N0002421C2443

LPD 17 CLASS ENGINEERING SERVICES

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVSEA HQ
NAICS336611 — Ship Building and Repairing
PSCK019 — Modification of Equipment: Ships, Small Craft, Pontoons, and Floating Docks
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$119.2M
Current contract value$217.4M
Potential contract value / ceiling$231.5M
Start dateFeb 26, 2021
Current end dateFeb 1, 2027
Potential end dateFeb 1, 2027
Latest award activityApr 24, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 357 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 24, 2026P00053$-5.5MIPDA EXECUTION
Jan 28, 2026A00300$0QUARTER 4 WATERFRONT TASK AUTHROIZATION POOL ADMIN MOD HEADQUARTERS MODIFICATION REQUEST 454 LPD 29
Jan 28, 2026A00301$0Q4 WATERFRONT TASK AUTHORIZATION ADMIN MOD HEADQUARTERS MODIFICATION REQUEST 472 LPD 29
Dec 19, 2025A00299$48.5KHEADQUARTERS MODIFICATION REQUEST (HMR) 477 LPD 30AF TASK 1.23 LPD 30 BOAT AND CARGO CRANE SOFTWARE VERIFICATION
Dec 18, 2025A00298$0HEADQUARTERS MODIFICATION REQUEST 474 POST-DELIVERY WTA POOL Q3 2025 LPD 30 CONTRACT LINE ITEM NUMBER 0010
Dec 15, 2025A00297$0HEADQUARTERS MODIFICATION REQUEST (HMR) 454 CONTRACT LINE ITEM NUMBER 0010 WATERFRONT TASK AUTHORIZATION QUARTER 3 ADMIN MOD (OCTOBER 2025)
Dec 11, 2025A00296$11.2KINDUSTRIAL POST-DELIVERY AVAILABILITY EXECUTION - FIELD MODIFICATION REQUEST (FMR) 1947, LPD 30 ADDITIONAL WORK ITEM (AWI) 8264: STOWAGE FOR SHORE POWER PIGTAILS, INSTALL CONTRACT LINE ITEM NUMBER (CLIN) 0010
Dec 9, 2025P00052$-979.5KIPDA EXECUTION
Nov 17, 2025A00295$29.6KFIELD MODIFICATION REQUEST 1951, LPD 30 ADDITIONAL WORK ITEM 1573 (ESCAPE TRUNK LADDER RUNG SAFETY GRIPS INSTALL ACCOMPLISH) CONTRACT LINE ITEM NUMBER 0010
Oct 22, 2025P00051$35.2KIPDA EXECUTION
Oct 15, 2025A00294$1.1MUWI-0004W02-LPD-29-WI-514-11-008(KM) ADDITIONAL A/C PLANT LLTM PROCUREMENT ACCOMPLISH
Sep 11, 2025A00292$192.5KEWI 0034 CLIN 0010 ACRN TL
Sep 11, 2025A00293$2.1KLPD 29 TASK 1.19 CFR 5077
Sep 10, 2025A00291$75.0KHEADQUARTERS MODIFICATION REQUEST 474 LPD 30 FUNDING POOL ESTABLISH CONTRACT LINE ITEM NUMBER 0010
Sep 8, 2025A00289$40.9KADDITIONAL WORK ITEM 2089 CONDITION FOUND REPORT 5020 - HTS DEGAUSSING SYSTEM AIR COOLED POWER SUPPLY VENTILATION MODIFICATION ACCOMPLISH
Sep 8, 2025A00290$25.6KFIELD MODIFICATION REQUEST 1948 EMERGENT WORK ITEM (EWI) 0030: POTABLE, DEMINERALIZED, AND SEA WATER TIE-INS FOR FOURTH AC PLANT INSTALL
Aug 28, 2025A00288$75.0KLPD 29 HEADQUARTERS MODIFICATION REQUEST 472 WATERFRONT TASK AUTHORIZATION POOL ESTABLISH CONTRACT LINE ITEM NUMBER 0010
Aug 20, 2025A00287$130.2KHMR 470 LPD 29 AWI-2089M02 (KM) HIGH TEMPERATURE SUPERCONDUCTING (HTS) DEGAUSSING SYSTEM AIR COOLED POWER SUPPLY VENTILATION MODIFICATIONS ACCOMPLISH
Aug 19, 2025A00286$95.6KLPD 29 TASK 1.24 RESCUE BOAT DAVIT TYPE I VIBRATION CERTIFICATION ANALYSIS ACCOMPLISH - CONTRACT LINE ITEM NUMBER (CLIN) 0010
Aug 18, 2025A00284$0LPD 29 HEADQUARTERS MODIFICATION REQUEST 454 WATERFRONT TASK AUTHORIZATION CONTRACT LINE ITEM NUMBER 0010 - QUARTER 2 (JULY 2025)
Aug 18, 2025A00285$95.6KLPD 29 EMERGENT CHANGE REQUEST (ECR) 2464Y CONDITION FOUND REPORT (CFR) 0242 - HIGH TEMPERATURE SUPERCONDUCTING (HTS) DEGAUSSING SYSTEM INSTALLATION INDUSTRIAL SUPPORT - POST-DELIVERY FUNDING
Aug 6, 2025P00050$4.0MIPDA EXECUTION
Jul 31, 2025A00283$94.9KLPD 29 ADDITIONAL WORK ITEM 8273: UNCLASSIFIED VIDEO SYSTEM (UVS) INSTALLATION - CONTRACT LINE ITEM NUMBER 0010 - FIELD MODIFICATION REQUEST (FMR) 1942
Jul 18, 2025P00049$-3.2MIPDA EXECUTION
Jul 11, 2025A00282$58.7KFIELD MODIFICATION REQUEST (FMR) 1941 TASK 1.17W01 LPD 29 - VENDOR SERVICES FOR LIGHTWEIGHT TEST FOR CONTROLLER CABINET CONTRACT LINE ITEM NUMBER 0010
Jul 2, 2025A00281$605LPD 29 ADDITIONAL WORK ITEM 8304 CONDITION FOUND REPORT 0353 SHIPS SIGNAL EXPLOITATION EQUIPMENT (SSEE) INCREMENT F - TOPSIDE AND STUB MAST ACCOMPLISH - CONTRACT LINE ITEM NUMBER 0010
