Federal contract award
N0002421C2106
FY21 RCOH ACCOMPLISHMENT
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | SUP OF SHIPBUILDING CONV AND REPAIR |
| NAICS | 336611 — Ship Building and Repairing |
| PSC | 1905 — Combat Ships and Landing Vessels |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS INCENTIVE FEE |
| Obligations | $3.8B |
| Current contract value | $3.9B |
| Potential contract value / ceiling | $3.9B |
| Start date | Feb 19, 2021 |
| Current end date | Oct 6, 2026 |
| Potential end date | Oct 6, 2026 |
| Latest award activity | Jun 4, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 200 of 1,275 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 12, 2026 | P00051 | $15.0M | SUPPLEMENTAL AGREEMENT |
| Jun 4, 2026 | A00117 | $0 | N00024-21-C-2106 CVN 74 ADJUDICATION MOD FOR THE TIMEFRAME OF 15 APRIL 2026 TO 15 MAY 2026, WITH THE EXCEPTION OF FMRS 1780.13 AND 2143.00. |
| May 11, 2026 | P00050 | $0 | WORKFORCE RETENTION |
| May 5, 2026 | A00116 | $0 | CVN 74 N00024-21-C-2106 EXEC PERIODIC RELEASE MOD FOR THE PERIOD JANUARY 1,2025 THROUGH JUNE 30,2025 |
| Apr 24, 2026 | A00115 | $0 | N00024-21-C-2106 CVN 74 ADJUDICATION MOD FOR THE TIMEFRAME OF 23 FEBRUARY 2026 TO 15 APRIL 2026. |
| Apr 22, 2026 | P00049 | $0 | CLAUSE UPDATE |
| Apr 1, 2026 | A00114 | $166.3K | CVN 74 N00024-21-C-2106 HUNTINGTON HALL MOD FROM 23 MARCH 2026 TO 29 MAY 2026. |
| Apr 1, 2026 | P00048 | $27.6M | FUNDING ACTION |
| Mar 27, 2026 | A00113 | $0 | CVN 74 N00024-21-C-2106 ADJUDICATION MOD FROM 15 OCTOBER 2025 - 15 MARCH 2026. |
| Mar 26, 2026 | A00112 | $0 | CVN 74 N00024-21-C-2106 GOVERNMENT PROPERTY TRANSFER TO CVN 75 ADVANCE PLANNING N00024-24-C-2106. |
| Mar 13, 2026 | P00047 | $350.0M | FUNDING ACTION |
| Feb 27, 2026 | A00111 | $0 | CVN 74 RCOH N00024-21-C-2106 ADJUDICATION MOD FOR THE TIMEFRAME OF 16 JAN 2026 - 15 FEB 2026. |
| Feb 23, 2026 | P00046 | $0 | ADMINISTRATIVE UPDATE |
| Feb 20, 2026 | A00110 | $0 | THIS MODIFICATION IS FOR THE TRANSFER OF GOVERNMENT PROPERTY FROM CONTRACTS CVN73 AP, CVN73 EX, AND CVN75 AP TO CONTRACT CVN74 EX. |
| Feb 5, 2026 | A00109 | $0 | CVN 74 N00024-21-C-2106 GFP TRANSFER TO CVN 75 AP N00024-24-C-2106. |
| Jan 28, 2026 | A00107 | $0 | CVN 74 N00024-21-C-2106 ADJUDICATION MOD FOR THE PERIOD OF 16 NOV 2025 - 3 DEC 2025. |
| Dec 19, 2025 | A00106 | $0 | TO TRANSFER GOVERNMENT PROPERTY FROM CONTRACT N00024-21-C-2106 (CVN74 EXECUTION) TO CONTRACT N00024-24-C-2106 (CVN75 AP) |
| Dec 18, 2025 | P00045 | $12.5M | FUNDING ACTION |
| Dec 1, 2025 | A00105 | $0 | CVN 74 N00024-21-C-2106 ADJ MOD FOR THE PERIOD OF 16 OCT 25 - 15 NOV 25 |
| Dec 1, 2025 | P00044 | $1.3M | DEWATERING CAPEX FUNDING |
| Nov 14, 2025 | A00104 | $0 | CVN 74 N00024-21-C-2106 EXEC PERIODIC RELEASE MOD FOR THE PERIOD OF 1 JUL 2024 THROUGH 31 DEC 2024. |
| Nov 14, 2025 | P00043 | $52.0M | QOS CAPEX FUNDING |
| Nov 6, 2025 | A00103 | $0 | CVN 74 N00024-21-C-2106 ADJUDICATION MOD 16 SEP 2025 - 15 OCT 2025 |
