Federal contract award
N0002424C4212
CEILING HOLDER
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | NAVSEA HQ |
| NAICS | 336611 — Ship Building and Repairing |
| PSC | 1905 — Combat Ships and Landing Vessels |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS AWARD FEE |
| Obligations | $439.3M |
| Current contract value | $688.5M |
| Potential contract value / ceiling | $1.0B |
| Start date | Aug 1, 2024 |
| Current end date | Jul 31, 2027 |
| Potential end date | Jul 31, 2029 |
| Latest award activity | Jun 5, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 200 of 214 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 11, 2026 | A00200 | $786.3K | PROVISIONED ITEMS ORDERS (PIO) |
| Jun 10, 2026 | A00199 | $4.4M | SHIP ALTERATION WORK |
| Jun 9, 2026 | A00198 | $574.1K | SHIP ALTERATION WORK |
| Jun 5, 2026 | P00013 | $0 | SHIP ALTERATION WORK |
| Jun 4, 2026 | A00197 | $1.1M | PROVISIONED ITEMS ORDERS (PIO) |
| Jun 3, 2026 | A00196 | $3.7M | SHIP ALTERATION WORK |
| Jun 1, 2026 | A00195 | $2.5M | SHIP ALTERATION WORK |
| May 29, 2026 | A00194 | $1.2M | PROVISIONED ITEMS ORDERS (PIO) |
| May 28, 2026 | A00193 | $16.7M | SHIP ALTERATION WORK |
| May 21, 2026 | A00192 | $466.7K | SHIP ALTERATION WORK |
| May 19, 2026 | A00191 | $4.2M | SHIP ALTERATION WORK |
| May 14, 2026 | A00190 | $505.3K | PROVISIONED ITEMS ORDERS (PIO) |
| May 13, 2026 | A00189 | $2.6K | SHIP ALTERATION WORK |
| May 12, 2026 | A00188 | $1.8M | SHIP ALTERATION WORK |
| May 7, 2026 | A00187 | $342.1K | PROVISIONED ITEMS ORDERS (PIO) |
| May 5, 2026 | A00186 | $-325.9K | SHIP ALTERATION WORK - SEVERABLE |
| Apr 30, 2026 | A00185 | $598.9K | PROVISIONED ITEMS ORDERS (PIO) |
| Apr 27, 2026 | A00184 | $239.8K | SHIP ALTERATION WORK - SEVERABLE |
| Apr 23, 2026 | A00182 | $10.2M | SHIP ALTERATION WORK - SEVERABLE |
| Apr 23, 2026 | A00183 | $392.3K | PROVISIONED ITEMS ORDERS (PIO) |
| Apr 22, 2026 | A00181 | $107.0K | SHIP ALTERATION WORK - SEVERABLE |
| Apr 16, 2026 | A00180 | $3.1M | PROVISIONED ITEMS ORDERS (PIO) |
| Apr 14, 2026 | A00179 | $3.3M | SHIP ALTERATION WORK-SEVERABLE |
| Apr 10, 2026 | A00178 | $2.0M | PROVISIONED ITEMS ORDERS (PIO) |
| Apr 7, 2026 | A00177 | $246.0K | SHIP ALTERATION WORK |
| Apr 2, 2026 | A00176 | $199.9K | PROVISIONED ITEMS ORDERS (PIO) |
| Mar 31, 2026 | A00175 | $-367.8K | SHIP ALTERATION WORK-SEVERABLE |
| Mar 26, 2026 | A00174 | $138.8K | (PIO) PROVISIONED ITEM ORDERS |
