLAST TANK 5B, TEST DEFICIENCY REPAIRS, REPLACE MISSING HANGARS
Apr 22, 2026A00492$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 17APRIL26. AMEE BAY PORT RESURFACING OF THE COMMUTATOR SURFACE, ULTRAVIOLET TESTING, MAIN PROPULSION SHAFT, TERMINAL BOX REMOVAL, ENGINEER EVALUATION.
Apr 16, 2026A00491$0REMOVAL OF EXISTING DEFICIENT PORT AND STARBOARD CONDENSATE POTS AND THEN REPLACEMENT WITH NEW POTS.
Apr 13, 2026A00490$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 10APRIL26. SQUARE TUBE REMOVAL GIVEBACK, RECONNECTION AND RE-SPLICING OF MULTIPLE CABLES,MAIN BALLAST TANK 5A, PORT STERN PLANE PINTLE COVER CAP SCREWS.
Apr 8, 2026A00489$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 03APRIL26. VALVE 13 FREEZE SEAL TO SUPPORT REPAIR, BOLT GRADE DEGRADATION REPAIR, STARBOARD SKIN PLATING INTERFERENCE REMOVABLE.
Mar 30, 2026A00488$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 27MARCH26. FORWARD PRESSURE AIR HEADER LEAK, FORWARD TRIM PRESSURE HULL STRUCTURE REPAIR, TRASH ROOM BROKEN SCREW REPLACEMENT, MAIN BALLAST TANK REPAIR.
Mar 24, 2026A00487$0UPDATING THE AVAILABILITY WORK PACKAGE TO INCLUDE "CORRECT CONTACT FLEX HOSES" AS CHANGE 396, "ADJUST FLOATING WIRE ANTENNA" AS CHANGE 397, "REPAIR STEAM GENERATOR 45" AS CHANGE 398, AND "REPAIR PORT HYDRAULIC ACCUMULATOR AIR FLASK #2" AS CHANGE 399.
Mar 23, 2026A00486$0PERIODIC UPDATE TO ATTACHMENT 16/17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 20MARCH26. MAIN BALLAST TANK 4B ,CONDUIT OUT TANK,#1 DUPLEX STRAINER, JOINT WELD GRINDING GIVEBACK,STARBOARD STABILIZER WELD DEFICIENCY REPAIRS.
Mar 19, 2026A00485$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 13MARCH26. ENGINEERING SIGNOFF DEFICIENT HANGER, MISSING DRIP SHIELD, ELECTRIC HULL PLATE GIVEBACK, DRILL TABS, CANCELLATION OF WORK STEPS.
Mar 10, 2026A00483$0UPDATING THE AVAILABILITY WORK PACKAGE ADDING "REPAIR THREADS ON DIFFERENTIAL PRESSURE DETECTOR HIGH AND LOW PRESSURE VENT PORTS" AS CHANGE 393, "REPLACE TRIM/DRAIN VALVE 79" AS CHANGE 394, AND "REPAIR PORT SHIP SERVICE HYDRAULIC PUMP" AS CHANGE 395.
Mar 10, 2026A00484$0PERIODIC UPDATE TO ATTACHMENT 16&17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 06MARCH26. BEARING, INSUFFICIENT CLEARANCE FOR TRANSDUCER POSITIONING SENSORS, PORT SIDE ACCESS CUT, MID LEVEL ENGINE ROOM DAMAGED COPPER PIPING.
Mar 2, 2026A00482$0PERIODIC UPDATE ATTACHMENT 16&17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THRU WEEKENDING 27FEBRUARY26.STARBOARD FORWARD NON-PRESSURE HULL,POPPET HULL VALVE,BEARING RETAINER SHIELD, VALVE STEM OIL LEAKAGE,ENGINEERING EVALUATION FOR LAGGING REINSTALL
Feb 25, 2026A00481$0PERIODIC UPDATE TO ATTACHMENT 16/17 TO ADJUDICATE AUTHORIZED GROWTH THROUGH WEEKENDING 20FEBRUARY26. 9 COUPONS WERE AUTHORIZED FOR INSTALL STUDS,HULL VALVE REPAIR,WELD FORWARD ESCAPE TRUNK HATCH, PANEL REPAIRS, CLEAN AND GROOM VALVES.
Feb 20, 2026A00480$0UPDATING A LINE IN THE AVAILABILITY WORK PACKAGE TO READ "REPACK COOLANT SAMPLING 21" AS CHANGE 392
Feb 17, 2026A00478$0PERIODIC UPDATE TO ATTACHMENT 16&17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 13FEBRUARY26. TILES AND FAIRING STRIPS, MAIN BALLAST TANK 4B GIVEBACK,TILE INCREASE,CABLE AND HANDET REPLACEMENT, HANGER CUT AND REMOVAL, DECKPLATE REPAIR
Feb 17, 2026A00479$0PERIODIC RELEASE OF CLAIMS REPORTING THROUGH 31 DECEMBER 2024.
Feb 9, 2026A00477$0PERIODIC UPDATE ATTACHMENT 16 & 17 TO ADJUDICATE AUTHORIZED GROWTH THRU WEEKENDING 06FEBRUARY26. EXTERIOR PRESSURE HULL STEEL REPAIRS,FAIRING STRIP & A-SHAPE TILE MATERIAL, FORWARD WELD REPAIR, CAB GUARD,TAPER PIN REMOVAL/REINSTALLATION,VALVE LEAK.
