Federal contract award

N0016422CJQ86

LABOR, MATERIALS AND OTHER DIRECT COSTS, AND TRAVEL IN SUPPORT OF ELECTRO-OPTIC AND/OR COUNTER-UNMANNED SYSTEMS ON VARIOUS CLASS NAVY OR ASSOCIATED SHIPS AND FACILITIES

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNSWC CRANE
NAICS336611 — Ship Building and Repairing
PSCN020 — Installation of Equipment: Ship and Marine Equipment
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeCOST PLUS FIXED FEE
Obligations$27.2M
Current contract value$36.7M
Potential contract value / ceiling$36.7M
Start dateFeb 28, 2022
Current end dateFeb 27, 2027
Potential end dateFeb 27, 2027
Latest award activityAug 17, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 84 of 84 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 17, 2026P00085$477.8KAIT AND ASHORE SUPPORT FOR ELECTRO-OPTIC SENSOR SYSTEMS
Jun 2, 2026P00082$69.0KAIT AND ASHORE SUPPORT FOR ELECTRO-OPTIC SENSOR SYSTEMS
May 11, 2026P00081$0AIT AND ASHORE SUPPORT FOR ELECTRO-OPTIC SENSOR SYSTEMS
Apr 30, 2026P00080$296.0KAIT AND ASHORE SUPPORT FOR ELECTRO-OPTIC SENSOR SYSTEMS
Apr 1, 2026P00079$546.8KAIT AND ASHORE SUPPORT FOR ELECTRO-OPTIC SENSOR SYSTEMS
Mar 16, 2026P00078$409.8KAIT AND ASHORE SUPPORT FOR ELECTRO-OPTIC SENSOR SYSTEMS
Jan 6, 2026P00077$775.6KAIT AND ASHORE SUPPORT FOR ELECTRO-OPTIC SENSOR SYSTEMS
Dec 15, 2025P00076$4.2KAIT AND ASHORE SUPPORT FOR ELECTRO-OPTIC SENSOR SYSTEMS
Sep 25, 2025P00075$7.0MAIT AND ASHORE SUPPORT FOR ELECTRO-OPTIC SENSOR SYSTEMS
Sep 5, 2025P00074$0AIT AND ASHORE SUPPORT FOR ELECTRO-OPTIC SENSOR SYSTEMS
Sep 3, 2025P00073$251.1KAIT AND ASHORE SUPPORT FOR ELECTRO-OPTIC SENSOR SYSTEMS
Jul 22, 2025P00072$991.6KAIT AND ASHORE SUPPORT FOR ELECTRO-OPTIC SENSOR SYSTEMS
Jul 2, 2025P00071$201.2KAIT AND ASHORE SUPPORT FOR ELECTRO-OPTIC SENSOR SYSTEMS
May 22, 2025P00070$536.4KAIT AND ASHORE SUPPORT FOR ELECTRO-OPTIC SENSOR SYSTEMS
Apr 3, 2025P00069$284.7KAIT AND ASHORE SUPPORT FOR ELECTRO-OPTIC SENSOR SYSTEMS
Mar 14, 2025P00068$137.3KAIT AND ASHORE SUPPORT FOR ELECTRO-OPTIC SENSOR SYSTEMS
Mar 4, 2025P00067$0POP EXTENSIONS
Feb 27, 2025P00066$631.2KFUNDING FOR 154' FRC USCGC INSTALLS FUNDING FOR SPECIAL BOAT GROUP CCFLIR EFFORTS POP EXTENSIONS
Feb 4, 2025P00065$61.6KPOP EXTENSIONS FOR OY3 FUNDING FOR SSP SV-33 AND SV-64 INSTALLS FUNDING FOR REMOVAL OF FSP TALON SYSTEM FROM LPD-23
Nov 20, 2024P00064$101.4KFUNDING FOR USCG INSTALL KITS, USCG C5ISR FTE, AND MARFLIR II INSTALLS ABOARD USCG CUTTERS FUNDING FOR FIBER OPTIC TRAINING CLASS.
Oct 18, 2024P00063$66.8KCORRECTION OF COST/FEE CALCULATIONS FROM A PRIOR MOD.