| Mar 24, 2026 | A00173 | $-214.0K | SHIP ALTERATION WORK |
| Mar 20, 2026 | A00172 | $2.0M | PROVISIONED ITEMS ORDERS (PIO) |
| Mar 17, 2026 | A00171 | $1.9M | SHIP ALTERATION WORK-SEVERABLE |
| Mar 12, 2026 | A00170 | $912.6K | PROVISIONED ITEMS ORDERS (PIO) |
| Mar 10, 2026 | A00169 | $2.1M | SHIP ALTERATION WORK |
| Mar 5, 2026 | A00168 | $242.4K | PROVISIONED ITEM ORDERS (PIO) |
| Mar 2, 2026 | A00167 | $841.7K | SHIP ALTERATION WORK-SEVERABLE |
| Feb 27, 2026 | A00166 | $511.0K | SHIP ALTERATION WORK |
| Feb 25, 2026 | A00165 | $629.7K | SHIP ALTERATION WORK |
| Feb 19, 2026 | A00164 | $123.9K | PROVISIONED ITEM ORDERS |
| Feb 18, 2026 | A00163 | $1.1M | SHIP ALTERATION WORK - FUNDING ONLY ACTION |
| Feb 13, 2026 | A00162 | $100.0K | PROVISIONED ITEMS ORDERS (PIO) |
| Feb 11, 2026 | A00160 | $-3.5M | SHIP ALTERATION WORK - FUNDING ACTION |
| Feb 11, 2026 | A00161 | $2.6M | SHIP ALTERATION WORK - FUNDING ACTION. |
| Feb 5, 2026 | A00159 | $1.5M | PROVISIONED ITEMS ORDERS (PIO) |
| Feb 4, 2026 | A00158 | $699.6K | SHIP ALTERATION WORK |
| Jan 29, 2026 | A00157 | $207.2K | PROVISIONED ITEMS ORDERS (PIO) |
| Jan 27, 2026 | A00156 | $4.7M | SHIP ALTERATION WORK |
| Jan 23, 2026 | A00154 | $3.1M | PROVISIONED ITEMS ORDERS (PIO) |
| Jan 23, 2026 | A00155 | $256.6K | SHIP ALTERATION WORK |
| Jan 21, 2026 | A00153 | $8.2M | SHIP ALTERATION WORK-SEVERABLE |
| Jan 15, 2026 | A00152 | $2.2M | PROVISIONED ITEMS ORDERS (PIO) |
| Jan 12, 2026 | A00151 | $1.8M | SHIP ALTERATION WORK |
| Jan 9, 2026 | A00150 | $5.0M | PROVISIONED ITEMS ORDERS (PIO) |
| Jan 7, 2026 | A00149 | $297.3K | SHIP ALTERATION WORK-SEVERABLE |
| Dec 22, 2025 | A00148 | $189.0K | PROVISIONED ITEMS ORDERS (PIO) |
| Dec 17, 2025 | P00012 | $0 | SHIP ALTERATION WORK. THE PURPOSE OF THE MOD IS TO REALIGN CEILING/INCENTIVE FROM CLINS 1003, 1006, 1009 AND 1010 TO CLINS 0101, 0106, 0109 AND 0110. |
| Dec 16, 2025 | A00147 | $1.1M | SHIP ALTERATION WORK |
| Dec 10, 2025 | A00145 | $976.4K | SHIP ALTERATION WORK - WITHIN SCOPE |
| Dec 10, 2025 | A00146 | $10.1M | SHIP ALTERATION WORK |
| Dec 8, 2025 | A00144 | $1.7M | SHIP ALTERATION WORK - WITHIN SCOPE. |
| Dec 4, 2025 | A00143 | $981.6K | PROVISIONED ITEMS ORDERS (PIO) |
| Dec 1, 2025 | A00142 | $-231.6K | PROVISIONED ITEM ORDER - CHANGE WORK - IN SCOPE |
| Nov 21, 2025 | A00141 | $-599.1K | SHIP ALTERATION WORK-SEVERABLE |
| Nov 20, 2025 | A00140 | $2.8M | PROVISIONED ITEMS ORDERS (PIO) |
| Nov 14, 2025 | A00139 | $713.4K | PROVISIONED ITEMS ORDERS (PIO) |