Feb 2, 2026A00476$0PERIODIC UPDATE ATTACHMENT 16&17 TO ADJUDICATE AUTHORIZED GROWTH THRU WEEKENDING 30JANUARY26.REPLACEMENT OF BEDPLATE,SONAR DOME REPAIR, SNORKEL OUTERMAST REPAIR,REPLACE HINGED DOOR PANEL,PROCURE MATERIAL TO PLUG VENT HOLES AND INSTALL,REPLACE FILTERS
Jan 30, 2026A00475$622.9KSETTLEMENT OF CONTRACTOR'S CLAIM ARISING FROM DAMAGES INCURRED FROM AN ELECTRICAL FIRE ONBOARD A SUBMARINE WHEREBY BOTH THE CONTRACTOR AND GOVERNMENT SHARED LIABILITY.
Jan 27, 2026A00474$0PERIODIC UPDATE TO ATTACHMENT 16&17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 16JANUARY26. MAIN BALLAST TANKS 1A/2A &1B/2B, STERN DIVE GEAR, MAIN BALLAST TANK 4B CABLERACK GIVEBACK,CUT WELD JOINT, BONNET/STEM SEAT,MISSING PAN COVER.
Jan 26, 2026P00041$708.6KUSS HARTFORD (SSN 786) EOH EXECUTION
Jan 21, 2026A00473$0ADDING AVAILABLE WORK PACKAGE CHANGE 390 AND 391 TO INCLUDE REPAIR OF HIGH-PRESSURE AIR VALVE 71 CONNECTION AND CORRECT DIFFUSER ON VENT SEQUENCE 8, SYSTEM 18.
Jan 20, 2026A00472$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 16JANUARY26. MAIN BALLAST TANKS 1A/2A &1B/2B,STERN DIVE GEAR,MAIN BALLAST TANK 4B CABLE RACK GIVEBACK,CUT WELD JOINT,BONNET/STEM SEAT,MISSING PAN COVER.
Jan 14, 2026A00471$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 09JANUARY26. FORWARD MAIN BALLAST TANK WELD,P5 PIPE TO VALVE FIT UP,FAILED DAMAGED AND MISSING INBOARD CABLES,VALVE SEAT TIGHTNESS PRESSURE DROP TEST.
Jan 8, 2026A00470$0ADDING AVAILABLE WORK PACKAGE CHANGE 389 TO INCLUDE REPAIR OF AIR HIGH PRESSURE(AHP)-49 VALVE.
Jan 6, 2026A00469$0PERIODIC UPDATE ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 2JANUARY26.DIESEL GENERATOR FOR BARGE, SIMPLEX PUMP #2,MAIN BALLAST TANK 3B, FAIRWATER EXTERNAL AND INTERNAL,VENT FANS 2 AND 3,SEAT LOCATING TOOL MEASURE
Dec 22, 2025A00468$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 19DECEMBER25. INSPECTION OF OUTBOARD RECESS ACCESS COVER PLATE, ACCESS PLATE WELD BUILD UP REPAIR, ENGINEERING EVALUATION ON TRIM PUMP STRAINER O-RING.
Dec 15, 2025A00466$0PERIODIC UPDATE TO ATTACHMENT 16&17 ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 12DECEMBER25. CABLES/WIREWAYS INSPECTION GROWTH GIVE BACK,#1 GOVERNOR,TRIM PUMP,FAIRWATER INTERIOR/EXTERIOR,HANGER RUBBER GROMMETS, FEMALE/MALE END BEARINGS.
Dec 15, 2025A00467$0UPDATE THE AVAILABILITY WORK PACKAGE TO INCORPORATE CHANGE 388 TO ADD NOTES "INSPECT COMMON SUBMARINE RADIO ROOM RACK 11 WITH ALTERATION INSTALLATION TEAM TO VERIFY LOCATION OF CABLE 11W102-P102 INSPECT FOR MISSING CONNECTOR(S)
Dec 9, 2025A00465$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE AUTHORIZED GROWTH WEEKS 22NOVEMBER25-05DECEMBER25. WELD REPAIRS TO MAIN BALLAST TANK 4B, WEAPONS TRUNK HATCH WELD REPAIRS,MECHANICAL SEAL REPLACEMENT,STARBOARD STERN DIVE PLANE GRINDING,UPPER RUDDER
Nov 25, 2025A00464$0PERIODIC UPDATE TO ATTACHMENT 16&17 TO ADJUDICATE AUTHORIZED GROWTH THRU WEEKENDING 21NOVEMBER25. 13 COUPONS WERE AUTHORIZED FOR VARIOUS GROWTH ITEMS VALUED UNDER $50,000. MAIN BALLAST TANK 4B,TRIM PUMP SUCTION,DUPLEX STRAINER JUNCTION BOX REPAIRS.
Nov 24, 2025A00463$0UPDATE THE AVAILABILITY WORK PACKAGE TO INCORPORATE CHANGE 387 TO ADD NOTES "CLEAN SYSTEM BETWEEN VALVE AEB-123 TO VALVE MANIFOLD AND REPAIR BROKEN HOSE CONNECTION.
Nov 17, 2025A00462$0PERIODIC UPDATE TO ATTACHMENT 16&17 ADJUDICATE ANY AUTHORIZED GROWTH WORK THRU WEEKENDING 14NOVEMBER25. RABBET2 REPAIR,CENTRAL OIL FILTER REPAIR,MAIN BALLAST TANK 2 WELDING, ELECTRIC HULL PLATING,SAIL EXHAUST LEAVER,JUNCTION BOX, MULTIPURPOSE RECESS.
Nov 10, 2025A00461$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 07NOVEMBER25. FAIRWATER WELD REPAIR,MAIN BALLAST TANK 3A,TORPEDO TUBE RECESS COVE,DRAIN PUMP HOSE,LIGHTING CABLE SPLICING,TILE STUD,ELECTRIC HULL PLATE.