Jun 20, 2025A00278$11.5KADDITIONAL WORK ITEM 8273 CONDITION FOUND REPORT 5043: UNCLASSIFIED VIDEO SYSTEM (UVS) FORMERLY SBSS ACCOMPLISH) FIELD MODIFICATION REQUEST (FMR) 1937 CONTRACT LINER ITEM NUMBER 0010
Jun 20, 2025A00279$84.4KINDUSTRIAL POST DELIVERY AVAILABILITY EXECUTION LPD 29 ADDITIONAL WORK ITEM (AWI) 2087 GROWTH CONDITION FOUND REPORT (CFR) 0186 KITTING MATERIAL (KM) HIGH TEMPERATURE SUPERCONDUCTING (HTS) VITAL CHILL WATER INSTALL CONTRACT LINE ITEM NUMBER 0010
Jun 20, 2025A00280$19.7KLPD 29 ADDITIONAL WORK ITEM 8299 CONDITION FOUND REPORT 5042 STUD MAST REPLACEMENT ACCOMPLISH CONTRACT LINE ITEM NUMBER 0010
Jun 18, 2025P00048$664.5KIPDA EXECUTION
Jun 9, 2025A00276$22.3KFIELD MODIFICATION REQUEST 1936, ADDITIONAL WORK ITEM 2087 GROWTH LPD 29 CONDITION FOUND REPORT 0351-5041 KITTING MATERIAL HIGH TEMPERATURE SUPERCONDUCTING VITAL CHILL WATER INSTALL, CONTRACT LINE ITEM NUMBER 0010
Jun 9, 2025A00277$543.4KEMERGENT WORK ITEM 0028 KITTING MATERIAL LOAD CENTER AND SWITCHBOARD CIRCUIT BREAKERS CONTRACT LINE ITEM NUMBER 0010 LPD 29 POST DELIVERY
Jun 3, 2025A00275$83.6KFIELD MODIFICATION REQUEST (FMR) 1934 ADDITIONAL WORK ITEM (AWI) 2087GW CONDITION FOUND REPORT (CFR) 5024 KITTING MATERIAL (KM) LPD 29 - HIGH TEMP SUPERCONDUCTING (HTS) VITAL CHILL WATER INSTALL CONTRACT LINE ITEM NUMBER (CLIN) 0010
May 28, 2025P00047$0IPDA EXECUTION
May 27, 2025A00274$33.9KFIELD MODIFICATION REQUEST (FMR) 1933 ADDITIONAL WORK ITEM (AWI) 2087GW CONDITION FOUND REPORT (CFR) 5027 KITTING MATERIAL (KM) LPD 29 - HTS DEGAUSSING SYSTEM AIR COOLER POWER SUPPLY VENTILATION MODIFICATIONS ACCOMPLISH
May 15, 2025AZ0002$115.1KHEADQUARTERS MODIFICATION REQUEST (HMR)431 UNPRICED CHANGE ORDER (UCO) DEFINITIZATION OF A00177 TASK 12.0 REVISION 3 PART D LPD 29 - LPD 17 CLASS CRITICAL CONSUMED MATERIAL PROVIDE CONTRACT LINE ITEM NUMBER (CLIN) 0010
May 13, 2025A00272$38.8KFIELD MODIFICATION REQUEST (FMR) 1932 ADDITIONAL WORK ITEM (AWI) 2087GW CONDITION FOUND REPORT (CFR) 5019 KITTING MATERIAL (KM) LPD 29 HIGH TEMP SUPERCONDUCTING (HTS) VITAL CHILL WATER INSTALL CONTRACT LINE ITEM NUMBER (CLIN) 0010
May 13, 2025A00273$15.5KFIELD MODIFICATION REQUEST 1931 ADDITIONAL WORK ITEM 8304GW CONDITION FOUND REPORT 5021 KITTING MATERIAL LPD 29 SHIPS SIGNAL EXPLOITATION EQUIPMENT INCREMENT F TOPSIDE AND STUBMAST ACCOMPLISH CONTRACT LINE ITEM NUMBER 0010
May 2, 2025A00271$87.8KLPD 29 TASK 1.18 (SSDS ECS INTEGRATION VENDOR SUPPORT PROVIDE - FIELD MODIFICATION REQUEST 1930 CONTRACT LINE ITEM NUMBER 0010
Apr 14, 2025A00270$171.9KADDITIONAL WORK ITEM (AWI) 2087GW CONDITION FOUND REPORT (CFR) 0155 KITTING MATERIAL (KM) LPD 29 HIGH TEMP SUPERCONDUCTING (HTS) VITAL CHILL WATER INSTALL
Apr 9, 2025A00269$0WATERFRONT TASK AUTHORIZATION QUARTER 1 2025 HEADQUARTERS MODIFICATION REQUEST 454
Mar 21, 2025A00268$75.0KWTA POST DELIVERY FUNDING POOL INCREASE $75K
Feb 25, 2025P00046$6.9MIPDA EXECUTION
Feb 5, 2025A00267$167.5KHMR 462 TASK 1.19 R5 HIGH EFFICIENCY SUPER CAPACITY COMMON MODE VOLTAGE DATA COLLECTION
Jan 27, 2025A00264$0WTA Q4 HMR 445 POOL
Jan 27, 2025A00265$0WTA Q4 HMR 454
Jan 27, 2025A00266$12.4KFIELD MODIFICATION REQUEST (FMR) 1924 ADDITIONAL WORK ITEM (AWI) 8162(Y) KITTING MATERIAL (KM) LPD 29 - CARGO WEAPONS ELEVATOR (CWE) NO. 1 AND NO. 2
Jan 23, 2025P00045$1.7MIPDA EXECUTION
Jan 21, 2025A00262$1.1MFIELD MODIFICATION REQUEST (FMR) 1924 ADDITIONAL WORK ITEM (AWI)8162(Y) KITTING MATERIAL (KM) LPD 29 CARGO WEAPONS ELEVATOR (CWE) NO. 1 AND NO. 2 CONTRACT LINE ITEM NUMBER (CLIN) 0010
Jan 21, 2025A00263$0ADMIN MOD TO A00255
Jan 13, 2025A00261$17.0KFMR 1922 EWI 0015-LPD-29- AUXILIARY SEAWATER ASW GAGES PROVIDE. CONTRACT LINE ITEM NUMBER (CLIN) 0010
Jan 6, 2025A00260$121.2KHEADQUARTERS MODIFICATION REQUEST (HMR) 460 ADDITIONAL WORK ITEM (AWI) 2047F KITTING MATERIAL (KM) LPD 29 - FOA KIT AND SHIPPING OF GOVERNMENT FURNISHED MATERIAL (GFM) PROVIDE
Dec 19, 2024P00044$8.1MIPDA EXECUTION