Sep 30, 2024P00062$297.6KINCREMENTAL FUNDING FOR MARFLIR II INSTALLATIONS, AN/SAY-3 I-STALKER INSTALLATIONS, AND MARITIME DATA TEST KIT COMPONENTS POP EXTENSIONS PAYMENT OFFICE CHANGE
Sep 25, 2024P00061$39.0KINCREMENTAL FUNDING FOR AN/SAY-3 I-STALKER FWD INSTALLATION ABOARD CVN-79 INCREMENTAL FUNDING FOR SAWS RACK BUILDS POP EXTENSIONS AND DEOBLIGATION OF EXCESS FUNDING.
Sep 6, 2024P00060$2.7MOPTION EXERCISE POP EXTENSION DEOBLIGATION OF EXCESS FUNDS INCREMENTAL AND FULL FUNDING IN SUPPORT OF AN/SAY-3 I-STALKER INSTALLATIONS, MARFLIR II INSTALLATIONS AND USCG CUTTER INSTALL KITS.
Aug 8, 2024P00059$157.0KINCREMENTAL FUNDING FOR USCG AND CCFLIR EFFORTS.
Jul 17, 2024P00058$350.0KFUNDING FOR MARITIME DATA TEST KITS AND MARFLIR II INSTALLS ABOARD USCGC FORWARD, HARRIET LANE, AND VIGOROUS.
Jun 27, 2024P00057$15.9KINCREMENTAL FUNDING FOR SSP INSTALLS POP EXTENSION FOR SAWS RACK BUILDS
Jun 4, 2024P00056$186.0KFUNDING FOR CAC2S AFLOAT INSTALL ABOARD LPD-22 AN-SAY-3 I-STALKER INSTALLATION ABOARD LHD-7 USCG C5ISR TRAVEL USCG FREE SPACE OPTICS (FSO) MARITIME DATA TEST KITS AND J9 CABLE REPAIR ABOARD LHA-6
May 8, 2024P00055$279.9KFUNDING FOR AN/SAY-3 I-STALKER INSTALLATION ABOARD LHD-5 SSP INSTALLS IN BANGOR, WA SAWS RACK BUILDS USCG LOGISTICS SUPPORT AND USCG FAST RESPONSE CUTTER INSTALL KITS.
Apr 17, 2024P00054$24.4KINCREMENTAL FUNDING FOR SSP INSTALLS IN BANGOR, WA
Apr 12, 2024P00053$269.7KDEOBLIGATION OF EXCESS FUNDING INCREMENTAL FUNDING FOR AN/SAY-3 I-STALKER INSTALLATIONS SAWS RACK BUILDS AND CCFLIR SUPPORT.
Mar 21, 2024P00052$131.5KINCREMENTAL FUNDING FOR USCG WMRC KITS AN/SAY-3 I-STALKER INSTALLATION ABOARD LHD-7 CAC2S AFLOAT INSTALLATIONS ABOARD LHD-2, LHD-4, AND LPD-22.
Mar 1, 2024P00051$-292.9KDEOBLIGATION OF EXCESS FUNDING POP EXTENSIONS INCREMENTAL FUNDING FOR AN/SAY-3 I-STALKER FWD INSTALLATION ABOARD LHD-7
Feb 28, 2024P00050$513.3KFUNDING IN SUPPORT OF AN/SAY-3 I-STALKER FWD INSTALLATION ABOARD LHD-3 POP EXTENSIONS
Feb 22, 2024P00049$287.6KEXERCISE OPTION YEAR 2 FUNDING FOR OY2 SPECIAL BOAT GROUP, USCG, AND USCG C5ISR SUPPORT POP EXTENSION FOR AN/SAY-3 I-STALKER RACK BUILDS AND SPECIAL BOAT GROUP WEST COAST.
Feb 13, 2024P00048$75.0KINCREMENTAL FUNDING FOR AN/SAY-3 I-STALKER INSTALLATION ABOARD LHD-3.
Jan 31, 2024P00047$80.6KINCREMENTAL FUNDING FOR SSP INSTALLS ON THE WEST COAST AND AT KINGS BAY AND FOR CAC2S AFLOAT INSTALL ABOARD LHD-2.
