Federal contract award
N0002423C4424
N00024-23-C-4424 USS CHUNG-HOON/USS JAMES E. WILLIAMS UNDEFINITIZED CONTRACT ACTION FOR PLANNING
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | SOUTHWEST REGIONAL MAINT CENTER |
| NAICS | 336611 — Ship Building and Repairing |
| PSC | J998 — Non-nuclear Ship Repair (East) Ship repair (including overhauls and conversions) performed on non-nuclear propelled and nonpropelled ships east of the 108th meridian |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $435.3M |
| Current contract value | $435.8M |
| Potential contract value / ceiling | $826.1M |
| Start date | Sep 29, 2023 |
| Current end date | Nov 18, 2026 |
| Potential end date | Nov 18, 2026 |
| Latest award activity | May 28, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 120 of 120 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 28, 2026 | A00080 | $164.9K | CODE 430A, EXTENSION COSTS |
| May 22, 2026 | A00079 | $1.3M | C430A, CONTRACT MOD TO CHANGE DELIVERY DATE, NOTE EXCEPTIONS |
| May 7, 2026 | P00018 | $432.9K | N00024-23-C-4424 USS JAMES E WILLIAMS/USS CHUNG-HOON |
| May 6, 2026 | A00078 | $-188.8K | CODE 430A, TO REMOVE EXISTING WORK REQUIREMENTS FROM THE WORK PACKAGE AND TO PROVIDE ADDITIONAL FUNDING FOR COST OVERRUN. |
| Apr 28, 2026 | A00077 | $-227.3K | USS JAMES E WILLIAMS (DDG-95) SSP: TPPC- DDG95-MA RMC23-CN01 THE PURPOSE OF THIS MODIFICATION IS TO SETTLE RCCS AND DE-OBLIGATE UNUSED RTR FUNDS. |
| Apr 23, 2026 | A00076 | $510.3K | CODE 430A, TO FULLY FUND AND OBLIGATE GROWTH AND NEW WORK REQUIREMENTS. -UNILATERAL/DISAGRREMENT ON SCHEDULE-. |
| Apr 15, 2026 | A00075 | $-3.6M | USS JAMES E WILLIAMS (DDG-95) SSP: TPPC- DDG95-MA RMC23-CN01 THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE UNUSED LEVEL OF EFFORT (LOETC) FUNDS. |
| Mar 18, 2026 | A00074 | $-11.6K | CODE 430A, TO REMOVE EXISTING WORK REQUIREMENTS FROM THE WORK PACKAGE. |
| Mar 12, 2026 | A00073 | $-89.5K | TO SETTLED DE-SCOPE AND ADMIN RCCS TO SUPPORT JAMES E. WILLIAMS FY24 CNO DMP N0002423C4424. |
| Mar 10, 2026 | A00072 | $610.0K | CODE 430A, TO EXTEND CONTRACT DELIVERY DATE. UNILATERAL, DISAGREEMENT ON SCHEDULE |
| Feb 27, 2026 | A00071 | $1.2M | CODE 430A, TO EXTEND CONTRACT DELIVERY DATE. UNILATERAL, DISAGREEMENT ON SCHEDULE. |
| Feb 11, 2026 | A00070 | $-6.6K | TO SETTLED DE-SCOPE AND ADMIN RCCS TO SUPPORT JAMES E. WILLIAMS FY23 CNO |
| Feb 5, 2026 | A00069 | $-7.9K | CODE 430A, TO REMOVE EXISTING WORK REQUIREMENTS FROM THE WORK PACKAGE. |
| Feb 4, 2026 | A00068 | $618.0K | CODE 430A, TO FULLY FUND AND OBLIGATE GROWTH WORK REQUIREMENTS -UNILATERAL/DISAGREEMENT ON SCHEDULE-. |