Dec 17, 2024A00255$0LPD 29 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 HEADQUARTERS MODIFICATION REQUEST (HMR) 454. POST DELIVERY WATERFRONT TEAMING AGREEMENT (WTA) QUARTERLY MOD FOR QUARTER 3 2024
Dec 17, 2024A00256$0LPD 29 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010. HEADQUARTERS MODIFICATION REQUEST(HMR) 445. POST DELIVERY WATERFRONT TEAMING AGREEMENT (WTA) QUARTERLY MOD FOR QUARTER 3 2024
Dec 17, 2024A00257$0LPD 29 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 HEADQUARTERS MODIFICATION REQUEST (HMR)433. POST DELIVERY WATERFRONT TEAMING AGREEMENT (WTA) QUARTERLY MOD FOR QUARTER 3 2024
Dec 17, 2024A00258$0LPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION. CONTRACT LINE ITEM NUMBER (CLIN) 0010 HEADQUARTERS MODIFICATION REQUEST (HMR) 403. POST DELIVERY WATERFRONT TEAMING AGREEMENT (WTA) QUARTERLY MOD QUARTER 3 2024
Dec 17, 2024A00259$0LPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 HEADQUARTERS MODIFICATION REQUEST (HMR) 404. POST DELIVERY WATERFRONT TEAMING AGREEMENT (WTA) QUARTERLY MOD FOR QUARTER 3 2024
Dec 9, 2024A00254$88.1KFIELD MODIFICATION REQUEST (FMR) 1920 ENGINEERING CHANGE REQUEST (ECR) 2481 Y KITTING MATERIAL (KM) LPD 29 HM&E NETWORK CABLE PLANT UPDATE ACCOMPLISH
Dec 3, 2024P00043$-2.1MIPDA EXECUTION
Nov 13, 2024A00253$-123.1KHMR 440: CLIN 0010 ADDITIONAL WORK ITEM 2081M01 DEOB FROM CONTRACT MOD A00206 (TOW BOOM MANUFACTURE ACCOMPLISH) N0002421C2443
Nov 7, 2024A00251$43.1KFIELD MODIFICATION REQUEST (FMR) 1919 ADDITIONAL WORK ITEM (AWI) 1575M01 LPD 29 - MAIN PROPULSION DIESEL ENGINE (MPDE) AND SHIPS DIESEL (SSDG) EXPANSION JOINTS REPLACE
Nov 7, 2024A00252$10.6KFIELD MODIFICATION REQUEST (FMR) 1917 ADDITIONAL WORK ITEM (AWI) 8273W01 (KM) LPD 29 - UNCLASSIFIED VIDEO SYSTEM (UVS) INSTALLATION (FORMERLY SBSS) ACCOMPLISH
Oct 28, 2024A00249$78.8KFIELD MODIFICATION REQUEST (FMR) 1918 ADDITIONAL WORK ITEM (AWI) 1242 GROWTH (GW) LPD 29 CONDITION FOUND REPORT (CFR) 3085 KITTING MATERIAL (KM) LOA SUPPORT MATERIAL, PROVIDE. CLIN 0010
Oct 28, 2024A00250$0ADMINISTRATIVE MODIFICATION TO REVISE MODIFICATION A00248 BY CORRECTING THE WORK ITEM NUMBER ON PAGE 2, PART "A" OF THE DESCRIPTION SECTION OF THE SF 30 BLOCK 14 CONTINUATION PAGE.
Oct 9, 2024A00248$19.4KENGINEERING CHANGE REQUEST (ECR) 2654 KITTING MATERIAL (KM) LPD 29 - AIR CONDITIONING (A/C) PLANT AUXILIARY SEAWATER (ASW) HELLAN STRAINER ISOLATION VALVE INSTALL
Oct 1, 2024A00247$57.5KLPD 29 ADDITIONAL WORK ITEM AWI-8305(Y) WI-170-11-002(KM) FWD AN/SPS-73(V)18 NGSSR ANTENNA RELOCATE. FMR 1909. CLIN 0010. ACRN TL
Sep 26, 2024A00245$11.1KFIELD MODIFICATION REQUEST (FMR) 1913 ADDITIONAL WORK ITEM (AWI) 8136W01 KITTING MATERIAL (KM) MOGAS RACK INTERCHANGEABILITY INSTALL
Sep 26, 2024A00246$0ADMINISTRATIVE MODIFICATION TO REVISE MODIFICATION A00243 BY ADDING SECTION A - SOLITICATION/CONTRACT FORM TO THE REVISED SUMMARY OF CHANGES ON PAGE 2 OF THE MODIFICATION AND CORRECTING THE ESTIMATED COST AND FIXED FEE IN SECTION B.
Sep 23, 2024A00244$0INDUSTRIAL POST DELIVERY AVAILABILITY (IDPA) LPD 29 ADMINISTRATIVE MOD TO CORRECT CONTRACT MODIFICATION A00243 ADDITIONAL WORK ITEM (AWI) 1777 KITTING MATERIAL (KM)
Sep 17, 2024A00243$34.4KFIELD MODIFICATION REQUEST (FMR) 1907 ADDITIONAL WORK ITEM (AWI)1777 KITTING MATERIAL (KM) BOAT VALLEY AND RESCUE BOAT POCKET FENDER STOWAGE INSTALL CLIN 0010
Sep 16, 2024A00242$87.0KEMERGENT WORK ITEM EWI-0007 WI-407-11-001(KM) PULSE CURRENT INJECTION (PCI) TESTING FOR HULL PENETRATIONS ACCOMPLISH CLIN 0010
Sep 4, 2024A00240$10.6KLPD 29 ADDITIONAL WORK ITEM (AWI) 8268(Y)GW CONDITION FOUND REPORT (CFR) 3051 & 3056 KITTING MATERIAL (KM) AN/SRC-55B(V) HIERARCHICAL YET DYNAMICALLY REPROGRAMMABLE ARCHITECTURE (HYDRA) INSTALL - FIELD MODIFICATION REQUEST (FMR) 1905
Sep 4, 2024A00241$777.9KCLIN 0010 ACRN KP HEADQUARTERS MODIFICATION REQUEST (HMR)451: ADDITIONAL WORK ITEM AWI-2037 WI-314-31-001(KM) 400 HZ R&P PUCS ADDITION TO WELL DECK AND ELECTRICAL SHOP ACCOMPLISH.
