Federal contract award

N0002423C2307

CONSTRUCTION OF DDG 51 SHIPS FY23-27

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeSUP OF SHIPBUILDING CONV AND REPAIR
NAICS336611 — Ship Building and Repairing
PSC1905 — Combat Ships and Landing Vessels
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIXED PRICE INCENTIVE
Obligations$8.5B
Current contract value$9.9B
Potential contract value / ceiling$16.0B
Start dateAug 1, 2023
Current end dateFeb 28, 2034
Potential end dateFeb 28, 2034
Latest award activityJun 2, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 198 of 198 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 9, 2026A00169$586CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG147 FIRM FY27 DDG150
Jun 2, 2026A00168$0CONSTRUCTION OF DDG 51 SHIP
May 29, 2026A00165$1.7KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG150
May 29, 2026A00166$66.7KCONSTRUCTION OF DDG 51 SHIP
May 29, 2026A00167$0CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG150
May 27, 2026A00164$34.0KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146
May 22, 2026A00162$117CONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
May 22, 2026A00163$1.3MCONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
May 21, 2026A00161$111CONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
May 20, 2026AZ0002$4.9MCONSTRUCTION OF DDG 51 SHIP DEFINITIZE 51 2059 FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG150
May 15, 2026A00160$117CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG150
May 13, 2026A00157$0CONSTRUCTION OF DDG 51 SHIP J3 SCHEDULE A UPDATE FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG150
May 13, 2026A00158$175.2KCONSTRUCTION OF DDG 51 SHIP UNPRICED CHANGE ORDER WF3762 FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG150
May 13, 2026A00159$14.8KCONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
May 8, 2026A00155$25.1KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG 150
May 8, 2026A00156$0CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG150
May 7, 2026A00152$13.3KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG147 FIRM FY27 DDG150
May 7, 2026A00153$0CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG147 FIRM FY27 DDG150
May 7, 2026A00154$115CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG147 FIRM FY27 DDG150
May 6, 2026P00026$1.3BCONSTRUCTION OF DDG 51 SHIP
Mar 31, 2026P00025$40.0MCONSTRUCTION OF DDG 51 SHIP
Mar 26, 2026A00150$0CONSTRUCTION OF DDG 51 SHIP
Mar 26, 2026A00151$24.0KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Mar 25, 2026A00148$-102.5KCONSTRUCTION OF DDG 51 SHIP WF3752 ACCOMPLISH CLEANUP OF MYP23 1423S FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG150
Mar 25, 2026A00149$757CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG147 FIRM FY27 DDG150
Mar 24, 2026A00147$117CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG147 FIRM FY27 DDG150
Mar 6, 2026P00024$0CONSTRUCTION OF DDG 51 SHIP
Feb 19, 2026A00144$0CONSTRUCTION OF DDG 51 SHIP
Feb 19, 2026A00145$771.0KCONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Feb 19, 2026A00146$14.4KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG147 FIRM FY27 DDG150
Feb 13, 2026A00142$0CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG150
Feb 13, 2026A00143$21.1KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Feb 2, 2026A00140$0CONSTRUCTION OF DDG 51 SHIP
Feb 2, 2026A00141$113CONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Feb 2, 2026AZ0001$60.2KCONSTRUCTION OF DDG 51 SHIP
Jan 30, 2026A00139$4.3KCONSTRUCTION OF DDG 51 SHIP ECP DB-3725C1 FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG150
Dec 19, 2025A00138$4.5KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG147 FIRM FY27 DDG150
Dec 18, 2025A00137$-266.6KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG150
Dec 9, 2025A00136$0CONSTRUCTION OF DDG 51 SHIP
Dec 5, 2025P00023$-12.1MCONSTRUCTION OF DDG 51 SHIP
Nov 21, 2025A00134$0CONSTRUCTION OF DDG 51 SHIP
Nov 21, 2025A00135$27.7KCONSTRUCTION OF DDG 51 SHIP
Nov 5, 2025A00133$189.1KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG147 FIRM FY27 DDG150