| Nov 3, 2025 | P00042 | $0 | CVN 74 RCOH ACCOMPLISHMENT OTHER ADMINISTRATIVE ACTION |
| Oct 20, 2025 | A00101 | $0 | CVN 74 N00024-21-C-2106 ADJUDICATION MOD 1 DEC 2021 - 8 AUG 2023 |
| Oct 20, 2025 | A00102 | $0 | CVN 74 N00024-21-C-2106 ADJUDICATION MOD FOR THE PERIOD OF 9 AUG 2023 - 8 AUG 2025 |
| Sep 26, 2025 | A00100 | $0 | CVN RCOH N00024-21-C-2106 ADJ MOD FOR THE PERIOD OF 16 AUGUST 2025 THROUGH 15 SEPTEMBER 2025. |
| Sep 26, 2025 | P00041 | $11.3M | CVN 74 RCOH ACCOMPLISHMENT FUNDING ONLY ACTION |
| Sep 23, 2025 | A00099 | $931.8K | CVN 74 N00024-21-C-2106 HUNTINGTON HALL MOD FROM 22 SEPTEMBER 2025 - 22 MARCH 2026. |
| Sep 11, 2025 | P00040 | $5.0M | CVN 74 RCOH ACCOMPLISHMENT E&S |
| Sep 5, 2025 | A00097 | $0 | TO TRANSFER GOVERNMENT PROPERTY FROM CONTRACT N00024-21-C-2106 (CVN 74 EXECUTION) TO CONTRACT N00024-24-C-2106 (CVN 75 AP |
| Sep 5, 2025 | A00098 | $0 | CVN REFUELING AND COMPLEX OVERHAUL N00024-21-C-2106 ADJUDICATION MODIFICATION FOR THE PERIOD OF 15 JUL 25 THROUGH 16 AUG 25 |
| Aug 29, 2025 | P00039 | $27.5M | CONTRACT EXTENSION |
| Aug 8, 2025 | A00096 | $0 | CVN 74 RCOH N0002421C2106 ADJUDICATION MODIFICATION FOR THE PERIOD 16 JUNE 2025 THRU 15 JULY 2025. |
| Jul 31, 2025 | A00095 | $0 | GOVERNMENT PROPERTY TRANSFER TO THE FACILITIES USE CONTRACT |
| Jul 28, 2025 | P00037 | $550.0K | FUNDING MODIFICATION AND UPDATE SECTION J ATTACHMENTS D AND Q. |
| Jul 1, 2025 | A00094 | $0 | CVN 74 RCOH N0002421C2106 ADJUDICATION MODIFICATION FOR THE PERIOD 16 MAY 2025 THRU 15 JUNE 2025. |
| Jun 13, 2025 | A00093 | $0 | CVN 74 RCOH N0002421C2106 ADJUDICATION MODIFICATION FOR THE PERIOD 16 APRIL 2025 THRU 15 MAY 2025. |
| Jun 2, 2025 | P00035 | $85.0M | FUNDING MODIFICATION |
| May 28, 2025 | P00034 | $5.0M | SUPPLEMENTAL WORK AND FUNDING |
| May 15, 2025 | A00092 | $0 | CVN 74 RCOH N0002421C2106 PERIODIC RELEASE MODIFICATION FOR THE PERIOD 01 JAN 2024 THROUGH 30 JUN 2024. |
| May 13, 2025 | A00091 | $959.1K | CVN 74 N0002421C2106 HUNTINGTON HALL MOD 24 MAR 25 THROUGH 21 SEP 25 |
| Apr 30, 2025 | P00033 | $28.2M | FY21 RCOH ACCOMPLISHMENT |
| Apr 24, 2025 | P00032 | $70.0M | FUNDING MODIFICATION |
| Apr 23, 2025 | A00090 | $0 | CVN 74 RCOH N0002421C2106 ADJUDICATION MODIFICATION FOR THE PERIOD 16 MAR 2025 THRU 15 APR 2025. |
| Apr 17, 2025 | P00031 | $21.7M | FUNDING MOD |
| Apr 16, 2025 | P00030 | $3.0M | FUNDING FOR EARNED INCENTIVE |
| Apr 11, 2025 | A00089 | $0 | N00024-21-C-2106, CVN74 EXECUTION, PERIODIC RELEASE MODIFICATION 1 JULY - 31 DECEMBER 2023. |
| Apr 10, 2025 | A00088 | $0 | CVN 74 RCOH N00024-21C2106 ADJUDICATION MODIFICATION FOR THE PERIOD 16 FEB 2025 TO 15 MAR 2025. |
| Mar 27, 2025 | A00087 | $0 | GOVERNMENT PROPERTY TRANSFERRED TO N62793-22-C-0002. |
| Mar 20, 2025 | P00029 | $85.0M | CVN 74 RCOH ACCOMPLISHMENT |
| Mar 14, 2025 | A00086 | $0 | CVN 74 RCOH N00024-21-C-2106 ADJUDICATION MODIFICATION FOR THE PERIOD 16 JAN 2025 TO 15 FEB 2025. |