Aug 30, 2024A00236$12.3KFIELD MODIFICATION REQUEST (FMR) 1911 ADDITIONAL WORK ITEM (AWI) 1242PGW CONDITION FOUND REPORTS (CFR) 3249 & 3250 LPD 28 EMERGENT CONEX BOX AND MATERIAL SUPPORT PROVIDE
Aug 30, 2024A00237$-136.3KLPD 28 EMERGENT WORK ITEM (EWI) 0055 KITTING MATERIAL(KM) VENTILATION FAN (SS-62) REPLACE - DEOBLIGATION HEADQUARTERS MODIFICATION REQUEST (HMR) 446
Aug 30, 2024A00238$747FIELD MODIFICATION REQUEST (FMR) 1914 TASK 5.57 TI-0314 FDS EQUIPMENT EMI QUALIFICATION TESTING. CLIN 0010
Aug 30, 2024A00239$18.0KLPD 28 EMERGENT WORK ITEM (EWI) 0036M01 RP KITTING MATERIAL(KM) PORT AND STARBOARD ANCHOR WINDLASS INDICATORS REINSTALL - FIELD MODIFICATION REQUEST (FMR) 1912
Aug 23, 2024A00235$29.0KLPD 28 ADDITIONAL WORK ITEM (AWI) 1242PGW CONDITION FOUND REPORT (CFR) 3247 KITTING MATERIAL (KM) EMERGENT CONEX BOX AND MATERIAL SUPPORT PROVIDE FIELD MODIFICATION REQUEST (FMR) 1906
Aug 22, 2024P00042$3.3MIPDA EXECUTION
Aug 19, 2024A00234$75.0KLPD 29 ESTABLISHING HEADQUARTERS MODIFICATION REQUEST (HMR) 454 WTA POOL FUNDING
Aug 12, 2024A00233$63.7KLPD 29 AWI 1575 KITTING MATERIAL (KM) MAIN PROPULSION DIESEL ENGINE (MPDE) AND SHIP SERVICE DIESEL GENERATORS (SSDG) EXPANSION JOINTS REPLACE - CONTRACT LINE ITEM NUMBER (CLIN) 0010
Aug 6, 2024A00232$0LPD 29 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 HEADQUARTERS MODIFICATION REQUEST (HMR)433. POST DELIVERY WATERFRONT TEAMING AGREEMENT (WTA) QUARTERLY MOD FOR QUARTER 2 2024
Aug 5, 2024A00229$0LPD 29 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 HEADQUARTERS MODIFICATION REQUEST (HMR)445. POST DELIVERY WATERFRONT TEAMING AGREEMENT (WTA) QUARTERLY MOD FOR QUARTER 2 2024
Aug 5, 2024A00230$0LPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 HEADQUARTERS MODIFICATION REQUEST (HMR)403. POST DELIVERY WATERFRONT TEAMING AGREEMENT (WTA) QUARTERLY MOD FOR QUARTER 2 2024
Aug 5, 2024A00231$0LPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 HEADQUARTERS MODIFICATION REQUEST (HMR)404. POST DELIVERY WATERFRONT TEAMING AGREEMENT (WTA) QUARTERLY MOD FOR QUARTER 2 2024
Jul 24, 2024A00227$15.3KFIELD MODIFICATION REQUEST (FMR) 1903 LPD 29 EMERGENT CHANGE REQUEST (ECR) 2664 KITTING MATERIAL (KM) MEDICAL STOREROOM IN CPS ZONE INSTALL CLIN 0010
Jul 24, 2024A00228$-18.4KLPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 FIELD MODIFICATION REQUEST 1877 EMERGENT CHANGE REQUEST(ECR) 2637M02 KITTING MATERIAL (KM) DEOBLIGATION ADDED STORAGE CAPABILITY ACCOMPLISH
Jul 17, 2024A00224$11.2KFIELD MODIFICATION REQUEST (FMR) 1901 EMERGENT CHANGE REQUEST (ECR) 2488(YGW) CFR 3035 (KM) LPD 29 C4I PICT & BRIDGE WING PHONES INSTALLATION ACCOMPLISH
Jul 17, 2024A00225$18.8KFIELD MODIFICATION REQUEST (FMR) 1900 LPD 28 ADDITIONAL WORK ITEM (AWI) 1242 GROWTH WORK - CONDITION FOUND REPORT (CFR) 3100 KITTING MATERIAL (KM) EMERGENT CONEX BOX AND MATERIAL SUPPORT CLIN 0010
Jul 17, 2024A00226$11.7KLPD 28 FIELD MODIFICATION REQUEST (FMR) 1895 TASK 5.40 FIXTURE TEST MPAC AFTERCOOLER SHOCK TEST CLIN 0010
Jul 15, 2024A00223$14.4KFIELD MODIFICATION REQUEST (FMR) 1902 LPD 29 TECHNICAL WORK ITEM (TWI) 0003 KITTING MATERIAL (KM) SHIP SIGNAL EXPLOITATION EQUIPMENT (SSEE) INCREMENT F-BELOW DECK INSTALL
Jul 8, 2024A00221$51.4KFIELD MODIFICATION REQUEST (FMR) 1897 LPD 29 ADDITIONAL WORK ITEM (AWI) 0099 GROWTH WORK (GW) CONDITION FOUND REPORT (CFR) 3027 PROCURE STORAGE CONTAINER & SECURING DEVICE & FMR 1898 AWI 0099 GW CFR 3032 KM
Jul 8, 2024A00222$10.3KFIELD MODIFICATION REQUEST (FMR) 1899 EMERGENT CHANGE REQUEST (ECR) 2488 Y GROWTH WORK (GW) CONDITION FOUND REPORT (CFR) 3029 KITTING MATERIAL (KM) C41 PICT & BRIDGE WING PHONES INSTALLATION ACCOMPLISH
Jul 3, 2024A00220$-127.9KHEADQUARTERS MODIFICATION REQUEST (HMR) 439 ADDITIONAL WORK ITEM (AWI) 2081M01 (KM) TOW BOOM MANUFACTURE ACCOMPLISH & FIELD MODIFICATION REQUEST (FMR) 1876 EMERGENT CHANGE REQUEST (ECR) 2491 (KM) CPS FAN ROOM CLEAN SIDE PLENUM FLOOD MITIGATION
Jun 24, 2024A00219$400.0KLPD 28 EMERGENT WORK ITEM (EWI)-0023 W0102 KITTING MATERIAL (KM: MAIN REDUCTION GEAR NO. 1 OIL FILTER/SEPARATOR EQUIPMENT REPAIR AND FLUSH ACCOMPLISH
Jun 17, 2024A00218$48.9KFIELD MODIFICATION REQUEST (FMR)1896 ENGINEERING CHANGE REQUEST (ECR) 2475 Y KITTING MATERIAL (KM) LPD 29 ADVANCED DAMAGED CONTROL SYSTEM (ADCS) INSTALLATION INDUSTRIAL SUPPORT PROVIDE
Jun 12, 2024A00217$136.3KHEADQUARTERS MODIFICATION REQUEST (HMR) 446 EMERGENT WORK ITEM (EWI) 0055 KITTING MATERIAL (KM) LPD 28 VENTILATION FAN (SS-62) REPLACE
May 29, 2024A00215$75.0KLPD 29 WATERFRONT TASK AUTHORIZATION (WTA) POOL ESTABLISHMENT FOR THE INDUSTRIAL POST DELIVERY AVAILABILITY
May 29, 2024A00216$28.2KLPD 28 FMR 1891 TC EL5113.01 (KM) PARASENSE REFRIGERATOR LEAK MONITOR SENSING LINES INSTALLATION ACCOMPLISH LPD 28 FMR 1890 TC EL5088.01 (KM) PARASENSE REFRIGERATOR LEAK MONITOR SENSING LINES INSTALLATION ACCOMPLISH