| Jan 23, 2026 | A00067 | $0 | AVAIL EXTENSION IAW RCC 850G TO SUPPORT USS JAMES E WILLIAMS (DDG-95). |
| Jan 21, 2026 | A00066 | $0 | AVAIL EXTENSION IAW RCC 849G TO SUPPORT USS JAMES E WILLIAMS (DDG-95). |
| Jan 13, 2026 | A00065 | $143.1K | CODE 430A, TO FULLY FUND AND OBLIGATE GROWTH WORK REQUIREMENTS -UNILATERAL/DISAGREEMENT ON SCHEDULE-. |
| Jan 9, 2026 | A00064 | $-38.2K | CODE 430A, TO REMOVE EXISTING WORK REQUIREMENTS FROM THE WORK PACKAGE. |
| Dec 19, 2025 | A00063 | $0 | AVAIL EXTENSION IAW RCC 841G TO SUPPORT USS JAMES E WILLIAMS (DDG-95). |
| Dec 15, 2025 | A00062 | $4.6K | CODE 430A, TO OBLIGATE GROWTH WORK REQUIREMENTS -UNILATERAL/MILESTONE IMPACT-. |
| Dec 10, 2025 | A00061 | $-10.8K | SUPPLEMENTAL AGREEMENT FOR GROWTH WORK WITHIN SCOPE- DESCOPED WORK |
| Dec 5, 2025 | A00060 | $0 | C430A, MODIFICATION TO CORRECT LOA. |
| Nov 21, 2025 | A00059 | $134.4K | FUNDING FOR AVAIL EXTENSION IAW RCC 826G TO SUPPORT USS JAMES E WILLIAMS (DDG-95). |
| Nov 20, 2025 | A00058 | $-637.8K | CODE 430A, TO FULLY FUND AND OBLIGATE GROWTH WORK AND REMOVE EXISTING WORK REQUIREMENTS FROM THE WORK PACKAGE. |
| Oct 30, 2025 | A00057 | $31.9K | FUNDING TO SETTLE GROWTH RCCS AND EXTENSION IAW RCC 813G TO SUPPORT JAMES E WILLIAMS (DDG-95). |
| Oct 28, 2025 | A00056 | $0 | GFM TRANSFER - LOSING CONTRACT |
| Oct 17, 2025 | A00055 | $-1.3K | CODE 430A, TO FULLY FUND AND OBLIGATE GROWTH WORK AND REMOVE EXISTING WORK REQUIREMENTS FROM THE WORK PACKAGE |
| Sep 26, 2025 | P00017 | $-1.0M | TYCOM CORE |
| Sep 24, 2025 | A00054 | $-41.8K | CODE 430A, TO FULLY FUND AND OBLIGATE GROWTH WORK AND REMOVE EXISTING WORK REQUIREMENTS FROM THE WORK PACKAGE. |
| Sep 19, 2025 | A00053 | $1.4M | CODE 430A, TO FULLY FUND AND OBLIGATE GROWTH WORK, AND EXTEND CONTRACT DELIVERY DATE. UNILATERAL, DISAGREEMENT ON SCHEDULE. |
| Sep 11, 2025 | A00051 | $-7.0K | SUPPLEMENTAL AGREEMENT FOR GROWTH WORK WITHIN SCOPE- DESCOPED WORK |
| Sep 11, 2025 | A00052 | $-689.9K | FUNDING ONLY ACTION- DE-OBLIGATE GROWTH LOETC FUNDING FROM CLIN 1052. |
| Sep 8, 2025 | A00050 | $-95.3K | CODE 430A, TO DE-OBLIGATE WORK REQUIREMENTS FROM GROWTH WORK, UNILATERAL - PRICING DISAGREEMENT. |
| Sep 3, 2025 | A00049 | $37.5K | CODE 430A, TO PROVIDE ADDITIONAL FUNDING FOR COST OVERRUN AND RECOUP LOE FUNDS. |
| Aug 22, 2025 | A00048 | $-59.0K | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE- GROWTH, DESCOPED WORK |
| Aug 20, 2025 | A00047 | $183.7K | CODE 430A, TO FULLY FUND AND OBLIGATE GROWTH WORK AND REMOVE EXISTING WORK REQUIREMENTS FROM THE WORK PACKAGE. MODIFICATION TO IMPLEMENT MILESTONE SHIFT DATE FOR (C5ILO). |