| Nov 13, 2025 | A00138 | $2.0M | PROVISIONED ITEMS ORDERS (PIO) |
| Oct 31, 2025 | A00137 | $2.3M | SHIP ALTERATION WORK-SEVERABLE |
| Oct 21, 2025 | A00136 | $4.9M | PROVISIONED ITEMS ORDERS (PIO) |
| Oct 10, 2025 | P00011 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCLUDE THE 3D CAD MODELING INTO THE SOW AND CDRL A026. |
| Sep 29, 2025 | A00135 | $922.0K | SHIP ALTERATION WORK |
| Sep 25, 2025 | A00134 | $2.7M | PROVISIONED ITEMS ORDERS (PIO) |
| Sep 23, 2025 | A00133 | $2.7M | SHIP ALTERATION WORK |
| Sep 18, 2025 | A00132 | $2.1M | PROVISIONED ITEMS ORDERS (PIO) |
| Sep 16, 2025 | A00131 | $1.4M | SHIP ALTERATION WORK-SEVERABLE |
| Sep 11, 2025 | A00130 | $581.6K | PROVISIONED ITEMS ORDERS (PIO) |
| Sep 9, 2025 | A00129 | $1.7M | SHIP ALTERATION WORK-SEVERABLE |
| Sep 4, 2025 | A00128 | $608.7K | PROVISIONED ITEMS ORDERS (PIO) |
| Sep 3, 2025 | A00127 | $-763.9K | SHIP ALTERATION WORK |
| Sep 2, 2025 | A00126 | $3.9M | PROVISIONED ITEMS ORDERS (PIO) |
| Aug 26, 2025 | A00125 | $2.6M | SHIP ALTERATION WORK |
| Aug 21, 2025 | A00124 | $1.9M | PROVISIONED ITEMS ORDERS (PIO) |
| Aug 19, 2025 | A00123 | $-955.4K | SHIP ALTERATION WORK-SEVERABLE |
| Aug 14, 2025 | A00122 | $398.5K | PROVISIONED ITEMS ORDERS (PIO) |
| Aug 12, 2025 | A00121 | $2.2M | SHIP ALTERATION WORK |
| Aug 7, 2025 | A00120 | $3.6M | PROVISIONED ITEMS ORDERS (PIO) |
| Aug 5, 2025 | A00119 | $3.9M | SHIP ALTERATION WORK |
| Jul 31, 2025 | A00118 | $2.3M | PIO |
| Jul 30, 2025 | A00117 | $8.8M | SHIP ALTERATION WORK |
| Jul 24, 2025 | A00116 | $222.5K | PROVISIONED ITEMS ORDERS (PIO) |
| Jul 23, 2025 | A00115 | $4.4M | SHIP ALTERATION |
| Jul 17, 2025 | A00114 | $1.5M | PIO |
| Jul 16, 2025 | A00113 | $3.9M | SHIP ALTERATION WORK-SEVERABLE |
| Jul 11, 2025 | A00112 | $781.1K | PROVISIONED ITEMS ORDERS (PIO) |
| Jul 11, 2025 | P00010 | $0 | LANGUAGE FOR POTENTIAL SPECIAL CAPITAL EXPENDITURE (CAPEX) INCENTIVES FOR CONTRACTOR AND SUBCONTRACTOR SHIP REPAIR INVESTMENTS IN FACILITIES AND PROCESS IMPROVEMENT PROJECTS. |
| Jul 8, 2025 | A00111 | $935.8K | SHIP ALTERATION WORK |
| Jul 7, 2025 | A00110 | $53.8K | DDG51 CLASS PLANNING YARD - SUPPLIES - AWARD FEE PAYOUT |
| Jul 2, 2025 | A00109 | $97.7K | PROVISIONED ITEMS ORDERS (PIO) |
| Jul 1, 2025 | A00108 | $20.2M | SHIP ALTERATION |
| Jun 26, 2025 | A00107 | $634.0K | PROVISIONED ITEMS ORDERS (PIO) |
| Jun 24, 2025 | A00106 | $9.3M | SHIP ALTERATION WORK-SEVERABLE |