May 21, 2024P00041$547.6KIPDA EXECUTION
May 10, 2024P00040$5.6MIPDA EXECUTION
May 8, 2024A00213$14.2KFIELD MODIFICATION REQUEST (FMR) 1892 ADDITIONAL WORK ITEM (AWI) 1242(PGW) LPD 28 CONDITION FOUND REPORT (CFR) 3228 KITTING MATERIAL (KM) EMERGENT CONEX BOX AND MATERIAL SUPPORT PROVIDE
May 8, 2024A00214$6.6KLPD 28 INDUSTRIAL POST DELIVERY (IPDA) EXECUTION TASK WORK ITEM (TWI) 0002PM03 KITTING MATERIAL (KM) SSEE INCREMENT F AN/SSQ-130(V)7 INSTALL
Apr 24, 2024A00210$0LPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IDPA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 HEADQUARTERS MODIFICATION REQUEST (HMR) 404 END COST WATERFRONT TEAMING AGREEMENT (WTA) QUARTERLY MOD FOR QUARTER 1 2024 VARIOUS PRICE PROPOSALS
Apr 24, 2024A00211$0LPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IDPA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 HEADQUARTERS MODIFICATION REQUEST HMR 403 POST DELIVERY WATERFRONT TEAMING AGREEMENT (WTA) QUARTERLY MOD FOR QUARTER 1 2024 VARIOUS PRICE PROPOSALS
Apr 24, 2024A00212$0LPD 29 INDUSTRIAL POST DELIVERY AVAILABILITY (IDPA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 HEADQUARTERS MODIFICATION REQUEST (HMR) 433 POST DELIVERY WATERFRONT AGREEMENT (WTA) QUARTERLY MOD FOR QUARTER 1 2024 VARIOUS PRICE PROPOSALS
Apr 15, 2024A00209$22.7KFIELD MODIFICATION (FMR) 1889 ADDITIONAL WORK ITEM (AWI) 8299 GROWTH WORK (GW) LPD 28 CONDITION FOUND REPORT (CFR) 3207 KITTING MATERIAL (KM) STUB MAST CABLES REPLACE
Apr 3, 2024A00208$19.8KFIELD MODIFICATION REQUEST (FMR) 1886 ADDITIONAL WORK ITEM (AWI) 2078 GROWTH WORK (GW) LPD 29 CONDITION FOUND REPORT (CFR) 2979 KITTING MATERIAL (KM) UPGRADE OF BULKHEAD AND OVERHEAD INSULATION TO N-30 INSTALL
Mar 29, 2024A00207$24.5KFIELD MODIFICATION REQUEST (FMR) 1887 EMERGENT WORK ITEM (EWI) 0052 KITTING MATERIAL (KM) LPD 28 STERN TUBE COOLING AND FLUSH SYSTEM AND FLOW METERS PROCURE AND PROVIDE
Mar 18, 2024A00205$210.2KHEADQUARTERS MODIFICATION REQUEST (HMR) 438 LPD 29 EMERGENT CHANGE REQUEST (ECR) 2467 Y KITTING MATERIAL (KM) CARGO WEAPONS ELEVATOR (CWE) EMERGENCY ORDNANCE HANDLING (EOH) SYSTEM INSTALL
Mar 18, 2024A00206$127.9KHEADQUARTERS MODIFICATION REQUEST (HMR) 440 ADDITIONAL WORK ITEM (AWI) 2081 KITTING MATERIAL (KM) LPD 29 TOW BOOM MANUFACTURE ACCOMPLISH
Mar 13, 2024P00039$371.6KIPDA EXECUTION
Mar 11, 2024A00203$127.9KHEADQUARTERS MODIFICATION REQUEST (HMR) 439 LPD 28 ADDITIONAL WORK ITEM (AWI) 2081 KITTING MATERIAL (KM) TOW BOOM MANUFACTURE ACCOMPLISH
Mar 11, 2024A00204$23.6KFIELD MODIFICATION REQUEST (FMR) 1883 EMERGENT CHANGE REQUEST (ECR) 2620 Y LPD 29 KITTING MATERIAL (KM) MK 2 MOD 2E ADDITION OF SYNCHRO GENERATORS AND IFF VIDEO INVERTERS INDUSTRIAL SUPPORT
Mar 6, 2024A00202$17.8KFIELD MODIFICATION REQUEST (FMR) 1879 LPD 29 ADDITIONAL WORK ITEM (AWI) 0016: SUPPORT TEAMS FACILITY ASHORE PROVIDE
Mar 4, 2024A00199$19.0KFIELD MODIFICATION REQUEST (FMR) 1877 EMERGENT CHANGE REQUEST (ECR) 2637M01 LPD 28 (KM) WORK ITEM 672-11-001 ADDED STORAGE CAPABILITY ACCOMPLISH
Mar 4, 2024A00200$18.9KFIELD MODIFICATION REQUEST (FMR) 1878 EMERGENT WORK ITEM (EWI) 0039W01 LPD 28 HIGH TEMPERATURE SUPERCONDUCTING DEGAUSSING SYSTEM CHILLED WATER PIPING TEMPORARY FILTER INSTALLATION ACCOMPLISH
Mar 4, 2024A00201$37.9KINDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 FIELD MODIFICATION REQUEST (FMR) 1874 LPD 28 AWI 8299GW CFR 3101 (KM) (STUB MAST REPLACEMENT ACCOMPLISH)
Feb 28, 2024A00198$29.5KFIELD MODIFICATION REQUEST (FMR) 1876 EMERGENT CHANGE REQUEST (ECR) 2491 KITTING MATERIAL (KM) LPD 28 CPS FAN ROOM CLEAN SIDE PLENUM FLOOD MITIGATION
Feb 21, 2024A00197$11.2KFIELD MODIFICATION REQUEST (FMR) 1880 ADDITIONAL WORK ITEM (AWI) 8299M01 STUB MAST REPLACEMENT ACCOMPLISH
Feb 16, 2024A00196$36.8KFIELD MODIFICATION REQUEST (FMR) 1865 ADDITIONAL WORK ITEM (AWI) 1305 EXECUTION MATERIAL (EM) LPD 29 MEDICAL SURGICAL LIGHTS INSTALL
Feb 6, 2024A00195$15.5KFIELD MODIFICATION REQUEST (FMR) 1871 EMERGENT CHANGE REQUEST (ECR) 2664 KITTERING MATERIAL (KM) MEDICAL STOREROOM IN CPS ZONE INSTALL
Jan 31, 2024A00194$15.3KLPD INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 FIELD MODIFICATION REQUEST (FMR) 1873 LPD 28 AWI-1242PGW CFR-3103(KM) EMERGENT CONEX BOX AND MATERIAL SUPPORT PROVIDE
Jan 26, 2024A00193$-647LPD 29 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 FIELD MODIFICATION REQUEST 1847 (ECR) 2488 (Y) (CFR)-2975 KITTING MATERIAL(KM) DEOBLIGATION C4I PICT & BRIDGE WING PHONES INSTALLATION ACCOMPLISH
Jan 11, 2024A00190$0LPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 HEADQUARTERS MODIFICATION REQUEST HMR 403 POST DELIVERY WATERFRONT TASK AGREEMENT (WTA) QUARTERLY MOD FOR QUARTER 4 2023 VARIOUS PRICE PROPOSALS