| Feb 24, 2025 | A00085 | $0 | CVN 74 RCOH N00024-21-C-2106 ADJUDICATION MODIFICATION TO PROVIDE STORM PREPARATION FOR TROPICAL CYCLONE 16 FOR THE 21 SEP 2023 TO 24 SEP 2023. |
| Feb 19, 2025 | P00028 | $0 | E&S |
| Feb 13, 2025 | A00084 | $0 | CVN 74 RCOH N00024-21-C-2106 ADJUDICATION MODIFICATION FOR THE PERIOD OF 16 DECEMBER 2024- 15 JANUARY 2025. |
| Feb 3, 2025 | A00083 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO TRANSFER GOVERNMENT PROPERTY FROM CONTRACT N00024-21-C-2106 (CVN74 EXECUTION) TO CONTRACT, N00024-15-C-2114 (CVN 79) AND N00024-24-C-2106 (CVN 75 ADVANCED PLANNING). |
| Jan 21, 2025 | A00082 | $0 | CVN 74 RCOH N00024-21-C-2106 ADJUDICATION MODIFICATION FOR THE PERIOD OF 16 NOV 2024-15 DEC 2024. |
| Jan 8, 2025 | P00027 | $0 | PAYABLE FEE ADJUSTMENT |
| Dec 23, 2024 | P00026 | $0 | E&S TRANSFER AND INCREASE |
| Dec 18, 2024 | A00081 | $0 | CVN 74 RCOH N00024-21-C-2106 ADJUDICATION MODIFICATION FOR THE PERIOD OF 16 OCT 2024-15 NOV 2024. |
| Nov 13, 2024 | A00080 | $0 | CVN 74 RCOH N00024-21-C-2106 ADJUDICATION MODIFICATION FOR THE PERIOD OF 16 SEP 2024-15 OCT 2024. |
| Nov 1, 2024 | A00079 | $1.3M | THE PURPOSE OF THIS MODIFICATION IS TO AWARD THE HUNTINGTON HALL BERTHING AND MESSING FOR 23 SEP 2024- 23 MAR 2025. |
| Oct 8, 2024 | P00025 | $42.4M | FUNDING MODIFICATION |
| Sep 26, 2024 | A00078 | $0 | ALLOCATIONS TO RCOH E&S FOR THE PERIOD OF 17 AUGUST 24 TO 15 SEPTEMBER 24. |
| Sep 16, 2024 | P00024 | $25.0M | CVN 74 RCOH ACCOMPLISHMENT |
| Aug 30, 2024 | A00077 | $0 | ALLOCATIONS TO RCOH E&S FOR THE PERIOD OF 16 JULY 2024 TO 16 AUGUST 2024. |
| Aug 29, 2024 | A00076 | $0 | TRANSFER GOVERNMENT PROPERTY FROM N00024-21-C-2106 (CVN 74 EXECUTION) TO CONTRACT N00024-24-C-2106 (CVN 75 ADVANCE PLANNED). |
| Aug 8, 2024 | A00075 | $0 | ALLOCATIONS TO RCOH E&S FOR THE PERIOD OF 16 JUNE 2024 THROUGH 15 JULY 2024 |
| Jul 26, 2024 | A00074 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ACCEPT GOVERNMENT PROPERTY TRANSFERRED FROM CONTRACT N00024-17-C-2105 (CVN 73 EX) AND N00024-14-C-2111 (CVN 73 AP) TO N00024-21-C-2106 (CVN 74 EX). |
| Jul 19, 2024 | A00073 | $0 | ALLOCATIONS TO RCOH E AND S FOR THE PERIOD OF 16 MAY 2024 - 15 JUNE 2024 |
| Jul 12, 2024 | P00023 | $0 | SPECIAL INCENTIVE FOR QOL/QOS |
| Jun 12, 2024 | A00072 | $0 | ALLOCATIONS TO RCOH E&S FOR THE PERIOD OF 16 APRIL 24-15 MAY 24 |
| Jun 11, 2024 | P00022 | $300.0K | FUNDING MOD |
| May 22, 2024 | A00071 | $0 | CVN 74 EX GOVERNMENT PROPERTY ACCEPTANCE MOD FROM MATERIAL ON THE CVN 73 EX |
| May 10, 2024 | P00021 | $42.4M | FY21 RCOH ACCOMPLISHMENT |
| May 6, 2024 | A00070 | $0 | FY21 CVN 74 ADJUDICATION MOD PERIOD OF 16 MARCH 2024- 15 APRIL 2024 |
| May 3, 2024 | A00069 | $0 | PERIODIC RELEASE MODIFICATION 1 JAN - 30 JUN 2023 |
| Apr 19, 2024 | A00068 | $0 | CVN 74 TO FACILITY USE GOVERNMENT PROPERTY MOD |