| Aug 15, 2025 | A00046 | $1.9M | FUNDING ONLY ACTION TO PARTIALLY FUND OVERRUN FOR CLIN 1008 |
| Aug 4, 2025 | A00045 | $-21.7K | SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE- GROWTH AND DE-SCOPED WORK |
| Jul 31, 2025 | A00044 | $0 | GFM TRANSFER - GAINING CONTRACT (CANCELLING MOD A00033 FOR GFM TRANSFER - LOSING CONTRACT) |
| Jul 30, 2025 | A00043 | $652.9K | CODE 430A, TO FULLY FUND AND OBLIGATE GROWTH WORK AND REMOVE EXISTING WORK REQUIREMENTS FROM THE WORK PACKAGE TO IMPLEMENT MILESTONE SHIFT DATE FOR MOVE TO NBSD. |
| Jul 25, 2025 | A00042 | $1.4M | FUNDING ONLY ACTION TO PARTIALLY FUND OVERRUN ON FOR CLIN 1008 |
| Jul 21, 2025 | A00041 | $444.7K | CODE 430A, TO FULLY FUND AND OBLIGATE GROWTH WORK AND REMOVE EXISTING WORK REQUIREMENTS FROM THE WORK PACKAGE. PROVIDE ADDITIONAL FUNDING FOR COST OVERRUN. IMPLEMENT MILESTONE SHIFT DATE FOR (C5ILO). |
| Jul 10, 2025 | A00040 | $1.9M | FUNDING TO SETTLE GROWTH RCCS AND EXTENSION COST TO SUPPORT RCC 738G TO SUPPORT JAMES E. WILLIAMS (DDG95). |
| Jul 2, 2025 | A00039 | $91.5K | CODE 430A, TO FULLY FUND AND OBLIGATE GROWTH WORK AND REMOVE EXISTING WORK REQUIREMENTS FROM THE WORK PACKAGE |
| Jun 17, 2025 | A00038 | $1.0M | CODE 430A, TO FULLY FUND AND OBLIGATE GROWTH WORK AND REMOVE EXISTING WORK REQUIREMENTS FROM THE WORK PACKAGE |
| Jun 12, 2025 | A00037 | $-75.3K | SUPPLEMENTAL AGREEMENT- ADDITIONAL OF GROWTH AND DE-SCOPED WORK |
| Jun 4, 2025 | A00036 | $0 | C430A, MODIFICATION TO REALIGN FUNDS |
| May 28, 2025 | A00035 | $498.8K | CODE 430A, MODIFICATION TO IMPLEMENT MILESTONE SHIP DATE FOR PRODUCTION COMPLETE DATE(PCD), AND INCORPORATE GROWTH WORK. |
| May 21, 2025 | A00034 | $-23.3K | CODE 430A, MODIFICATION TO INCORPORATE GROWTH WORK AND DEOBLIGATE BASIC WORK NO LONGER REQUIRED. |
| May 20, 2025 | A00033 | $0 | GFM TRANSFER - LOSING CONTRACT |
| May 9, 2025 | A00032 | $-108.3K | CODE 430A, MODIFICATION TO INCORPORATE GROWTH WORK AND DEOBLIGATE BASIC WORK NO LONGER REQUIRED. |
| May 1, 2025 | A00031 | $10.0K | CODE 430A, PROVIDE ADDTIONAL FUNDING FOR COST OVERRUN |
| Apr 25, 2025 | A00030 | $582.5K | CODE 430A, MODIFICATION TO INCORPORATE GROWTH WORK AND DEOBLIGATE BASIC WORK NO LONGER REQUIRED. |
| Apr 24, 2025 | A00029 | $-369.0K | SUPPLEMENTAL AGREEMENT - ADDITION GROWTH AND DE-SCOPED WORK |
| Apr 18, 2025 | A00028 | $35.0K | CODE 430A, PROVIDE ADDTIONAL FUNDING FOR COST OVERRUN |
| Apr 11, 2025 | A00027 | $-257.3K | CODE 430A, INCORPORATE GROWTH WORK AND DESCOPE BASIC WORK REQUIREMENTS |
| Apr 4, 2025 | A00026 | $54.8K | CODE 430A, DE-SCOPE OF BASIC REQUIREMENTS AND FUNDING GROWTH WORK IDENTIFIED IN AVAILABILITY |