Jan 17, 2024P00046$85.4KFUNDING FOR CAC2S AFLOAT INSTALL ABOARD LHD-2 AND USCG FTE
Dec 11, 2023P00045$24.7KINCREMENTAL FUNDING FOR SSP INSTALLS AND MK38 MOD 4 GWS FIBER CHECKOUT SUPPORT
Nov 14, 2023P00044$596.5KINCREMENTAL FUNDING AND POP EXTENSIONS FOR VARIOUS AN/SAY-3 I-STALKER, CAC2S AFLOAT, AND SSP INSTALLS, AS WELL AS SAWS RACK FABRICATION.
Oct 24, 2023P00043$12.0KFUNDING IN SUPPORT OF AN/SAY-3 I-STALKER INSTALLATION ABOARD CVN-70
Sep 28, 2023P00042$90.0KFUNDING FOR USCG CUTTER INSTALL KITS
Sep 21, 2023P00041$29.8KINCREMENTAL FUNDING FOR CAC2S AFLOAT INSTALLATION ABOARD LHD-2
Sep 13, 2023P00040$197.3KINCREMENTAL FUNDING FOR AN/SAY-3 I-STALKER INSTALLATION ABOARD CVN-70 FUNDING FOR MK48 MOD 4 GWS FIBER CHECKOUT ABOARD DDG-89
Sep 6, 2023P00039$728.2KFUNDING FOR AN/SAY-3 I-STALKER INSTALLATION ABOARD CVN-73.
Aug 30, 2023P00038$51.0KPOP EXTENSION FOR SSP INSTALLS INCREMENTAL FUNDING FOR USCG AND CAC2S AFLOAT INSTALL ABOARD LHD-8
Aug 18, 2023P00037$133.5KFUNDING FOR AN/SAY-3 I-STALKER INSTALLATION ABOARD CVN-69 AND CVN-70 FUNDING FOR CAC2S AFLOAT INSTALLATION ABOARD LHD-8 POP EXTENSION FOR CVN-75 AND SSP WEST COAST INSTALLS
Aug 7, 2023P00036$135.4KFUNDING FOR CAC2S AFLOAT INSTALLATION ABOARD LHD-2 AND LPD-22, AND FIBER OPTIC TRAINING COURSE AND ADDED LANGUAGE FOR COST OVERRUNS ON AN/SAY-3 I-STALKER INSTALLATION ABOARD LHD-4.
Aug 1, 2023P00035$99.8KPOP EXTENSION FOR AN/SAY-3 I-STALKER INSTALL ABOARD LHD-7 AND LABOR FUNDING FOR AN/SAY-3 I-STALKER INSTALL COMPLETION ABOARD CVN-69
Jun 20, 2023P00034$35.5KINCREMENTAL FUNDING FOR TI-14, USCG SUPPORT
Jun 8, 2023P00033$78.3KFUNDING TO REMOVE FSO TALON SYSTEM OFF LPD-23, AND INCREMENTAL FUNDING IN SUPPORT OF MSC SAWS T/AKE INSTALLS.
Jun 7, 2023P00032$158.6KINCREMENTAL FUNDING FOR CAC2S AFLOAT INSTALLATION ABOARD LHD-2
May 31, 2023P00031$135.0KPOP EXTENSION FOR ELECTRONICS RACKS BUILDS INCREMENTAL FUNDING FOR CAC2S AFLOAT INSTALLATION ABOARD LPD-22
May 30, 2023P00030$53.1KFUNDING FOR CAC2S AFLOAT INSTALL ABOARD LPD-22
May 4, 2023P00029$99.3KFUNDING IN SUPPORT OF CAC2S AFLOAT INSTALLATION ON LPD-22, CLIN DESCRIPTION CHANGES FOR CAC2S AFLOAT INSTALLATION ON LHD-2
Apr 24, 2023P00028$225.0KSPECIAL BOAT GROUP SUPPORT IN SAN DIEGO POP EXTENSION FOR CAC2S AFLOAT INSTALLATION ABOARD LHD-2
Apr 19, 2023P00027$210.5KFUNDING FOR 380HD SAWS REPAIRS ABOARD CVN-75, AND POP EXTENSIONS FOR SSP EAST COAST INSTALLATIONS AND ELECTRONICS CONTROL BOX BUILDS.