| Apr 12, 2024 | P00020 | $0 | UPDATING ALLOTMENT OF FUNDS TABLE IN SECTION G-232-H0001 |
| Apr 11, 2024 | P00019 | $150.0M | FY21 RCOH ACCOMPLISHMENT |
| Apr 9, 2024 | A00067 | $0 | CVN 74 ADJUDICATION MOD |
| Mar 29, 2024 | A00066 | $1.2M | CVN 74 HUNTINGTON HALL MOD 25 MAR 2024 - 22 SEP 2024 |
| Mar 5, 2024 | A00065 | $0 | CVN 74 ADJUDICATION MOD (13 JANUARY 2024 - 9 FEBRUARY 2024) |
| Feb 23, 2024 | P00018 | $25.0M | E&S INCREASE |
| Feb 2, 2024 | A00064 | $0 | GOVERNMENT PROPERTY MODIFICATION |
| Jan 31, 2024 | P00017 | $7.5M | EMERGENT AND SUPPLEMENTAL WORK |
| Jan 30, 2024 | A00063 | $0 | CVN 74 ADJUDICATION MOD (30DEC 2023 - 12 DEC 2024) |
| Jan 16, 2024 | A00062 | $0 | CVN 74 ADJUDICATION MOD (18 NOV 2023 - 29 DEC 23) |
| Dec 4, 2023 | A00061 | $0 | ADJUDICATION MODIFICATION 14 OCT 23 - 17 NOV 23 |
| Nov 30, 2023 | P00016 | $0 | FY21 RCOH ACCOMPLISHMENT |
| Nov 24, 2023 | A00060 | $0 | GFP ACCEPTANCE MOD FROM N00024-17-C-2105 TO N00024-21-C-2106. |
| Nov 9, 2023 | A00059 | $0 | PERIODIC RELEASE MOD 1 JUL - 31 DEC 2022 |
| Nov 7, 2023 | A00058 | $0 | GFP ACCEPTANCE MOD FROM N00024-14-C-2111 TO N00024-21-C-2106. |
| Oct 31, 2023 | A00057 | $0 | FY21 REFUELING COMPLEX OVERHAUL ACCOMPLISHMENT |
| Oct 19, 2023 | P00015 | $300.0M | FUNDING ACTION |
| Oct 13, 2023 | A00055 | $0 | GFP ACCEPTANCE MOD FOR N00024-21-C-2106 |
| Oct 13, 2023 | A00056 | $0 | GFP MODIFICATION FROM N00024-17-C-2105 TO N00024-21-C-2106 |
| Oct 6, 2023 | A00054 | $980.0K | N00024-21-C-2106 HUNTINGTON HALL MOD POP SEP 2023 TO MAR 2024 |
| Oct 2, 2023 | A00052 | $0 | ADJUDICATION MODIFICATION 15 JULY 2023 - 18 AUGUST 2023 |
| Oct 2, 2023 | A00053 | $0 | FY21 REFUELING COMPLEX OVERHAUL ACCOMPLISHMENT |
| Aug 31, 2023 | A00051 | $0 | N00024-21-C-2106 GOVERNMENT PROPERTY MOD |
| Aug 16, 2023 | P00014 | $0 | FY21 RCOH ACCOMPLISHMENT |
| Aug 4, 2023 | A00050 | $0 | ADJUDICATION MODIFICATION 20 JUNE 23 - 14 JULY 23 |
| Jul 18, 2023 | A00049 | $0 | ADJUDICATION MODIFICATION 13 MAY 23- 16 JUNE 23 |
| Jun 6, 2023 | A00048 | $0 | PERIODIC ADJUDICATION MOD 15 APR 2023 THROUGH 12 MAY 2023 |
| May 31, 2023 | A00047 | $0 | ADMINISTRATIVE CHANGE |
| May 25, 2023 | A00046 | $0 | GOV PROP TRANSFER FROM CVN 73 TO CVN 74. |
| May 17, 2023 | A00045 | $0 | PERIODIC ADJ MOD FOR 18 MARCH 23-14 APRIL 23 |
| May 12, 2023 | A00044 | $0 | PRM 1 JAN - 30 JUN 2022 |
| May 2, 2023 | A00043 | $0 | PERIODIC ADJUDICATION MOD 18 FEB-17 MAR 23 |
| Apr 28, 2023 | A00042 | $0 | GOVERNMENT PROPERTY TRANSFER |
| Apr 14, 2023 | A40767 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Apr 11, 2023 | P00013 | $0 | FY21 RCOH ACCOMPLISHMENT |
| Mar 30, 2023 | A00041 | $0 | GOVERNMENT PROPERTY TRANSFER |
| Mar 29, 2023 | A00040 | $1.1M | HUNTINGTON HALL POP MAR 23 - SEPT 23 |
| Mar 2, 2023 | A00039 | $0 | CVN 74 ADJUDICATION MOD |
| Feb 22, 2023 | A00038 | $0 | FY21 REFUELING COMPLEX OVERHAUL ACCOMPLISHMENT |
| Feb 21, 2023 | A00036 | $0 | CVN 74 GFP MOD. |