| Jun 17, 2025 | A00105 | $1.5M | PROVISIONED ITEMS ORDERS (PIO) |
| Jun 16, 2025 | A00104 | $2.1M | SHIP ALTERATION WORK-SEVERABLE |
| Jun 13, 2025 | P00009 | $0 | PIO |
| Jun 12, 2025 | A00103 | $3.6M | PROVISIONED ITEMS ORDERS (PIO) |
| Jun 11, 2025 | A00101 | $3.7M | SHIP ALTERATION WORK |
| Jun 11, 2025 | A00102 | $541.3K | SHIP ALTERATION WORK |
| Jun 4, 2025 | A00100 | $784.8K | SHIP ALTERATION WORK - SERVABLE |
| Jun 3, 2025 | A00099 | $2.7M | SHIP ALTERATION WORK |
| May 29, 2025 | A00098 | $3.7M | PROVISIONED ITEMS ORDERS (PIO) |
| May 23, 2025 | A00096 | $2.0M | SHIP ALTERATION WORK - AWARD FEE EARNED PAYOUT |
| May 23, 2025 | A00097 | $1.9M | SHIP ALTERATION WORK |
| May 22, 2025 | A00095 | $1.2M | PROVISIONED ITEMS ORDERS (PIO) |
| May 20, 2025 | A00093 | $550.8K | SHIP ALTERATION WORK |
| May 20, 2025 | A00094 | $374.6K | SHIP ALTERATION WORK - OPTION ONE EXERCISE |
| May 15, 2025 | A00092 | $175.7K | PROVISIONED ITEMS ORDERS (PIO) |
| May 8, 2025 | A00091 | $571.7K | PROVISIONED ITEMS ORDERS (PIO) |
| May 5, 2025 | A00090 | $-168.6K | SHIP ALTERATION WORK |
| May 2, 2025 | A00089 | $1.2M | PROVISIONED ITEMS ORDERS (PIO) |
| Apr 29, 2025 | A00088 | $2.7M | SHIP ALTERATION WORK-SEVERABLE |
| Apr 24, 2025 | A00087 | $93.2K | PROVISIONED ITEMS ORDERS (PIO) |
| Apr 23, 2025 | A00086 | $4.3M | SHIP ALTERATION WORK |
| Apr 17, 2025 | A00085 | $415.4K | PROVISIONED ITEMS ORDERS (PIO) |
| Apr 11, 2025 | A00084 | $-833.5K | SHIP ALTERATION WORK-SEVERABLE |
| Apr 11, 2025 | P00008 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CONDUCT CEILING REALIGNMENT. |
| Apr 10, 2025 | A00083 | $116.8K | PROVISIONED ITEMS ORDERS (PIO) |
| Apr 8, 2025 | A00082 | $150.1K | SHIP ALTERATION WORK |
| Apr 3, 2025 | A00081 | $1.4M | PROVISIONED ITEMS ORDERS (PIO) |
| Apr 1, 2025 | A00080 | $1.1M | SHIP ALTERATION WORK |
| Mar 25, 2025 | A00079 | $18.1K | SHIP ALTERATION WORK |
| Mar 24, 2025 | A00078 | $1.1M | PROVISIONED ITEMS ORDERS (PIO) |
| Mar 18, 2025 | A00077 | $994.2K | SHIP ALTERATION WORK |
| Mar 14, 2025 | A00076 | $394.2K | PROVISIONED ITEMS ORDERS (PIO) |
| Mar 10, 2025 | A00075 | $1.6M | SHIP ALTERATION WORK |
| Mar 6, 2025 | A00074 | $532.8K | PROVISIONED ITEMS ORDERS (PIO) |
| Mar 5, 2025 | A00073 | $-1.0M | SHIP ALTERATION WORK-SEVERABLE |
| Feb 27, 2025 | A00072 | $347.9K | PROVISIONED ITEMS ORDERS (PIO) |
| Feb 25, 2025 | A00071 | $68.9K | SHIP ALTERATION WORK |