Nov 4, 2025A00460$0PERIODIC UPDATE TO ATTACHMENT 16/17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 31OCTOBER25. MAIN BALLAST TANK 4B, ROPE GUARD GIVEBACK,FLOATING WIRE ANTENNA CONDUIT,VALVE STEM LEAK, FILTER SUMP TANK VALVE LEAK, O-RING GROOVE CORROSION
Oct 31, 2025A00459$0UPDATE THE AVAILABILITY WORK PACKAGE TO INCLUDE CHANGES 373, 379, 385, 386 AND INCLUDE AN UPDATE TO AVAILABILITY WORK PACKAGE CHANGE 310. THESE CHANGES SUPPORT SPACER INSTALL, MULTIPLE VALVE REPAIRS, HYDRAULIC ACTUATOR REPAIR, AND GAGE LINE REPAIR.
Oct 29, 2025A00458$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 24OCT25. OUTER MAST ASSEMBLY, FAIRWATER CONFIGURATION INSTRUCTIONS, SWITCH BULB REPLACEMENT, PORT DIVE PLANE,VALVE SEAT REMEDIATION,EXTERNAL SKIN PLATE
Oct 21, 2025A00457$0PERIODIC UPDATE TO ATTACHMENT 16/17TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 17OCTOBER25. PORTTRIP THROTTLE VALVE, PORT GOVERNOR VALVE, STERN DUPLEX STRAINER #2, PORT AND STARBOARD TUBE ASSEMBLY, MAIN BALLAST TANK 5B,MAST ASSEMBLY.
Oct 14, 2025A00456$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 10OCT25. UNRESTRICTED OPERATIONS ON MAINTENANCE REQUIREMENT CARD 003, #2 DUPLEX STRAINER, SOURCE CONTINGENT MATERIAL, TANK ACCESS LEAK, LOWER RUDDER
Oct 7, 2025A00455$0PERIODIC UPDATE TO ATTACHMENT 16&17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 03OCTOBER25.DUPLEX STRAINER, LOCAL CONTROL,OIL WATER INTERFACE METER, CLAMP/FLAT BAR CORROSION, VALVE BODY THREAD REPAIR, VENTILATION FANS 1&2, MUFFLER
Oct 2, 2025A00454$0INCREASE IN QUANTITY OF HULL INSULATION AND TRANSMISSION LOSS TREATMENT.
Oct 1, 2025A00453$0UPDATE THE AVAILABILITY WORK PACKAGE WITH CHANGES 369-372.
Sep 30, 2025A00452$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 26SEPTEMBER25. ELECTRONIC HULL PLATING, VALVES 29/30 REPAIR, FAIRING COVER REPAIR,VALVE OPERATOR REPAIR,SHAFT COUPLING,PORT/STERN DIVE PLANE,TRIM PUMP.
Sep 29, 2025A00451$928.8KFUNDING FOR A COST OVERRUN ON CONTRACT LINE ITEM 0022 REFLECTED ON CONTRACT LINE ITEM 2222.
Sep 26, 2025A00450$6.5KADDED FUNDING TO CONTRACT LINE ITEM 0018 TO ACCOMPLISH REQUIRED ADDITIONAL SERVICE AND SUPPORT. SPECIFICALLY, GRINDING, PAINTING AND CRANE ASSISTANCE EFFORTS.
Sep 24, 2025A00449$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 19SEPTEMBER25. STERN DIVE PLANE,PORT AND STERN DIVE PLANE, MAIN BALLAST TANK 4B,PORT AND STARBOARD HORIZONTAL STIFFENER GIVEBACK, RABBET REPAIR,VENT FAN
Sep 23, 2025A00448$-284.1KDE-OBLIGATE FUNDING FROM CONTRACT LINE ITEM NUMBER 0007, UPDATE CONTRACT ATTACHMENT 2 TO ADDRESS REALIGNMENT OF SERVICE AND SUPPORT HOURS AS WELL AS NOT TO EXCEED VALUE FOR SERVICE AND SUPPORT HOURS.
Sep 16, 2025A00447$0PERIODIC UPDATE TO ATTACHMENT 16&17 ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 12SEPTEMBER25. STERN DIVE PLANE, MAIN BALLAST TANK 4A, TRIM PUMP SUCTION, SINGLE JACK BOX STATION 8,CENTRAL OIL FILTER, MAIN BALLAST TANK 5A, BOW TANK,MOUNTS
Sep 16, 2025P00040$0USS HARTFORD (SSN 786) EOH EXECUTION
Sep 8, 2025A00446$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 05SEPTEMBER25. DUPLEX STRAINER,HULL INSERTS,MAIN BALLAST TANK 4A,CABLES AND WIRE WAYS, PIPE ALIGNMENT CORRECTION,AFT FAIRING PLATE REPAIR, WELD REPAIRS.
Sep 2, 2025A00444$0UPDATE THE AVAILABILITY WORK PACKAGE TO INCLUDE CHANGES 366 THROUGH 368, AND INCLUDE A SPEC CHANGE FROM AWP CHANGE 356.
Sep 2, 2025A00445$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 29AUGUST25.#1 DUPLEX STRAINER,MAIN BALLAST TANK 5A,PORT THRUSTER GIVEBACK,MAIN BALLAST TANK 3B, #2DUPLEX STRAINER,PUMP #1MOTOR, WINDINGS,HASDAN,BUSHINGS
Aug 26, 2025A00443$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 22AUGUST25. MAIN BALLAST TANK 3B,ROPE GUARD INSTALLATION ASSEMBLY,DRAIN PUMP CABLES,MAIN BALLAST TANK 5B, DECK DRAINS,MOTOR GROUND STUD,BOTTOM ANGLE BAR
Aug 22, 2025A00442$0UPDATE THE AVAILABILITY WORK PACKAGE TO INCLUDE CHANGES 349 THROUGH 365.