Jan 11, 2024A00191$0LPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 HEADQUARTERS MODIFICATION REQUEST HMR 404 END COST WATERFRONT TEAMING AGREEMENT (WTA) QUARTERLY MOD FOR QUARTER 4 2023 VARIOUS PRICE PROPOSALS
Jan 11, 2024A00192$120.3KLPD INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 HEADQUARTERS MODIFICATION REQUEST (HMR) 429 LPD 29 AWI 1242 REV A RP LOA SUPPORT MATERIAL
Dec 20, 2023A00187$48.7KINDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 FIELD MODIFICATION REQUEST (FMR) 1869 LPD 29 AWI 8297 KITTING MATERIAL (SHIPBOARD BROADCAST AND SURVEILLANCE SYSTEM (SBSS), 30TV HABITABILITY SPACES INSTALL
Dec 20, 2023A00188$27.5KFIELD MODIFICATION REQUEST (FMR) 1867 LPD 29 ADDITIONAL WORK ITEM (AWI) 2066W REVISION A KITTING MATERIAL (KM) ARMORY DOOR ISSUE POINT INSTALL
Dec 20, 2023A00189$119.5KHEADQUARTERS MODIFICATION REQUEST (HMR) 437 LPD 29 ADDITIONAL WORK ITEM (AWI) 2078 KITTERING MATERIAL (KM) UPGRADE OF BULKHEAD AND OVERHEAD INSULATION TO N-30 INSTALL
Dec 15, 2023P00038$13.2MIPDA EXECUTION
Dec 13, 2023A00186$19.5KLPD INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 FIELD MODIFICATION REQUEST (FMR) 1866 LPD 29 AWI 2075 KM (SECURITY FORCE ISSUE ROOM ACCESS CORRECTIONS ACCOMPLISH)
Dec 11, 2023A00185$75.0KINDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 HEADQUARTERS MODIFICATION REQUEST (HMR) 433 LPD 29 POST DELIVERY WTA POOL ESTABLISHMENT
Dec 11, 2023P00037$0IPDA EXECUTION
Dec 7, 2023A00184$5.6KINDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 FIELD MODIFICATION REQUEST (FMR)1862 LPD 29 AWI 1034 Y (INDUSTRIAL SUPPORT FOR MAN OVERBOARD INDICATOR (MOBI) SYSTEM INSTALLATION PROVIDE
Dec 4, 2023P00036$0IPDA EXECUTION
Nov 20, 2023P00035$-2.1MIPDA EXECUTION
Oct 30, 2023A00182$77.2KLPD INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 FIELD MODIFICATION REQUEST (FMR) 1861 LPD 28 EWI 0026M01 ORIGINAL EQUIPMENT MANUFACTURER (OEM) SERVICES OF CALEY DAVIT PROVIDE
Oct 30, 2023A00183$301.2KHEADQUARTERS MODIFICATION REQUEST (HMR) 432 ADDITIONAL WORK ITEM (AWI) 1922 KITTERING MATERIAL (KM) MAIN PROPULSION DIESEL ENGINE (MPDE) EXHAUST BELLOWS REMOVABLE INSULATION PAD FABRICATE
Oct 10, 2023A00181$0INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) LPD 28 AND 29 ADMINISTRATIVE MOD TO CORRECT CONTRACT MODIFICATIONS A00166 ADDITIONAL WORK ITEM (AWI) 2076 LPD 29, A00172 ADDITIONAL WORK ITEM (AWI) 1242 LPD 28, AND A00180 TASK WORK ITEM (AWI) 0002 LPD 28
Oct 10, 2023P00034$3.5MIPDA EXECUTION
Sep 29, 2023A00178$1.1MHEADQUARTERS MODIFICATION REQUEST (HMR) 428 ADDITIONAL WORK ITEM (AWI) 1996 KITTERING MATERIAL (KM) MAIN PROPULSION DIESEL ENGINE (MPDE) EXHAUST BELLOWS NORDLOCK HARDWARE UPGRADE
Sep 29, 2023A00179$13.7KLPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 FIELD MODIFICATION REQUEST (FMR) 1854 LPD 28 TWI 002 CFRS 0868, 3061, 0919, 3044, AND MOD 02
Sep 29, 2023A00180$6.2KLPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) TASK WORK ITEM (TWI) 0002 CFR 3082 KITTING MATERIAL (KM): SHIPS SIGNAL EXPLOITATION EQUIPMENT (SSEE) INCREMENT F AN/SSQ-130(V)7 INSTALL
Sep 28, 2023A00174$0LPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 HEADQUARTERS MODIFICATION REQUEST HMR 403 POST DELIVERY WATERFRONT TEAMING AGREEMENT (WTA) QUARTERLY MOD FOR QUARTER 3 2023 VARIOUS PRICE PROPOSALS
Sep 28, 2023A00175$0LPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 HEADQUARTERS MODIFICATION REQUEST HMR 404 END COST WATERFRONT TEAMING AGREEMENT (WTA) QUARTERLY MOD FOR QUARTER 3 2023 VARIOUS PRICE PROPOSALS
Sep 28, 2023A00176$11.9KFUNDING ONLY COST-OVERRUN MODIFICATION FOR TWI 0002 LPD 28 POST DELIVERY
Sep 28, 2023A00177$439.8KLPD 29 INDUSTRIAL POST DELIVERY AVAILABILITY TASK 12.0 REVISION 3 PART D UNPRICED CHANGE ORDER CONSUMED CRITICAL SPARES
Sep 26, 2023A00171$81.0KLPD 29 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) FIELD MODIFICATION REQUEST (FMR)1859 TASK 12.0 REVISION 3 PART C LPD 17 CLASS CRITICAL CONSUMED MATERIAL PROVIDE
Sep 26, 2023A00172$12.1KLPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) ADDITIONAL WORK ITEM (AWI) 1242 GROWTH KITTING MATERIAL(KM): EMERGENT CONEX BOX AND MATERIAL SUPPORT PROVIDE
Sep 26, 2023A00173$75.0KLPD 28 IPDA HMR 403 POST DELIVERY FUNDING POOL PLUS UP $75K
Sep 22, 2023A00168$10.7KFIELD MODIFICATION REQUEST (FMR) 1857 LPD 29 TASK 12.0 REVISION 3 PART B LPD 17 CLASS CRITICAL CONSUMED MATERIAL PROVIDE
Sep 22, 2023A00169$6.5KINDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 FIELD MODIFICATION REQUEST (FMR) 1844 FMR 1853 LPD 29 AWI 1898 KM (SHIPS STORE COOLERS INSTALL)
Sep 22, 2023A00170$3.4KLPD 29 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EMERGENT CHANGE REQUEST (ECR) 2642 KITTING MATERIAL (KM): RELOCATION OF FLUXGATE MAGNETIC COMPASS ACCOMPLISH.