| Feb 21, 2023 | A00037 | $0 | CVN 74 GFP MOD FROM CVN 73. |
| Jan 31, 2023 | A00035 | $0 | CVN 74 JANUARY ADJUDICATION MOD |
| Jan 25, 2023 | P00012 | $302.0M | FY21 RCOH ACCOMPLISHMENT |
| Jan 23, 2023 | A41127 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Jan 19, 2023 | A00034 | $0 | CVN 74 ADJUDICATION MOD. |
| Dec 9, 2022 | A41114 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Dec 9, 2022 | A41119 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Dec 8, 2022 | A41128 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Dec 7, 2022 | A00033 | $0 | CVN74 ADJUDICATION MOD |
| Dec 2, 2022 | A41080 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Dec 2, 2022 | A41089 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Dec 2, 2022 | A41102 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 30, 2022 | P00011 | $1.7M | FY21 RCOH ACCOMPLISHMENT |
| Nov 29, 2022 | A41073 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 29, 2022 | A41085 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 29, 2022 | A41116 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 29, 2022 | A41129 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 29, 2022 | A41130 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 29, 2022 | A41131 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 28, 2022 | A00031 | $0 | CVN 74 GP TRANSFER MOD |
| Nov 28, 2022 | A00032 | $0 | CVN 74 HURRICANE ELSA STORM PREP |
| Nov 23, 2022 | A00030 | $0 | FY21 REFUELING COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 23, 2022 | A41115 | $0 | CVN 74 RCOH ACCOMPLISHMENT |
| Nov 23, 2022 | A41117 | $0 | CVN 74 RCOH ACCOMPLISHMENT |
| Nov 23, 2022 | A41118 | $0 | CVN 74 RCOH ACCOMPLISHMENT |
| Nov 23, 2022 | A41120 | $0 | CVN 74 RCOH ACCOMPLISHMENT |
| Nov 23, 2022 | A41121 | $0 | CVN 74 RCOH ACCOMPLISHMENT |
| Nov 22, 2022 | A41111 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 22, 2022 | A41122 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 22, 2022 | A41123 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 22, 2022 | A41124 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 22, 2022 | A41125 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 22, 2022 | A41126 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 21, 2022 | A41107 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 21, 2022 | A41108 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 21, 2022 | A41110 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 18, 2022 | A41113 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 17, 2022 | A41098 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 17, 2022 | A41099 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 17, 2022 | A41100 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 17, 2022 | A41101 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 17, 2022 | A41103 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 