Oct 24, 2025A00132$113CONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Oct 22, 2025A00129$113CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Oct 22, 2025A00130$113CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Oct 22, 2025A00131$-4.0KCONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Oct 3, 2025A00128$47.5KCONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Oct 2, 2025A00126$113CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG147 FIRM FY27 DDG150
Oct 2, 2025A00127$59.2KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG147 FIRM FY27 DDG150
Sep 22, 2025A00125$0CONSTRUCTION OF DDG 51 SHIP
Sep 18, 2025A00124$0CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Sep 5, 2025A00123$1.2KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG147 FIRM FY27 DDG150
Sep 3, 2025A00121$22.1KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG147 FIRM FY27 DDG150
Sep 3, 2025A00122$484CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Aug 29, 2025A00120$0CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Aug 26, 2025P00022$0CONSTRUCTION OF DDG 51 SHIP
Aug 19, 2025A00119$0CONSTRUCTION OF DDG 51 SHIP Q2 RBP 2025 FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143
Aug 14, 2025A00118$11.2KCONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Aug 12, 2025P00021$0CONSTRUCTION OF DDG 51 SHIP
Aug 6, 2025A00117$0CONSTRUCTION OF DDG 51 SHIP Q2 2025 FAST TRACK DDG 141-142 PP-5572 DDG 141,DDG 142,DDG 143,DDG 145,DDG 147,AND DDG 149 PP-5585
Aug 4, 2025P00020$0CONSTRUCTION OF DDG 51 SHIP
Aug 1, 2025A00116$0CONSTRUCTION OF DDG 51 SHIP
Jul 22, 2025A00115$113CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG147 FIRM FY27 DDG149
Jul 21, 2025A00114$17.4KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Jul 9, 2025A00112$30.7KCONSTRUCTION OF DDG 51 SHIP
Jul 9, 2025A00113$113CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Jul 2, 2025A00111$0CONSTRUCTION OF DDG 51 SHIP
Jun 30, 2025A00109$113CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Jun 30, 2025A00110$17.3KCONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Jun 26, 2025A00107$12.7KCONSTRUCTION OF DDG 51 SHIP
Jun 26, 2025A00108$238.4KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146
Jun 17, 2025P00019$-36.2MCONSTRUCTION OF DDG 51 SHIP
Jun 11, 2025A00103$113CONSTRUCTION OF DDG 51 SHIP
Jun 11, 2025A00104$113CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG147 FIRM FY27 DDG149
Jun 11, 2025A00105$113CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG147 FIRM FY27 DDG149
Jun 11, 2025A00106$89.4KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Jun 3, 2025P00018$0CONSTRUCTION OF DDG 51 SHIP
May 29, 2025P00017$-20.3MCONSTRUCTION OF DDG 51 SHIP
May 28, 2025A00101$24.1KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
May 28, 2025A00102$107.3KCONSTRUCTION OF FY 23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
May 21, 2025A00098$0CONSTRUCTION OF DDG 51 SHIP
May 21, 2025A00099$-6.7KCONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
May 21, 2025A00100$0FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143
May 16, 2025A00097$20.2KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143
May 15, 2025A00095$0CONSTRUCTION OF DDG 51 SHIP
May 15, 2025A00096$113CONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
May 14, 2025A00094$113CONSTRUCTION OF DDG 51 SHIP PP-5573 DDG 141-DDG 143
May 13, 2025A00091$13.1KCONSTRUCTION OF DDG 51 SHIP
May 13, 2025A00092$47.0KCONSTRUCTION OF FY24 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
May 13, 2025A00093$19.2KCONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
May 9, 2025P00016$2.5BCONSTRUCTION OF DDG 51 SHIP
Apr 18, 2025A00089$-53.9KCONSTRUCTION OF DDG 51 SHIP WF-3701R1 DDG 141-DDG 149
Apr 18, 2025A00090$4.1KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Apr 18, 2025P00015$7.6MCONSTRUCTION OF DDG 51 SHIP
Apr 17, 2025A00086$-140.4KCONSTRUCTION OF FY24 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Apr 17, 2025A00087$247.5KCONSTRUCTION OF FY25 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Apr 17, 2025A00088$0CONSTRUCTION OF DDG 51 SHIP Q1 2025 FAST TRACK DDG 141-DDG 149
Apr 16, 2025A00084$0CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Apr 16, 2025A00085$-2.3KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG 141 OPTION FY23 DDG 142 FIRM FY24 DDG 143 FIRM FY25 DDG 145 FIRM FY25-2 DDG 146 FIRM FY26 DDG 147 FIRM FY27 DDG 149
Apr 15, 2025A00083$107CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142
Apr 14, 2025P00014$0CONSTRUCTION OF DDG 51 SHIP