| Apr 3, 2025 | A00025 | $0 | SUPPLEMENTAL AGREEMENT TO GRANT 3 NON-COMPENSABLE DAYS IF NON-ATTAINMENT IF THE CONTRACTUAL DATE IS NOT MET BY THE LMA |
| Mar 28, 2025 | A00024 | $0 | CODE 430A, INCORPORATE CLASS DEVIATIONS |
| Mar 25, 2025 | A00023 | $-2.1M | OBLIGATE FUNDING FOR NEW AND GROWTH AND CREDIT RCCS TO SUPPORT JAMES E WILLIAMS CNO |
| Mar 19, 2025 | A00022 | $-835.2K | CODE 430A, DE-SCOPE OF BASIC REQUIREMENTS AND FUNDING GROWTH WORK IDENTIFIED IN AVAILABILITY |
| Mar 7, 2025 | A00021 | $1.2M | CODE 430A, DE-SCOPE OF BASIC REQUIREMENTS AND FUNDING GROWTH WORK IDENTIFIED IN AVAILABILITY |
| Feb 25, 2025 | A00020 | $-626.3K | CODE 430A, DE-SCOPE OF BASIC REQUIREMENTS AND FUNDING OF GROWTH WORK IDENTIFIED IN AVAILABILITY |
| Feb 13, 2025 | A00019 | $1.2M | CODE 430A, DE-SCOPE OF BASIC REQUIREMENTS AND FUNDING OF GROWTH WORK IDENTIFIED IN AVAILABILITY |
| Feb 7, 2025 | A00018 | $-1.4M | USS JAMES E WILLIAMS DESCOPE AND NO COST RCC SETTLEMENT |
| Jan 28, 2025 | A00017 | $0 | USS JAMES E WILLIAMS DEFINITIZE UCO RCCS/CLINS |
| Jan 21, 2025 | A00016 | $-1.0M | CODE 430A, DE-SCOPE OF BASIC REQUIREMENTS AND FUNDING OF GROWTH WORK IDENTIFIED IN AVAILABILITY |
| Jan 10, 2025 | AX0009 | $216.7K | USS JAMES E WILLIAMS UCO RCCS |
| Jan 3, 2025 | PZ0003 | $33.4M | N00024-23-C-4424 USS CHUNG-HOON/USS JAMES E WILLIAMS |
| Dec 19, 2024 | AX0008 | $899.7K | USS JAMES E WILLIAMS UCO RCCS |
| Dec 17, 2024 | A00015 | $13.3K | C430A, MODIFICATION TO DEFINITIZE CLINS AND REALIGN FUNDS |
| Dec 5, 2024 | A00014 | $254.3K | CODE 430A, DE-SCOPE OF BASIC REQUIREMENTS AND FUNDING OF GROWTH WORK IDENTIFIED IN AVAILABILITY |
| Nov 22, 2024 | A00013 | $316.5K | CODE 430A, DESCOPE OF BASIC REQUIREMENTS AND FUNDING OF GROWTH WORK IDENTIFIED IN AVAILABILITY |
| Nov 18, 2024 | AX0007 | $114.7K | USS JAMES E WILLIAMS UCO RCCS |
| Nov 8, 2024 | A00012 | $445.4K | C430A, MODIFICATION TO INCORPORATE GROWTH WORK REPAIRS AND DE-OBLIGATE BASIC WORK IDENTIFIED DURING MAINTENANCE AVAILABILITY. |
| Nov 4, 2024 | A00011 | $-79.8K | C430A, MODIFICATION TO DEFINITIZE CLINS |
| Oct 28, 2024 | A00010 | $1.5M | C430A, MODIFICATION TO INCORPORATE GROWTH WORK REPAIRS IDENTIFIED DURING MAINTENANCE AVAILABILITY. |
| Oct 24, 2024 | AX0006 | $1.1M | USS JAMES E WILLIAMS DDG95 PLACING UCO RCCS ON CONTRACT |
| Oct 17, 2024 | A00009 | $782.0K | C430A, MODIFICATION TO REVISE UNDOCK VESSEL AND 50% CONFERENCE MILESTONES |
| Oct 9, 2024 | P00016 | $49.0K | USS CHUNG-HOON (DDG 93) AND USS JAMES E WILLIAMS (DDG 95) FY24 DEPOT MODERNIZATION PERIOD AVAILABILITIES |
| Oct 2, 2024 | A00008 | $821.8K | C430A, MODIFICATION TO INCORPORATE GROWTH WORK REPAIRS IDENTIFIED DURING MAINTENANCE AVAILABILITY. |