Aug 18, 2025A00441$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 15AUGUST25.MAIN BALLAST TANK 3B,MAIN BALLAST TANK 5B,ELECTRO HULL PLATING,CABLEWAY REPAIRS,RABBET REPAIR, HINGED CLEATS,CABLEWAY ANGLE BAR,FAIRING PLATE
Aug 15, 2025A00440$0PERIODIC RELEASE OF CLAIMS THROUGH 30JUNE24
Aug 13, 2025A00439$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 08AUGUST25. 91 CABLE REPLACEMENTS, TEMPORARY PLATE INSTILLATION, LOWER HATCH WELD REPAIR,SHEAR MOUNT PROTRUSION REMEDIATION,ABRASIVE BLAST PAINT REMOVAL
Aug 5, 2025A00437$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 1AUGUST2025. PAWL PEG REPAIR, CIRCUIT BREAKER REPLACEMENT, MAIN BALLAST TANK 3A DEFICIENCY WELD REPAIRS,SYNTACTIC FORM REPLACEMENT,MAIN STEAM 12 REPAIRS
Aug 5, 2025A00438$62.4KADDITIONAL SUPPORT SERVICES REQUIRED FOR THE LOW PRESSURE ELECTROLYZER INSTALLATION.
Jul 30, 2025A00435$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 25JULY25. SOLENOID VALVE ASSEMBLY REPAIR, REMOVAL OF FAN #7, ARCTIC DOOR REPAIR, OIL FILTER REPLACEMENT, DRAIN FLOW METER REPAIR,CABLEWAY INSPECTIONS
Jul 30, 2025A00436$0THIS MODIFICATION UPDATES ATTACHMENT 4B, GOVERNMENT FURNISHED PROPERTY, MICROSOFT EXCEL, THAT WAS NOT INCLUDED IN MODIFICATION A00431.
Jul 30, 2025P00039$152.0MUSS HARTFORD (SSN 786) EOH EXECUTION
Jul 23, 2025A00434$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 18JULY25. GROWTH REPAIRS FOR BRIDGE LOWER HATCH, VALVE ASSEMBLY, MAIN BALLAST TANK 5B, MAIN BALLAST TANK 3A, STERN DIVE PLANE, HULL PENETRATION REPAIR
Jul 21, 2025A00433$0UPDATE THE AVAILABILITY WORK PACKAGE TO INCLUDE CHANGES 343 THROUGH 348.
Jul 16, 2025A00432$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 11JULY25. DUPLEX STRAINER, MAIN SEA WATER VALVE, ROPE GUARD, STARBOARD JOURNAL BEARING, VENTILATION REPAIR,STARBOARD AND PORT STERN PLANE WELD REPAIRS
Jul 11, 2025A00431$0UPDATES ATTACHMENT 7, ASSUMPTIONS CLARIFICATIONS AND EXCEPTIONS UPDATES ATTACHMENT 4A/4B, GOVERNMENT FURNISHED PROPERTY AND UPDATES ATTACHMENT 2, SHIP WORK LINE ITEM NUMBER ALL AT NO COST.
Jul 3, 2025A00430$9.4MADD FUNDING TO INCREASE GROWTH DISCRETE MATERIAL CEILING.
Jun 30, 2025A00429$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 27JUNE25. SAIL BAY CONSTRUCTION, REINSTALL VENTILATION FANS, STERN DIVE PLANE REPAIR, STERN DIVE PLANE GIVEBACK, FAIRWATER, ROPE GUARD ASSEMBLY GIVEBACK
Jun 24, 2025A00427$0UPDATE THE AVAILABILITY WORK PACKAGE TO INCLUDE CHANGES 337 THROUGH 342.
Jun 24, 2025A00428$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 20JUNE25. REPAIRS ON STERN DIVE PLANES, PLATE REPLACEMENT MAIN BALLAST TANK 3B, REMOVAL OF INTERFERENCES FOR VALVE REPAIRS AND FAN REPAIRS, ROPE GUARD
Jun 17, 2025A00426$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 13JUNE25. SERVICE TURBINE GENERATOR, TEST UP & LOW TRANSMITTERS, HULL PENETRATION, DUPLEX STRAINER, OIL FILTER, MAIN BALLAST TANK 3A,RUDDER GIVEBACK,
Jun 13, 2025A00424$0UPDATE THE AVAILABILITY WORK PACKAGE TO INCLUDE CHANGES 329 THROUGH 336.
Jun 13, 2025A00425$0UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE 768.3456 GROWTH WORK FOR WELD REPAIRS IN THE SIDE PASSAGEWAY.
Jun 11, 2025A00423$0INCREASING THE AUTHORIZED NUMBER OF QUANTITIES FOR VIBRATION DAMPENING TILES, HULL INSULATION AND TRANSMISSION LOSS TREATMENT TO BE REPLACED.
Jun 10, 2025A00422$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 06JUNE25. MAIN STEAM 10, THRUSTER BEARINGS INSPECTION, TRIM PUMP INSPECTION, DUPLEX STRAINER, MAIN STEAM 10 PIPING, MAIN BALLAST TANK, STARBOARD BEARING
Jun 3, 2025A00421$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 30MAY25.RESTORE & INSTALL VALVE INTERFERENCES, LUB PUMP, HORIZON STABILIZER PLATE, MAIN BALLAST TANK 2, ELECTRICAL HULL PENETRATOR, POD PORT GIVE-BACK
May 27, 2025A00419$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 23MAY25. REPAIRS OF LUBE OIL STRAINER, DUPLEX STERN, TILES, PIPE REPAIR,MAIN BALLAST TANK 3,ARC FAULT REPAIR,HORIZON STABILIZERS REPAIR, ELECTROPLATING.