Apr 7, 2025A00082$113CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Apr 4, 2025A00079$-1.1KCONSTRUCTION OF DDG 51 SHIP DB-3706 DDG 141-149
Apr 4, 2025A00080$113CONSTRUCTION OF DDG 51 SHIP WF-3690
Apr 4, 2025A00081$0CONSTRUCTION OF DDG 51 SHIP
Apr 3, 2025A00078$24.0KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Apr 1, 2025A00077$81.5KCONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Mar 28, 2025A00076$3.9MCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143
Mar 27, 2025A00075$0FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Mar 24, 2025A00074$22.5KCONSTRUCTION OF DDG 51 SHIP PR-162314 DDG 141 AF
Mar 19, 2025A00073$14.4KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142
Mar 18, 2025A00071$113CONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Mar 18, 2025A00072$0CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Mar 13, 2025A00070$-3.2KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Mar 7, 2025A00066$217.8KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Mar 7, 2025A00067$113CONSTRUCTION OF FY 23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Mar 7, 2025A00068$1.3KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Mar 7, 2025A00069$13.7KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142
Feb 28, 2025A00064$0CONSTRUCTION OF DDG 51 SHIP Q4 FAST TRACK 2024
Feb 28, 2025A00065$0CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Feb 25, 2025A00063$113CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142
Feb 24, 2025A00062$0FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Feb 20, 2025A00061$303.0KCONSTRUCTION OF FY 32 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Feb 19, 2025A00057$-35.1KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Feb 19, 2025A00058$761.2KCONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Feb 19, 2025A00059$113CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Feb 19, 2025A00060$3.8KCONSTRUCTION OF DDG 51 SHIP
Feb 12, 2025A00056$304.2KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Feb 11, 2025A00055$0CONSTRUCTION OF FY24 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Jan 15, 2025A00054$2.2KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Jan 6, 2025A00053$0CONSTRUCTION OF FY24 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Dec 19, 2024A00050$0CONSTRUCTION OF DDG 51 SHIP
Dec 19, 2024A00051$7.1KPR-162317 INSTALL DOOR RELEASE PUSH BUTTON IN CSMC 01-130-0-C CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Dec 19, 2024A00052$561.5KCONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Dec 13, 2024A00045$107CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 PP-5555 CSE PURCHASE SPECIFICATION 314-10A, 4160/460 VAC SHIP SERVICE TRANSFORMERS CSE ECP 314-10A-C013, 4160/460 VAC REGULATION UPDATE
Dec 13, 2024A00046$16.4KCONSTRUCTION OF DDG 51 SHIP
Dec 13, 2024A00047$21.2KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149 WF-3694 - INSTALL AN/SQQ-89 & IFF CUTOUT SWITCHES IN SAME SPACES AS EQUIPMENT
Dec 13, 2024A00048$107CONSTRUCTION OF DDG 51 SHIPFIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Dec 13, 2024A00049$26.3KCONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Dec 10, 2024A00043$107CONSTRUCTION OF DDG 51 SHIP
Dec 10, 2024A00044$5.1KPR-162316 - PORTABLE HOSE VALVE ASSEMBLY STOWAGE CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Nov 20, 2024A00041$107CONSTRUCTION OF DDG 51 SHIP PP-5559 - CSE PURCHASE SPECIFICATION 310-02A, SHIP SERVICE GAS TURBINE GENERATORS CSE ECP 310-02A-C042, ENGINE LIFT BAR REDESIGN
Nov 20, 2024A00042$217CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Nov 19, 2024A00039$0CONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Nov 19, 2024A00040$107PP-5558 CSE PURCHASE SPECIFICATION 541-10A, FUEL TRANSFER PURIFIER CSE ECP 541-10A-N008, INVOKE SDRL E50 CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142
Nov 4, 2024A00038$0CONSTRUCTION OF FY26 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Nov 1, 2024P00013$-927.3KCONSTRUCTION OF DDG 51 SHIP
Oct 21, 2024A00037$82.9KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Oct 15, 2024A00036$0CONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Oct 7, 2024A00035$21.7KDB3676 WIRE CONNECTION LIST AND CABLE BLK DIAGRAM CHANGES FROM 2.01.2023 THRU 07.31.2023 CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Sep 27, 2024A00034$212CONSTRUCTION OF DDG 51 SHIP
