Federal contract award
N4033925PF034
CONTINUOUS MAINTENANCE AVAILABILITY FOR 28 WORK ITEMS. TEMPORARY AIR CONDITIONING, PROVIDE, COLLECTING HOLDING & TRANSFER (CHT) PIPING SYSTEM FLUSH, WATERWAY BARS, REPLACE, AIR CONDITIONING PLANT COMPRESSOR, OVERHAUL.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | NAVSUP FLC BAHRAIN |
| NAICS | 336611 — Ship Building and Repairing |
| PSC | J998 — Non-nuclear Ship Repair (East) Ship repair (including overhauls and conversions) performed on non-nuclear propelled and nonpropelled ships east of the 108th meridian |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $207.2K |
| Current contract value | $207.2K |
| Potential contract value / ceiling | $207.2K |
| Start date | Apr 1, 2025 |
| Current end date | May 12, 2025 |
| Potential end date | May 12, 2025 |
| Latest award activity | May 14, 2025 |
| Source loaded | Aug 15, 2026 |
Funding and modification history
Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 14, 2025 | P00005 | $-14.8K | USS DEVASTATOR (MCM 6), CMAV PARTIAL DESCOPES DUE TO LONG LEAD TIME MATERIAL UNAVAILABLE TO PERFORM THE JOB WITHIN THE AVAILABILITY. |
| May 12, 2025 | P00004 | $0 | TEMPORARY AIR CONDITIONING, PROVIDE |
| May 7, 2025 | P00003 | $3.9K | ADDITIONAL REPAIRS FOR TEMPORARY AIR CONDITIONING PROVIDE FOR USS DEVASTATOR (MCM 6) CMAV |
| Apr 29, 2025 | P00002 | $3.1K | RCC 2G FOR ADDITIONAL REPAIRS FOR WORK ITEM 512-11-001, FAN COIL UNIT MOTOR AND FAN. |
| Apr 20, 2025 | P00001 | $23.8K | GROWTH WORK FOR RCC 1G, TEMPORARY AIR CONDITIONING, PROVIDE |
| Mar 13, 2025 | 0 | $191.2K | CONTINUOUS MAINTENANCE AVAILABILITY FOR 28 WORK ITEMS. TEMPORARY AIR CONDITIONING, PROVIDE, COLLECTING HOLDING & TRANSFER (CHT) PIPING SYSTEM FLUSH, WATERWAY BARS, REPLACE, AIR CONDITIONING PLANT COMPRESSOR, OVERHAUL. |