Apr 17, 2023P00026$490.3KFUNDING FOR MSC T/AKE INSTALLS, CAC2S AFLOAT INSTALL ABOARD LHD-2, AND USCG SUPPORT
Apr 5, 2023P00025$1.2MFUNDING FOR USCG SUPPORT, SSP LOGISTICS SUPPORT, AND AN/SAY-3 I-STALKER INSTALLATIONS ABOARD CVN-69 AND LHD-7
Apr 3, 2023P00024$0COMBINE AWARDED AND EXERCISED CEILING CLIN AMOUNTS
Mar 7, 2023P00023$4.1KTRAVEL AND MATERIAL FUNDING FOR USCG SUPPORT
Mar 2, 2023P00022$83.0KLABOR, MATERIALS, AND TRAVEL FUNDING FOR AN/SAY-3 I-STALKER INSTALLATION ABOARD LHD-4
Mar 1, 2023P00021$326.1KLABOR AND MATERIALS FUNDING FOR AN/SAY-3 I-STALKER INSTALLATION ABOARD LHD-4
Feb 28, 2023P00020$65.2KLABOR AND MATERIALS FOR PRE-PLANNING FOR AN/SAY-3 I-STALKER INSTALLATION ABOARD LHD-7
Feb 27, 2023P00019$-16.7KDEOBLIGATION OF EXCESS FUNDS
Feb 24, 2023P00018$139.4KMATERIALS FUNDING FOR ELECTRONICS CONTROL BOX BUILDS
Feb 23, 2023P00017$160.0KLABOR, MATERIALS, AND TRAVEL FUNDING FOR SPECIAL BOAT GROUP/CCFLIR
Feb 21, 2023P00016$30.0KLABOR FUNDING FOR USCG SUPPORT
Feb 13, 2023P00015$312.4KFUNDING FOR ELECTRONICS ASSEMBLY AND CONTROL ELECTRONICS BOX FABRICATION
Feb 10, 2023P00014$0CORRECTION OF ERRORS MADE ON PREVIOUS MODIFICATIONS
Jan 31, 2023P00013$10.0KADDITIONAL LABOR FUNDING FOR USCG SUPPORT
Jan 13, 2023P00012$-77.4KTRAVEL FUNDING FOR CCFLIR FUNDING FOR LHD-4 CAC2S AFLOAT INSTALL AND DEOBLIGATION OF EXCESS FUNDS.
Dec 9, 2022P00011$517.2KLABOR, MATERIALS, AND TRAVEL FUNDING FOR AN/SAY-3 I-STALKER FWD INSTALL ABOARD LHD-4
Nov 1, 2022P00010$28.6KPRE-PLANNING FUNDING FOR LHD-4 AN/SAY-3 I-STALKER FWD INSTALL
Oct 27, 2022P00009$440.9KFUNDING FOR CAC2S AFLOAT INSTALL EFFORT ABOARD LHD-2
Sep 26, 2022P00008$215.0KFUNDING FOR SSP INSTALLS
Sep 21, 2022P00007$59.8KLABOR SUPPORT FOR SSP INSTALLS
Aug 24, 2022P00006$775.8KOTHER DIRECT COSTS (ODC), AND MATERIAL
Aug 5, 2022P00005$17.8KLABOR AND MATERIALS FUNDING FOR GPS/GYRO CABLE BUILDS AND LABOR FUNDING FOR SPECIAL BOAT GROUP SUPPORT.
Jul 15, 2022P00004$1.2MFUNDING FOR CVN-68 AN/SAY-2 I-STALKER INSTALL WORK
May 24, 2022P00003$36.0KADDITIONAL LABOR FUNDING FOR UNITED STATES COAST GUARD SUPPORT.
Apr 18, 2022P00002$65.0KINCREMENTAL FUNDING FOR TRAVEL AND LABOR FOR SPECIAL BOAT GROUP/CCFLIR SUPPORT
Apr 12, 2022P00001$15.0KLABOR FUNDING FOR USCG SUPPORT
Feb 28, 20220$4.7KLABOR, MATERIALS AND OTHER DIRECT COSTS, AND TRAVEL IN SUPPORT OF ELECTRO-OPTIC AND/OR COUNTER-UNMANNED SYSTEMS ON VARIOUS CLASS NAVY OR ASSOCIATED SHIPS AND FACILITIES

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
75/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 75/100. Available recorded signals: 70 points.

Contract end 2027-02-27 (125 days from calculation)
+35 points
3 historical awards in this buyer and category group
+10 points
84 recorded award transactions
+10 points
Latest award action: 2026-08-17
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.