Sep 20, 2024A00033$3.9KPR-157269- SSEE-INC F STUFFING TUBE ORIENTATION FOR AFT DECK EDGE ANTENNAS FOR DDG 131 AF FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Sep 11, 2024A00030$6.0KCONSTRUCTION OF DDG 51 SHIP
Sep 11, 2024A00031$0CONSTRUCTION OF DDG 51 SHIP
Sep 11, 2024A00032$92.8KDB-3698C1 AD FLIGHT DECK LIGHTING AND ADVANCED STABILIZED GLIDE SLOPE INDICATOR ICD UPDATE VLA CLASS PLAN UPDATE AND GFI UPDATE FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG147 FIRM FY27 DDG149
Aug 29, 2024A00028$2.3KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Aug 29, 2024A00029$-276.7KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Aug 27, 2024A00027$259.8KCONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Aug 23, 2024A00022$818PR-158726 AHSS #11 RELOCATION FOR DDG-129AF CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Aug 23, 2024A00023$107CONSTRUCTION OF FY 23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Aug 23, 2024A00024$39.4KCONSTRUCTION OF DDG 51 SHIPFIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Aug 23, 2024A00025$166WF-3705 CLARIFY FLIGHT DECK CO2 FIRE EXTINGUISHER EXTENSION LENGTH NAVSEA 05D2 CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Aug 23, 2024A00026$10.0KWF-3708 UPDATE GFE PROVIDED RAST MACHINERY ROOM PARTS DUE TO OBSOL CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Aug 16, 2024A00021$0CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149
Aug 15, 2024A00020$107CONSTRUCTION OF FY 23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Aug 12, 2024A00019$0CONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143
Aug 9, 2024A00016$107CONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Aug 9, 2024A00017$0CONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Aug 9, 2024A00018$22.3KCONSTRUCTION OF DDG 51 SHIP FIRM FY23 DDG141 OPTION FY23 DDG142 FIRM FY24 DDG143 FIRM FY25 DDG145 FIRM FY25-2 DDG146 FIRM FY26 DDG 147 FIRM FY27 DDG149 51 2064 FY20 RCIA CLEAN UP OF ECP 51-1918R1 INSTALL MFTA OK410 V 4 H&SG IN-LINE
Aug 7, 2024P00011$0CONSTRUCTION OF DDG 51 SHIP
Aug 7, 2024P00012$0CONSTRUCTION OF DDG 51 SHIP
Aug 6, 2024A00015$0CONSTRUCTION OF DDG 51 SHIP CONSTRUCTION OF FY24 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Jul 17, 2024A00013$134.0KCONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Jul 17, 2024A00014$11.2KCONSTRUCTION OF DDG 51 SHIP
Jul 16, 2024A00012$689CONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Jul 15, 2024A00011$-2.2KCONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Jun 17, 2024A00010$0CONSTRUCT FIRM HHIP FY23 DDG 51 CLASS GUIDED MISSILE DESTROYER DDG 141-149
Jun 7, 2024A00009$107CONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Jun 5, 2024A00007$0CONSTRUCTION OF FY 23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Jun 5, 2024A00008$0HULLS DDG 141-149: NCI-0830, NCI-0831, NCI-0832 & NCI-0833
May 21, 2024P00010$1.4BCONSTRUCTION OF DDG 51 SHIP
May 16, 2024A00005$106CONSTRUCTION OF FY23 AERLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
May 16, 2024A00006$107CONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
May 2, 2024A00004$102.2KCONSTRUCTION OF DDG 51 SHIP
Mar 18, 2024A00003$0CONSTRUCTION OF FY23 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Mar 11, 2024P00009$15.0MCONSTRUCTION OF DDG 51 SHIP
Mar 6, 2024A00002$0STOP WORK ORDER EXTENSION FOR FY 23 CLASS STANDARD EQUIPMENT FOR DDG 141 AF
Feb 13, 2024P00008$0CONSTRUCTION OF DDG 51 SHIP
Dec 20, 2023P00007$-38.7MCONSTRUCTION OF DDG 51 SHIP
Dec 19, 2023P00006$0CONSTRUCTION OF DDG 51 SHIP
Nov 29, 2023A00001$0CONSTRUCTION OF FY24 ARLEIGH BURKE CLASS GUIDED MISSILE DESTROYER
Nov 3, 2023P00005$0CONSTRUCTION OF DDG 51 SHIP
Sep 12, 2023P00004$0CONSTRUCTION OF DDG 51 SHIP
Aug 31, 2023P00003$64.9MCONSTRUCTION OF DDG 51 SHIP
Aug 11, 2023P00002$1.3BCONSTRUCTION OF DDG 51 SHIP
Aug 7, 2023P00001$364.0MCONSTRUCTION OF DDG 51 SHIP
Aug 1, 20230$1.4BCONSTRUCTION OF DDG 51 SHIPS FY23-27

Estimated positioning window

Feb 28, 2033 – Aug 28, 2033

Recompete signal:
50/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 50/100. Available recorded signals: 45 points.

Contract end 2034-02-28 (2683 days from calculation)
+5 points
21 historical awards in this buyer and category group
+15 points
198 recorded award transactions
+10 points
Latest award action: 2026-06-02
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.