May 27, 2025A00420$0UPDATE THE AVAILABILITY WORK PACKAGE WITH CHANGES 319 THROUGH 324.
May 22, 2025A00418$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE AMOUNT OF POINT CHANGE 768.3515 FROM $510,100 TO $51,100, WHICH WAS A TYPO ADJUDICATED ON MODIFICATION A00416.
May 21, 2025A00417$0UPDATE ATTACHMENT 7 (ASSUMPTIONS CLARIFICATIONS EXCEPTIONS) TO INCLUDE #83 REGARDING INDUSTRIAL SHIP SAFETY MANUAL FOR FIRE PREVENTION AND RESPONSE.
May 20, 2025A00416$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 16MAY25. DUPLEX STRAINER PIPE REWORK, PLATE REPLACEMENT, FAIRWATER WELD GIVEBACK, MAIN STEAM PIPE INTERFERENCE REPAIR, SHIM BEARING DOWEL PIN REPAIR
May 14, 2025A00415$0UPDATE NAVSEA 0989-062-4000 MANUAL TO REVISION 8
May 13, 2025A00414$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 09MAY25.FAIRWATER COVERS REPAIR,REPLACE O-RINGS ON MAIN STEAM-1&2, WELD REPAIR GIVEBACK, GRINDING GIVEBACK, THERMOMETER REPLACEMENT, HULL INSERT REPAIR.
May 12, 2025A00413$0UPDATE THE AVAILABILITY WORK PACKAGE WITH CHANGES 312 THROUGH 318.
May 7, 2025A00412$0PERIODIC UPDATE TO ATTACHMENT 16/17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 02MAY25.MAIN BALLAST TANK WELD REPAIRS, FAIRWATER COVER REPAIR, INTERNAL SPARE PLATE REPAIR, CONTINGENT FLEX HOSE WORK, TILE INSTALLATION, PURGE TANK WORK
May 2, 2025A00411$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE HARTFORD ATTACHMENT 2 SUBJECT WORK LINE ITEM AND CONTRACT LINE ITEM BREAKOUT TO UPDATE LINE ITEMS WORKED DURING SMART START.
Apr 29, 2025A00410$0PERIODIC UPDATE TO ATTACHMENT 16&17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 25APR25. DOWEL PIN REPLACEMENT, MAST BEARING REPLACEMENT,HANGAR REPAIR,CLEARING TEST DEFICIENCIES,ADDITIONAL MAIN BALLAST TANK WELD REPAIRS, VALVE REPAIRS
Apr 25, 2025P00038$0USS HARTFORD (SSN 786) EOH EXECUTION
Apr 23, 2025A00409$0REPAIR OF PORT STEAM TURBINE GENERATOR GOVERNOR (MS-12) VALVE.
Apr 22, 2025A00407$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 18APR25. WELD ND RESTORATION REPAIRS TO TEE WELD IN PERISCOPE INSERT,TRANSITION PLATE MODIFICATION DUE TO REPLACED STIFFENER,REPAIRS TO TRUNK COVER
Apr 22, 2025A00408$0UPDATE THE AVAILABILITY WORK PACKAGE WITH CHANGES 310 AND 311
Apr 16, 2025A00406$0UPDATE ATTACHMENT 16/17 TO ADJUDICATE ANY GROWTH WORK THRU WEEKENDING 11APRRIL25:FAIRWATER MASTGUARD WELD REPAIRS,FIREAXE HOLDER REPAIRS,REMOVAL OF CREW LIVING SPACE INTERFERENCES,DRAIN PUMP AND MOTOR REPAIRS, MAIN BALLAST TANK 3A, 1B,2B WELD REPAIRS
Apr 11, 2025A00405$170.0KSERVICES FOR ALTERATION INSTALLATION TEAM PERFORMING REPAIRS ON LIVING BARGE SUPPORTING SHIPS FORCE.
Apr 10, 2025A00404$0UPDATE THE AVAILABILITY WORK PACKAGE WITH CHANGES 306,307, 308 & 309
Apr 8, 2025A00403$0PERIODIC UPDATE TO ATTACHMENT 16/17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 04APRIL25 DECKSTRUCTURE REPAIR, WELD RESTORATION GIVE BACK,INSTALL GEAR RACK STOP ASSEMBLY,COAT NEW STUDS PER MILITARY STANDARD, WELDREPAIRS ON STABILIZER
Apr 1, 2025A00401$0UPDATE THE AVAILABILITY WORK PACKAGE WITH CHANGES 303,304 & 305
Apr 1, 2025A00402$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 WITH AUTHORIZED GROWTH WORK THROUGH WEEKENDING 28MARCH25. GROWTH WORK FOR WELDING TEST FAILURES IN TANKS, SIGHT GLASS REPAIR, STABILIZER REPAIRS, SWITCHBOARD TEST FAILURES, HANGAR ROPE GUARD REPAIRS
Mar 26, 2025A00400$0PERIODIC UPDATE TO ATTACHMENT 16 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 21MARCH25 FOR WORK TO FIRE AXE FOUNDATION, PLATFORM FOR EXERCISE EQUIPMENT, STEEL REPAIRS TO RUDDER, STERN PLANES AND REPAIRS TO SWITCHBOARDS.
Mar 19, 2025A00396$87.1KADDITIONAL SUPPORT SERVICES REQUIRED FOR THE LOW PRESSURE ELECTROLYZER INSTALLATION.
Mar 19, 2025A00397$0AUTHORIZED GROWTH WORK THROUGH WEEKENDING 14MARCH2025 ONLY 11 SMALL DOLLAR GROWTH ITEMS WERE AUTHORIZED WITH NOTHING NEGOTIATED.GROWTH TO REPAIR STEEL DEFICIENCIES IN VERTICAL LAUNCH SYSTEM, BREAKER REPAIRS DUE TO TEST FAILURES, FLOAT SWITCH REPAIRS.