| Sep 27, 2024 | AX0005 | $787.4K | USS JAMES E WILLIAMS DDG95 UCOS |
| Sep 26, 2024 | A00007 | $1.7M | C430A, MODIFICATION TO INCORPORATE GROWTH WORK REPAIRS IDENTIFIED DURING MAINTENANCE AVAILABILITY. |
| Sep 17, 2024 | P00015 | $52.5K | USS CHUNG-HOON (DDG 93) AND USS JAMES E WILLIAMS (DDG 95) FY24 DEPOT MODERNIZATION PERIOD AVAILABILITIES |
| Sep 16, 2024 | AZ0009 | $1.9M | C430A, MODIFICATION TO INCORPORATE GROWTH WORK REPAIRS IDENTIFIED DURING MAINTENANCE AVAILABILITY. |
| Sep 11, 2024 | PZ0002 | $83.2M | USS CHUNG-HOON (DDG 93) AND USS JAMES E WILLIAMS (DDG 95) FY24 DEPOT MODERNIZATION PERIOD AVAILABILITIES |
| Aug 30, 2024 | AX0004 | $2.0M | USS JAMES E WILLIAMS UCO RCCS |
| Aug 27, 2024 | AZ0008 | $2.2M | C430A, MODIFICATION TO INCORPORATE GROWTH WORK REPAIRS IDENTIFIED DURING MAINTENANCE AVAILABILITY. |
| Aug 22, 2024 | P00014 | $0 | USS CHUNG-HOON (DDG 93) AND USS JAMES E WILLIAMS (DDG 95) FY24 DEPOT MODERNIZATION PERIOD AVAILABILITIES |
| Aug 15, 2024 | P00013 | $500.4K | USS CHUNG-HOON (DDG 93) AND USS JAMES E WILLIAMS (DDG 95) FY24 DEPOT MODERNIZATION PERIOD AVAILABILITIES |
| Aug 2, 2024 | A00006 | $0 | USS JWS NO COST RCC SETTLEMENT |
| Jul 31, 2024 | AZ0007 | $2.1M | C430A, MODIFICATION TO INCORPORATE GROWTH WORK REPAIRS IDENTIFIED DURING MAINTENANCE AVAILABILITY. |
| Jul 19, 2024 | AZ0006 | $2.2M | C430A, MODIFICATION TO INCORPORATE NEW WORK INSTALLATIONS AND GROWTH WORK REPAIRS IDENTIFIED DURING MAINTENANCE AVAILABILITY. |
| Jul 17, 2024 | P00012 | $2.5M | USS CHUNG-HOON (DDG 93) AND USS JAMES E WILLIAMS (DDG 95) FY24 DEPOT MODERNIZATION PERIOD AVAILABILITIES |
| Jul 9, 2024 | P00011 | $12.1M | USS CHUNG-HOON (DDG 93) AND USS JAMES E WILLIAMS (DDG 95) FY24 DEPOT MODERNIZATION PERIOD AVAILABILITIES |
| Jul 8, 2024 | AX0003 | $1.7M | USS JAMES E WILLIAMS UCO RCC SETTLEMENT NTES |
| Jul 3, 2024 | A00005 | $0 | C430A, USS CHUNG HOON (DDG 93), TPPC-DDG93-SWRMC23-CN01, NO COST ADMIN CHANGE, UNILATERAL |
| Jun 28, 2024 | AZ0005 | $831.9K | CODE 430A, USS CHUNG HOON (DDG93), TPPC-DDG93-SWRMC23-CN01, UNPRICED CONTRACT ACTIONS, DESCOPE RCCS- BILATERAL |
| Jun 18, 2024 | AX0002 | $831.5K | USS JAMES E WILLIAMS UCO RCCS |
| Jun 13, 2024 | AZ0004 | $171.0K | CODE 430A, USS CHUNG HOON (DDG93), TPPC-DDG93-SWRMC23-CN01, UNPRICED CONTRACT ACTIONS, DESCOPE RCCS- BILATERAL |
| May 29, 2024 | P00010 | $54.9M | USS CHUNG-HOON (DDG 93) AND USS JAMES E WILLIAMS (DDG 95)DEPOT MODERNIZATION PERIOD AVAILABILITIES |
| May 23, 2024 | A00004 | $0 | USS JAMES E WILLIAMS NO COST RCC SETTLEMENT |
| May 16, 2024 | AZ0003 | $289.3K | CODE 430A, USS CHUNG HOON (DDG 93) FY24 DMP, TPPC-DDG93-SWRMC23-CN01, GROWTH, UCO, BILATERAL |