| Feb 20, 2025 | A00070 | $327.3K | PROVISIONED ITEMS ORDERS (PIO) |
| Feb 19, 2025 | A00069 | $1.6M | SHIP ALTERATION WORK |
| Feb 12, 2025 | A00068 | $4.1M | PROVISIONED ITEMS ORDERS (PIO) |
| Feb 11, 2025 | A00067 | $1.8M | SHIP ALTERATION WORK-SEVERABLE |
| Feb 6, 2025 | A00066 | $525.1K | PROVISIONED ITEMS ORDERS (PIO) |
| Feb 4, 2025 | A00065 | $3.7M | SHIP ALTERATION WORK-SEVERABLE |
| Jan 30, 2025 | A00064 | $667.9K | PROVISIONED ITEMS ORDERS (PIO) |
| Jan 28, 2025 | A00063 | $1.9M | SHIP ALTERATION WORK - SEVERABLE |
| Jan 23, 2025 | A00062 | $2.9M | PROVISIONED ITEMS ORDERS (PIO) |
| Jan 22, 2025 | A00061 | $7.6M | SHIP ALTERATION WORK - SEVERABLE |
| Jan 16, 2025 | A00060 | $2.7M | PROVISIONED ITEMS ORDERS (PIO) |
| Jan 14, 2025 | A00059 | $598.5K | SHIP ALTERATION WORK |
| Jan 13, 2025 | P00007 | $0 | CEILINGS REALIGNMENT FROM CLIN 0409 AND CLIN 0410 TO CLIN 1006 IN SUPPORT OF SPECIAL TASKING UPDATING THE DD254. |
| Jan 8, 2025 | A00057 | $17.0K | PROVISIONED ITEMS ORDERS (PIO) |
| Jan 8, 2025 | A00058 | $248.0K | SHIP ALTERATION WORK - SEVERABLE |
| Dec 23, 2024 | A00056 | $374.1K | SHIP ALTERATION WORK-SEVERABLE |
| Dec 20, 2024 | A00055 | $3.7M | PROVISIONED ITEMS ORDERS (PIO) |
| Dec 18, 2024 | A00054 | $231.8K | SHIP ALTERATION WORK-SEVERABLE |
| Dec 13, 2024 | A00053 | $0 | SHIP ALTERATION WORK - SEVERABLE |
| Dec 12, 2024 | A00052 | $424.0K | PROVISIONED ITEMS ORDERS (PIO) |
| Dec 9, 2024 | A00051 | $1.1M | SHIP ALTERATION WORK-SEVERABLE |
| Dec 5, 2024 | A00050 | $248.9K | PROVISIONED ITEMS ORDERS (PIO) |
| Nov 27, 2024 | A00049 | $370.1K | PROVISIONED ITEMS ORDERS (PIO) |
| Nov 26, 2024 | A00048 | $407.9K | SHIP ALTERATION WORK |
| Nov 21, 2024 | A00047 | $95.6K | PROVISIONED ITEMS ORDERS (PIO) |
| Nov 20, 2024 | A00046 | $2.4M | SHIP ALTERATION WORK-SEVERABLE |
| Nov 14, 2024 | A00045 | $1.8M | PROVISIONED ITEMS ORDERS (PIO) |
| Nov 13, 2024 | A00044 | $720.5K | SHIP ALTERATION WORK-SEVERABLE |
| Nov 13, 2024 | P00006 | $0 | CEILING REALIGNMENT FROM CLIN 1017 TO CLIN 1007. |
| Nov 7, 2024 | A00043 | $4.9M | PROVISIONED ITEMS ORDERS (PIO) |
| Nov 5, 2024 | A00042 | $4.0M | SHIP ALTERATION WORK |
| Oct 31, 2024 | A00041 | $90.9K | PROVISIONED ITEMS ORDERS (PIO) |
| Oct 29, 2024 | A00040 | $4.3M | SHIP ALTERATION WORK-SEVERABLE |
| Oct 24, 2024 | A00039 | $630.5K | PROVISIONED ITEMS ORDERS (PIO) |
| Oct 23, 2024 | A00038 | $9.8M | SHIP ALTERATION WORK - SEVERABLE |
| Oct 18, 2024 | A00037 | $1.3M | PROVISIONED ITEMS ORDERS (PIO) |