Mar 19, 2025A00398$0REPAIRS TO GOVERNMENT FURNISHED SHAFT AND SHAFT COUPLING.
Mar 19, 2025A00399$0PERIODIC RELEASE PER C-243-H002 NOTIFICATION OF CHANGES CLAUSE THROUGH 31 DEC 23
Mar 17, 2025A00395$0UPDATE THE AVAILABILITY WORK PACKAGE TO CLARIFY WORK LANGUAGE IN THE LINE ITEM WITHIN CHANGES 300, 301, AND 302, AT NO COST.
Mar 11, 2025A00394$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 07MARCH25.GROWTH WORK INCLUDES PLATE REPLACEMENT IN TANK, STIFFENER MANUFACTURE AND INSTALL AND WELD REPAIRS OF STEEL DEFECTS
Mar 10, 2025A00393$0ADDING NOT READY FOR ISSUE BEARING FRAME TO ATTACHMENT 6
Mar 6, 2025A00390$0BASELINE CLARIFICATION TO INCREASE THE QUANTITY OF SPECIAL HULL TREATMENT TILES AND FAIRINGS TO BE REMOVED AND REINSTALLED ON TWO SECTIONS OF THE VESSEL.
Mar 6, 2025A00391$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 28FEBUARY25. WELD REPAIR OF DEFECTS ON HORIZONTAL STABILIZER BARS, STEAM GENERATOR VALVE129 REPLACE, CORRECT DEFECTS FOUND ROPE GUARD
Mar 6, 2025A00392$0ADMINISTRATIVE MODIFICATION UPDATING CONTRACT FUNDING SUMMARY TABLE TO CORRECT A TYPO.
Feb 25, 2025A00386$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE AUTHORIZED GROWTH THRU WEEKENDING 21FEBRUARY25. ONLY 7 LOW VALUE GROWTH WORK ITEMS FOR WELD REPAIRS ON HORIZONTAL STABILIZERS, PARTS FOR TRANSDUCER AND REPAIRS ON AIR ANCHOR
Feb 25, 2025A00387$0UPDATE THE AVAILABILITY WORK PACKAGE TO CLARIFY WORK LANGUAGE IN THE LINE ITEM WITHIN CHANGES 298 AND 299, AT NO COST.
Feb 25, 2025A00389$70.0KINCREMENTALLY FUND PREVIOUSLY NEGOTIATED POINT CHANGE 768.500 FOR ALTERATION INSTALLATION TEAM SUPPORT FOR C4I.
Feb 18, 2025A00385$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 14FEBRUARY25. GROWTH TO RESTORE TANK THICKNESS IN MAIN BALLAST TANK, ORDER CONTINGENT MATERIAL FOR LEAKING VALVES, SWITCHBOARD REPAIRS.
Feb 14, 2025A00384$4.3MFUNDING FOR A COST OVERRUN ON CONTRACT LINE ITEM 0022.
Feb 11, 2025A00383$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 07FEB25. PAINT MARKINGS ON NEW PARTS, WELD BUILD UP HORIZONTAL STABILIZER BAR AND RE-DRILL HOLES AND ORDER CONTINGENT PARTS FOR 5S SWITCHBOARD TESTING
Feb 10, 2025A00382$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE SPEC 768.3318 DATED 4 FEBRUARY 2025, WHICH UPDATES THE AVAILABILITY WORK PACKAGE TO INCLUDE CHANGE 297 AT NO COST.
Feb 4, 2025A00381$0PERIODIC UPDATE TO ATTACHMENT 16/17 TO ADJUDICATE AUTHORIZED GROWTH THRU WEEKENDING 31JANUARY25. ONLY 9 COUPONS WERE AUTHORIZED FOR GROWTH ITEMS THAT INCLUDE WELD REPAIRS, BRIDGE DOOR REPAIRS AND HULL CUT 40 AND SWITCHBOARD WORK.
Jan 29, 2025A00380$0UPDATES TO ATTACHMENT 16 GROWTH WEEKENDING 24JANUARY2025MATERIAL FOR STEAM GENERATOR VALVES,HANGARINSTALL,SHOOT,WELD NEW ANODE STUDS IN TANK,SOURCE NEW TAPER PIN, WASHER AND GASKETS FOR SUMP PUMP,WELD BELT GUARD,STUD REPLACEMENT,RESTORATION BULKHEAD
Jan 22, 2025A00377$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 17JANUARY25. ONE ITEM BETWEEN $50,001 AND $2M NEGOTIATED FOR GROWTH WORK TO REPAIR LEAKING BALL VALVE
Jan 22, 2025A00378$0RETURN OF MATERIAL GROWTH COSTS FOR AUTOMATED ELECTROLYTIC OXYGEN GENERATOR THAT IS NO LONGER REQUIRED (AEOG).
Jan 22, 2025A00379$0UPDATE THE AVAILABILITY WORK PACKAGE TO CLARIFY WORK LANGUAGE IN THE LINE ITEM WITH CHANGE 296 AT NO COST.
Jan 14, 2025A00375$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE AUTHORIZED GROWTH THRU WEEKENDING 10JANUARY25. THIS INCLUDES 6 SMALL DOLLAR GROWTH IDENTIFIED AS UNDER $50,000. ONE GREATER THAN $50,000 GROWTH TO REPAIR A LEAKING BALL VALVE.
Jan 14, 2025A00376$0UPDATE THE AVAILABILITY WORK PACKAGE TO CLARIFY WORK LANGUAGE IN THE LINE ITEM WITH CHANGE 295 AT NO COST.