| May 1, 2024 | AX0001 | $846.8K | USS JAMES E. WILLIAMS UNPRICED CHANGE ORDER FOR RCC 140G |
| Apr 25, 2024 | AZ0002 | $1.2M | CODE 430A, USS CHUNG HOON (DDG 93) FY24 DMP, TPPC-DDG93-SWRMC23-CN01, GROWTH, UCO, BILATERAL |
| Apr 19, 2024 | PZ0001 | $-148.3K | USS CHUNG-HOON (DDG 93) AND USS JAMES E. WILLIAMS (DDG 95) DEPOT MODERNIZATION PERIODS AVAILABILITIES |
| Apr 9, 2024 | AZ0001 | $174.4K | CODE 430A, USS CHUNG HOON, TPPC-DDG930SWRMC23-CN01, GROWTH, UCO |
| Mar 29, 2024 | P00009 | $5.1M | USS CHUNG-HOON (DDG 93) AND USS JAMES E WILLIAMS (DDG 95) FISCAL YEAR 2024 DEPOT MODERNIZATION PERIOD AVAILABILITIES |
| Mar 8, 2024 | A00003 | $777.9K | CODE 430A, USS CHUNG HOON DDG93, TPPC-DDG93-SWRMC23-CN01, GROWTH WORK |
| Feb 29, 2024 | P00008 | $0 | ADMINISTRATIVE ACTION TO SECTION F DODAACS/SHIPPING ADDRESS TO USS CHUNG-HOON CLINS 0001-0067, UPDATE WAWF TABLE, AND TO INCLUDE COR CONTACT INFORMATION AND UPDATE THE CONTRACT SPECIALIST FOR THE CONTRACT. |
| Feb 28, 2024 | A00002 | $0 | USS JAMES E WILLIAMS NO COST RCCS |
| Feb 15, 2024 | P00007 | $16.2M | REMOVAL OF SEWIP NOTE M LANGUAGE. EXERCISE CLINS 0034, 0039, 1041, 1043, 1053, AND 1054. OBLIGATE FUNDING TO CLINS 0008, 0034, 0039, 1008, 1041, 1043, 1053, AND 1054. REALIGN CEILING FROM CLIN 0009 TO CLIN 0007. DE-OBLIGATE FUNDING FROM CLIN 0009. |
| Feb 1, 2024 | P00006 | $0 | ADMINISTRATIVELY UPDATING NOTE M TO INCLUDE TABLE 1. |
| Jan 30, 2024 | P00005 | $2.0M | EXERCISING OPTION UCA CLINS 0008 AND 1008, AND OBLIGATING FUNDING TO CLINS 0008 AND 1008 |
| Jan 16, 2024 | A00001 | $0 | USS JAMES WILLIAMS GFM TRANSFER MOD FROM USS BAINBRIDGE |
| Jan 9, 2024 | P00004 | $115.1K | EXERCISING OPTION CLINS 0012, 0013, 0018, 0019, 0022, 0028, 0032, 1012, 1026, 1033, 1034, 1035, 1036, 1037, AND 1038. OBLIGATING FUNDING ACCORDINGLY. |
| Dec 22, 2023 | P00003 | $185.9M | USS CHUNG-HOON AND USS JAMES E. WILLIAMS UNDEFINITIZED CONTRACT ACTION FOR EXECUTION AND GROWTH. |
| Nov 22, 2023 | P00002 | $2.5M | USS CHUNG-HOON AND USS JAMES E. WILLIAMS UNDEFINITIZED CONTRACT ACTION FOR PLANNING |
| Oct 5, 2023 | P00001 | $0 | USS CHUNG-HOON AND USS JAMES E. WILLIAMS UNDEFINITIZED CONTRACT ACTION FOR PLANNING |
| Sep 29, 2023 | 0 | $7.8M | N00024-23-C-4424 USS CHUNG-HOON/USS JAMES E. WILLIAMS UNDEFINITIZED CONTRACT ACTION FOR PLANNING |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2026-11-18 (24 days from calculation)
- +35 points
- 1 historical awards in this buyer and category group
- +0 points
- 120 recorded award transactions
- +10 points
- Latest award action: 2026-05-28
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.