17, 2022 | A41104 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 17, 2022 | A41105 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 17, 2022 | A41112 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 16, 2022 | A41106 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 15, 2022 | A41092 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 15, 2022 | A41093 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 15, 2022 | A41094 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 15, 2022 | A41095 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 15, 2022 | A41096 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 15, 2022 | A41097 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 14, 2022 | A41086 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 10, 2022 | A41055 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 10, 2022 | A41082 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 10, 2022 | A41083 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 10, 2022 | A41084 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 10, 2022 | A41090 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 10, 2022 | A41091 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 9, 2022 | A41075 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 9, 2022 | A41088 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 8, 2022 | A41087 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 4, 2022 | A41068 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 4, 2022 | A41071 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 4, 2022 | A41076 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 4, 2022 | A41077 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 4, 2022 | A41078 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 4, 2022 | A41079 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Nov 1, 2022 | A41062 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Oct 31, 2022 | A40933 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Oct 31, 2022 | A41069 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Oct 31, 2022 | A41074 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Oct 31, 2022 | A41081 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Oct 28, 2022 | A00029 | $0 | CVN74 ADJUDICATION MOD |
| Oct 28, 2022 | A41070 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Oct 28, 2022 | A41072 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Oct 26, 2022 | A41029 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Oct 26, 2022 | A41067 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Oct 25, 2022 | A41064 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Oct 25, 2022 | A41065 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Oct 21, 2022 | A40999 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |
| Oct 21, 2022 | A41033 | $0 | CVN 74 REFUELING AND COMPLEX OVERHAUL ACCOMPLISHMENT |