Jan 8, 2025A00374$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 20DEC24. MAIN BALLAST TANK 3A, PRESSURE HULL-EXTERIOR-Z120, MAIN BALLAST TANK 5A, AND 6 COUPONS.
Dec 20, 2024A00373$141.9KSERVICE AND SUPPORT SCOPE ADDED TO LINE 0018 TO SUPPORT PRIME CONTRACTOR DELPHINUS INSTALL A NEW LOW PRESSURE ELECTROLYZER.
Dec 19, 2024P00037$81.3MUSS HARTFORD (SSN 786) EOH EXECUTION
Dec 17, 2024A00372$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 13DEC24. PRIVATE SHIPYARD SUPPORT, WELD REPAIR OF STEEL DEFECTS IN MAIN BALLAST TANKS 3A AND 3, REPAIRS OF HOIST SYSTEM
Dec 13, 2024P00036$708.6KUSS HARTFORD (SSN 786) EOH EXECUTION
Dec 10, 2024A00369$0UPDATE THE AVAILABILITY WORK PACKAGE TO CLARIFY WORK LANGUAGE IN THE LINE ITEM WITH CHANGE 293 AT NO COST.
Dec 10, 2024A00370$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 06DEC24, THIS WEEK ONLY SDVG ITEMS BELOW THE "COUPON" WERE AUTHORIZED TOTALING 29. NO POINT CHANGES WERE NEGOTIATED.
Dec 10, 2024A00371$0REMOVE, FABRICATE AND REINSTALL ADDITIONAL VIBRATION DAMPENING TILES AND HULL INSULATION INCREASE TO BASELINE CLARIFICATION TO INCREASE TILES BY 1,068 AND 388 SQUARE FEET OF INSULATION.
Nov 26, 2024A00368$168.9KADDITIONAL SCOPE AND FUNDING FOR ALTERATION INSTALLATION TEAM SINGLE LINE ITEM AJ FOR C4I
Nov 25, 2024A00365$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE AVAILABILITY WORK PACKAGE TO INCLUDE CHANGES 291 AND 292 AT NO COST.
Nov 25, 2024A00366$0UPDATE TO ATTACHMENT 7 CLARIFYING 8010 TEMPORARY FIRE MAIN DRILL TESTING
Nov 25, 2024A00367$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE AUTHORIZED GROWTH THRU WEEKENDING 22NOV24. NO NEGOTIATED ITEMS VALUED OVER $50,000 DOLLARS. ONLY 13 COUPONS WERE AUTHORIZED FOR VARIOUS GROWTH ITEMS VALUED UNDER $50,000.
Nov 19, 2024A00363$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE AVAILABILITY WORK PACKAGE TO INCLUDE CHANGE 290 AT NO COST.
Nov 19, 2024A00364$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 15NOVEMBER24. PORT TORPEDO TUBE RECESS REPAIR.
Nov 15, 2024A00362$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE POINT CHANGE 768.3166 DATED 04NOVEMBER24, WHICH UPDATES THE AVAILABILITY WORK PACKAGE TO INCLUDE CHANGE 289 AT NO COST.
Nov 13, 2024A00361$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 08NOVEMBER24. FAIRWATER BAY 5 REPAIRS, LEAD INSTALL BALLAST, WELD T STIFFENER GIVE BACK, SADDLE PORTION REINSTALLATION, PLATE REPLACEMENT GIVE BACK.
Nov 5, 2024A00360$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 01NOV24. FAIRWATER BAY 5 WELD REPAIR, MATERIAL COST AND LABOR EFFECTS OF MANUAL OPERATOR ASSEMBLY REPAIR, VALVE DEFICIENCIES REPAIR.
Oct 30, 2024A00359$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 25OCT24. FAIRWATER BAY 5 WELD REPLACEMENT, PORT AND STARBOARD STERN PLANE REPLACEMENT, REMOVAL, REPAIR AND REINSTALLATION OF ACTUATOR.
Oct 22, 2024A00356$0ADJUDICATE SETTLEMENT OF NOTIFICATION OF CHANGE RELATED TO HOT WORK STOPPAGE
Oct 22, 2024A00357$0UPDATED ATTACHMENT 15 TO INCREASE QUANTITY LISTED FOR ITEM #77.
Oct 22, 2024A00358$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 18OCTOBER24. PROCURE AND ASSEMBLE PETERSON PACKING GLANDS, TILE INCREASE, HASAN GIVE BACK, ROPE GUARD BOLTING RING REPAIR.
Oct 18, 2024A00355$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE GOVERNMENT FURNISHED EQUIPMENT ATTACHMENT 4A AND 4B TO INCLUDE LINE ITEM 171- QUANTITY OF FIVE JACK-UP KEEL BLOCK ASSEMBLIES.
Oct 16, 2024A00354$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 11OCTOBER24. MRC 003 REPAIRS, STARBOARD DIHEDRAL TRANSITION RE-PRESERVATION, AUXILIARY TANK 3, PORT HORIZONTAL STABILIZER AFT TRAILING EDGE.
Oct 15, 2024A00353$0REPLACEMENT OF STEAM GENERATOR VALVE 35.
Oct 9, 2024A00351$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 04OCTOBER24
Oct 9, 2024A00352$0ADJUDICATION OF STEAM GENERATOR VALVE 33 FREEZE SEAL GROWTH
Oct 4, 2024A00350$0UPDATE AVAILABILITY WORK PACKAGE WITH CHANGE 288 AT NO COST.
Oct 3, 2024A00349$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE 768.2934 DATED 25SEPTEMBER24, WHICH UPDATES THE AVAILABILITY WORK PACKAGE TO INCLUDE CHANGE 277 AT NO COST.