Sep 21, 2023A00167$28.2KFIELD MODIFICATION REQUEST (FMR) 1857 TASK 12.0 REVISION 3 PART A LPD 17 CLASS CRITICAL CONSUMED MATERIAL PROVIDE
Sep 20, 2023A00164$40.1KLPD 29 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EMERGENT CHANGE REQUEST (ECR) 2488Y KITTING MATERIAL (KM): C41 PICT AND WING PHONES INSTALLATION ACCOMPLISH
Sep 20, 2023A00165$1.4KFIELD MODIFICATION REQUEST (FMR) 1845 LPD 29 EWI 0001 KITTING MATERIAL (KM) MK46 & RAM LAUNCHERS FALL PROTECTION INSTALL
Sep 20, 2023A00166$1.8KLPD 29 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) ADDITIONAL WORK ITEM (AWI) 2076 KITTING MATERIAL (KM): ACTIVATION READY SERVICE MAGAZINE TABLE BENCH CORRECTIONS PROVIDE
Sep 15, 2023A00163$30.8KFIELD MODIFICATION REQUEST (FMR) 1851 EMERGENT WORK ITEM (EMI) 0032 KITTERING MATERIAL (KM) AFT LOWER-V RAMP WIRE ROPE REPLACEMENT ACCOMPLISH
Sep 13, 2023A00162$3.7KLPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 FIELD MODIFICATION REQUEST (FMR) 1844 AWI 1632KM (LPD 29) BOAT DAVIT ZERK REPLACEMENT AND LUBRICATION ACCOMPLISH
Sep 6, 2023A00161$35.0KLPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 FIELD MODIFICATION REQUEST (FMR) 1846 EWI 0020RP KM (LPD 28) CARGO WEAPONS ELEVATOR NO.1 (CWE) SOFT PATCH INSTALL
Aug 9, 2023A00159$12.8KINDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) LPD 29 ADVANCED WORK ITEM (AWI) 2024 KITTING MATERIAL (KM): CHILL WATER REDUNDANT SUPPLY FOR DEBARK CONTROL CENTER, RADAR ROOM NO. 2 & RAM LAUNCHER CONTROL ROOM NO. 2 ZONE ALIGNMENT ACCOMPLISH
Aug 9, 2023A00160$0INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) LPD 28 ADMINISTRATIVE MOD TO CORRECT TO AND FROM CUMULATIVE TOTAL FOR CONTRACT MODIFICATIONS A00147 ADDITIONAL WORK ITEM (AWI) 8275GW CFR 3062 AND A00148 ADDITIONAL WORK ITEM (AWI) 2075 W01
Jul 31, 2023A00158$35.6KINDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) LPD 32 TASK 5.46.2 (LONG LEAD TIME MATERIAL (LLTM) NON-RECURRING ENGINEERING FOR LOW PRESSURE AIR COMPRESSOR PROVIDE
Jul 27, 2023P00033$922.6KPOP ADMINISTRATIVE CORRECTION
Jul 24, 2023A00157$20.6KLPD 29 INDUSTRIAL POST DELIVERY AVAILABILITY FOR EMERGENT CHANGE REQUEST (ECR) 2584 Y KITTING MATERIAL (KM): AUTOMATIC IDENTIFICATION SYSTEM (AIS) INSTALL
Jul 17, 2023A00155$11.2KFIELD MODIFICATION REQUEST (FMR) 1833 ADVANCED WORK ITEM (AWI) 1906 Y KITTING MATERIAL (KM) MEDICAL IMAGING INDUSTRIAL SUPPORT PROVIDE
Jul 17, 2023A00156$154.0KINDUSTRIAL POST DELIVERY AVAILABILITY LPD 28 AWI 2047P PSA KIT AND SHIPPING OF GOVERNMENT FURNISHED MATERIAL (GFM) PROVIDE
Jul 12, 2023A00153$31.8KINDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) LPD 28: ADVANCED WORK ITEM FOR FIELD MODIFICATION REQUEST 1835 REPRICE 1 STUB MAST REPLACEMENT ACCOMPLISH
Jul 12, 2023A00154$2.3KFIELD MODIFICATION REQUEST (FMR) 1836 ADDITIONAL WORK ITEMS (AWI) 1955 KITTERING MATERIAL (KM) DEFENSE ADVANCED GPS RECEIVER (DAGR) INSTALL
Jul 10, 2023A00152$0LPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 HEADQUARTERS MODIFICATION REQUEST HMR 404 END COST WATERFRONT TEAMING AGREEMENT (WTA) QUARTERLY MOD FOR QUARTER 2 2023 VARIOUS PRICE PROPOSALS
Jul 6, 2023P00032$8.2MFUNDING AND PIO APPROVAL THRESHOLD.