| Oct 17, 2024 | A00036 | $1.9M | SHIP ALTERATION WORK - SEVERABLE |
| Oct 10, 2024 | A00035 | $11.5K | PROVISIONED ITEMS ORDERS (PIO) |
| Oct 8, 2024 | A00034 | $416.1K | SHIP ALTERATION WORK - SEVERABLE |
| Oct 3, 2024 | A00033 | $212.8K | PROVISIONED ITEMS ORDERS (PIO) |
| Sep 25, 2024 | A00032 | $3.8M | PROVISIONED ITEMS ORDERS (PIO) |
| Sep 23, 2024 | A00031 | $245.3K | SHIP ALTERATION WORK - SEVERABLE |
| Sep 20, 2024 | A00030 | $5.5M | SHIP ALTERATION WORK |
| Sep 18, 2024 | A00029 | $4.5M | SHIP ALTERATION WORK - SEVERABLE |
| Sep 13, 2024 | A00028 | $4.1M | SHIP ALTERATION WORK - SEVERABLE |
| Sep 12, 2024 | A00027 | $272.5K | PIO |
| Sep 10, 2024 | A00026 | $333.7K | SHIP ALTERATION WORK-SEVERABLE |
| Sep 6, 2024 | A00025 | $3.4M | SHIP ALTERATION WORK - SEVERABLE |
| Sep 5, 2024 | A00024 | $80.8K | PROVISIONED ITEMS ORDERS (PIO) |
| Aug 29, 2024 | A00023 | $36.1K | PROVISIONED ITEMS ORDERS (PIO) |
| Aug 27, 2024 | A00022 | $2.4M | SHIP ALTERATION WORK-SEVERABLE |
| Aug 22, 2024 | A00021 | $6.6M | PROVISIONED ITEMS ORDERS (PIO) |
| Aug 21, 2024 | A00020 | $882.4K | SHIP ALTERATION WORK - SEVERABLE |
| Aug 16, 2024 | A00019 | $1.7M | SHIP ALTERATION WORK - SEVERABLE |
| Aug 15, 2024 | A00018 | $47.1K | PROVISIONED ITEMS ORDERS (PIO) |
| Aug 13, 2024 | A00017 | $853.7K | SHIP ALTERATION WORK - SEVERABLE |
| Aug 9, 2024 | A00016 | $1.2M | SHIP ALTERATION WORK - SEVERABLE |
| Aug 9, 2024 | P00005 | $0 | INCREASE CEILING ON TRAVEL CLINS CLIN 1007 AND CLIN 1017. |
| Aug 8, 2024 | A00015 | $1.1M | PROVISIONED ITEMS ORDERS (PIO) |
| Aug 2, 2024 | A00014 | $765.8K | SHIP ALTERATION WORK - SEVERABLE |
| Aug 1, 2024 | A00013 | $1.6M | PIO |
| Jul 31, 2024 | A00011 | $4.7M | SHIP ALTERATION WORK - SEVERABLE |
| Jul 31, 2024 | A00012 | $1.6M | SHIP ALTERATION WORK - SEVERABLE |
| Jul 30, 2024 | A00008 | $1.7M | SHIP ALTERATION WORK - SEVERABLE |
Estimated positioning window
Jul 31, 2028 – Jan 31, 2029
60/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 60/100. Available recorded signals: 55 points.
- Contract end 2029-07-31 (1003 days from calculation)
- +15 points
- 126 historical awards in this buyer and category group
- +15 points
- 214 recorded award transactions
- +10 points
- Latest award action: 2026-06-05
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Verify whether remaining options may extend performance beyond the current end date.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.