Oct 1, 2024A00348$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 27SEP24. MRC 003-MBT3B PLATE REPLACEMENT GIVE BACK. FURNISHINGS-ZONE 851 REPAIRS, MBT 4 STEEL DEFICIENCY WELD REPAIRS.
Sep 24, 2024A00345$0THIS MODIFICATION UPDATES THE AVAILABILITY WORK PACKAGE TO INCLUDE CHANGES 286 AND 287 AT NO COST.
Sep 24, 2024A00346$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE AVAILABILITY WORK PACKAGE TO INCLUDE CHANGE 281, 282, 283, 284, 285 AT NO COST.
Sep 24, 2024A00347$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 20SEP24
Sep 20, 2024A00344$2.6KADDED FUNDING TO LINE ITEM 0018 FOR 768.503 ADDITIONAL SERVICE AND SUPPORT
Sep 18, 2024A00343$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE AVAILABILITY WORK PACKAGE TO INCLUDE CHANGES 254 & 276 AT NO COST.
Sep 17, 2024A00341$0EFFORTS TO REINSTALL LEAD IN MAIN BALLAST TANK 3 B POINT CHANGE 768.2929 IS BEING ADDED TO ATTACHMENT 16.
Sep 17, 2024A00342$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 13SEP24
Sep 12, 2024A00340$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 06SEP24
Sep 4, 2024A00339$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 30 AUGUST 2024
Sep 3, 2024A00338$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE AVAILABILITY WORK PACKAGE TO INCLUDE CHANGE 280 AT NO COST.
Aug 30, 2024A00337$0RELEASE OF CLAIMS 30JUN23
Aug 29, 2024A00336$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE AVAILABILITY WORK PACKAGE TO INCLUDE CHANGE 278 AT NO COST.
Aug 28, 2024A00335$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 23AUG24
Aug 26, 2024A00334$0EXECUTION OF WELD REPAIR GROWTH WORK ON HORIZONTAL STABILIZER POINT CHANGE 768.2959 IS BEING ADDED TO ATTACHMENT 16.
Aug 22, 2024A00333$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 08.16.24
Aug 19, 2024A00331$0ATTACHMENT NUMBER TWO (2) UPDATE TO ADD ONE (1) SHIP WORK LINE ITEM. ADDITIONALLY, UPDATES THE AVAILABILITY WORK PACKAGE TO ADD CHANGES 274 AND 275. BOTH ACTIONS ARE AT NO COST.
Aug 19, 2024A00332$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE AVAILABILITY WORK PACKAGE TO INCLUDE CHANGES 237 AND 279 AT NO COST.
Aug 13, 2024A00330$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 08.09.24
Aug 6, 2024A00329$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 02AUG24
Aug 1, 2024A00328$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE NEWLY DATED SPEC 768.2803 01JULY2024 TO ADDS DF B1768-22146 WHICH CANCELS DF B1768-22223 AND THAT WAS INCORPORATED ON A00318 AND A00319.
Jul 30, 2024P00035$55.5MUSS HARTFORD (SSN 786) EOH EXECUTION
Jul 29, 2024A00327$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 07/26/24
Jul 19, 2024A00324$721.3KPERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 07.12.24 AND MOVE CEILING AND HOURS FROM LINE 2001 TO 0021 IN THE AMOUNT OF $721,320
Jul 19, 2024A00325$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE GOVERNMENT FURNISHED EQUIPMENT ATTACHMENT 4A AND 4B TO INCLUDE LINE ITEM 171-AUX #3 BOILER COVER.
Jul 19, 2024A00326$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE GOVERNMENT FURNISHED EQUIPMENT ATTACHMENT 4A AND 4B TO INCLUDE LINE ITEM 170 -PL 44 VALVE KIT
Jul 11, 2024A00323$4.8MPERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 07.05.24
Jul 9, 2024A00322$0UPDATING THE AVAILABILITY WORK PACKAGE WITH CHANGES 272 AND 273.
Jul 2, 2024A00321$0THE PURPOSE OF THIS MODIFICATION INCORPORATES SPECIFICATION 768.2827 DATED 26JUNE24, WHICH UPDATES THE AVAILABILITY WORK PACKAGE TO INCLUDE CHANGE 271 AT NO COST.
Jun 28, 2024A00320$2.8MPERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 06.14.24, FUNDED 8,000 END USE HOUR TRANSFER FROM 2001 TO 0021.
Jun 17, 2024A00319$0ADMINISTRATIVE MOD TO CORRECT SHIP WORK LINE ITEM LISTED ON SPECIFICATION.
Jun 11, 2024A00317$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 07JUNE24.
Jun 11, 2024A00318$0THE PURPOSE OF THIS MODIFICATION INCORPORATES SPEC 768.2803 DATED 6JUNE24, WHICH UPDATES THE AVAILABILITY WORK PACKAGE TO INCLUDE CHANGE 270 AT NO COST.
Jun 5, 2024A00316$0EXECUTION OF GROWTH WORK CONSISTING OF WELD AND PLATE REPLACEMENT REPAIRS IN LARGE TANK
Jun 4, 2024A00315$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 5.31.24
May 29, 2024A00313$0UPDATE THE AVAILABILITY WORK PACKAGE WITH CHANGE 269
May 29, 2024A00314$0PERIODIC UPDATE TO ATTACHMENT 16 & 17 TO ADJUDICATE ANY AUTHORIZED GROWTH WORK THROUGH WEEKENDING 5.24.24
May 22, 2024A00310$0TABLE ADDED TO REFLECT ALL SUBLINE-CONTRACT LINE ITEM FUNDING FOR 0018

Estimated positioning window

Nov 1, 2026 – May 1, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2027-11-01 (365 days from calculation)
+35 points
11 historical awards in this buyer and category group
+15 points
546 recorded award transactions
+10 points
Latest award action: 2026-06-02
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.