Jul 5, 2023A00151$7.4KFIELD MODIFICATION REQUEST (FMR) 1829 LPD 29 ADDITIONAL WORK ITEM (AWI) 1303 Y KITTERING MATERIAL (KM) INSTALLATION OF TELERADIOLOGY MEDWEB INDUSTRIAL SUPPORT
Jul 3, 2023A00150$0LPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 HEADQUARTERS MODIFICATION REQUEST HMR 403 POST DELIVERY WATERFRONT TEAMING AGREEMENT (WTA) QUARTELY MOD FOR QUARTER 2 2023 VARIOUS PRICE PROPOSALS
Jun 29, 2023A00149$20.3KLPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 FIELD MODIFICATION REQUEST (FMR) 1826 AWI 1242 P KM (EMERGENT CONEX BOX AND MATERIAL SUPPORT PROVIDE)
Jun 28, 2023P00031$963.0KIPDA EXECUTION
Jun 27, 2023A00147$10.5KLPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) ADDITIONAL WORK ITEM (AWI) 8275 GROWTH KITTING MATERIAL (KM): SHIPBOARD BROADCAST AND SURVEILLANCE SYSTEM PHASE 4 INSTALL
Jun 27, 2023A00148$17.4KLPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) ADVANCED WORK ITEM 2075W01 KITTING MATERIAL (KM) SECURITY FORCE ISSUE ROOM ACCESS CORRECTIONS ACCOMPLISH
Jun 16, 2023A00144$28.6KLPD 29 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 FIELD MODIFICATION REQUEST (FMR) 1828 AWI 1573 (ESCAPE TRUNK LADDER RUNG SAFETY ACCOMPLISH)
Jun 16, 2023A00145$4.2KLPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EMERGENT CHANGE REQUEST (ECR) 2464C GROWTH KITTING MATERIAL (KM): HIGH TEMPERATURE SUPERCONDUCTING (HTS) DEGAUSSING SYSTEM INSTALLATION (HABITABILITY SPACES) INDUSTRIAL SUPPORT
Jun 16, 2023A00146$279.9KLPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EMERGENT CHANGE REQUEST (ECR) ADDED STORAGE CAPABILITY ACCOMPLISH
Jun 14, 2023A00143$33.0KLPD 29 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 FIELD MODIFICATION REQUEST (FMR) 1824 AWI 2040 KM (MICRO-MINIATURE WORK STATION PROVIDE)
Jun 5, 2023A00138$-90.9KLPD 28 ECR 2450P M02 KITTING MATERIAL: READY SERVICE LOCKER (RSL) ADDITION, BLASTING CAP STOWAGE, AND FORCE PROTECTION STOREROOM REDLINES ACCOMPLISH) INDUSTRIAL POST DELIVERY AVAILABILITY
Jun 5, 2023A00139$5.5KLPD 28 ADDITIONAL WORK ITEM (AWI) 1406 KITTING MATERIAL (KM): WEATHER DECK DRAINAGE MODIFICATION ACCOMPLISH) INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EFFORT
Jun 5, 2023A00140$9.9KLPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 FIELD MODIFICATION REQUEST (FMR) 1815 ECR 2553YGW CFR 3074 (IDENTIFY FRIEND OR FOE (IFF) ANTENNA RELOCATION ACCOMPLISH)
Jun 5, 2023A00141$36.2KLPD 29 AN/SRC-55B(V) HIERARCHICAL YET DYNAMICALLY REPROGRAMMABLE ARCHITECTURE (HYDRA) INSTALLATION INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA)
Jun 5, 2023A00142$13.6KLPD 28 ADDITIONAL WORK ITEM 1305 KITTING MATERIAL: MEDICAL SURGICAL LIGHTS INSTALLATION INDUSTRIAL POST DELIVERY AVAILABILITY
May 23, 2023A00137$3.2KLPD 28 ENGINEERING CHANGE REQUEST 2620 (SHIP SELF DEFENSE SYSTEM ADDITION OF SYNCHRO GENERATORS AND IDENTIFICATION FRIEND OR FOE (IFF) VIDEO INVERTER INDUSTRIAL SUPPORT)
May 18, 2023A00136$3.2KLPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 FIELD MODIFICATION REQUEST (FMR) 1817 ECR 2642 KM (RELOCATION OF FLUXGATE MAGNETIC COMPASS ACCOMPLISH)
May 10, 2023A00135$26.0KLPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 FIELD MODIFICATION REQUEST (FMR) 1813 AWI 2066W0102 KM (ARMORY DOOR ISSUE POINT INSTALL)
Apr 24, 2023P00030$742.6KDEOBLIGATION/OBLIGATION
Apr 5, 2023A00131$0LPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 HEADQUARTERS MODIFICATION REQUEST HMR 404 WATERFRONT TEAMING AGREEMENT (WTA) QUARTELY MOD FOR QUARTER 1 2023 VARIOUS PRICE PROPOSALS
Apr 5, 2023A00132$0LPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 HEADQUARTERS MODIFICATION REQUEST HMR 403 POST DELIVERY WATERFRONT TEAMING AGREEMENT (WTA) QUARTELY MOD FOR QUARTER 1 2023 VARIOUS PRICE PROPOSALS
Apr 5, 2023A00133$5.0KLPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 FIELD MODIFICATION REQUEST (FMR) 1809 TASK 5.52 (PROPELLED EXTINGUISHING AGENT TECHNOLOGIES (PEAT) PMS DRAWING PROVIDE)
Apr 5, 2023A00134$4.9KLPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 FIELD MODIFICATION REQUEST (FMR) 1805 ECR 2481 (Y) CFR 3042 KM (ADDITIONAL CABLE TO RECEIVE WHOLE REEL)
Apr 3, 2023A00130$8.9KADDITIONAL WORK ITEM 1947 KITTING MATERIAL SHIP SERVICE DIESEL GENERATOR (SSDG) CRANKCASE PRESSURE TRANSDUCER SENSOR RELIEF INSTALL
Mar 29, 2023A00127$16.3KLPD 28 INDUSTRIAL POST DELIVERY AVAILABILITY (IPDA) EXECUTION CONTRACT LINE ITEM NUMBER (CLIN) 0010 FIELD MODIFICATION REQUEST (FMR)1803 AWI 2074 KM: (PROPELLED EXTINGUISHING AGENT TECHNOLOGY (PEAT) CABLING UPGRADE INSTALL)
Mar 29, 2023A00128$6.7KFIELD MODIFICATION REQUEST (FMR) 1810 TASK 5.50 REVISION 1 400HZ POINT OF USE CONVERTER (PUC) TESTING SHIPPING
Mar 29, 2023A00129$23.6KLPD 28 ADDITIONAL WORK ITEM (AWI)8273 DELTA COST (DC) CONDITION FOUND REPORTS (CFR)0240/0241/0242/0243 GOVERNMENT FURNISHED MATERIAL CABLE SHORTAGES, DAMAGE, & DISCREPANCY &8273DC CFR 3035 FIBER OPTIC CABLE

Estimated positioning window

Nov 1, 2026 – Jan 30, 2027

Recompete signal:
75/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 75/100. Available recorded signals: 70 points.

Contract end 2027-02-01 (92 days from calculation)
+35 points
2 historical awards in this buyer and category group
+10 points
357 recorded award transactions
+10 points
Latest award action: 2026-04-24
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.