ACCOMPLISH INSTALLATION OF CANES HARDWARE 2.0 IN SUPPORT OF USS GEORGE WASHINGTON (CVN-73).

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVSUP FLT LOG CTR YOKOSUKA
NAICS336611 — Ship Building and Repairing
PSCJ999 — Non-nuclear Ship Repair (West) Ship repair (including overhauls and conversions) performed on. non-nuclear propelled and nonpropelled ships west of the 108th meridian
Parent award / vehicleN6264921D0006
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$2.3M
Current contract value$2.3M
Potential contract value / ceiling$2.3M
Start dateSep 25, 2024
Current end dateMay 13, 2025
Potential end dateMay 13, 2025
Latest award activityJun 2, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 22 of 22 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 2, 2025P00023$2.3MTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ADMINISTRATIVE CHANGES.
May 27, 2025P00022$-2.3MTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ADMINISTRATIVE CHANGES.
Apr 18, 2025P00021$651THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE WITHIN SCOPE GROWTH WORK.
Apr 11, 2025P00020$-651THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE DESCOPE WORK FROM THE BASIC DELIVERY ORDER.
Apr 2, 2025P00019$-4.6KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE DESCOPE WORK FROM THE BASIC DELIVERY ORDER.
Mar 26, 2025P00018$977THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE WITHIN SCOPE GROWTH WORK.
Mar 25, 2025P00017$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE POP END DATE CHANGE.
Mar 10, 2025P00016$7.2KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE WITHIN SCOPE GROWTH WORK.
Mar 7, 2025P00015$326THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE WITHIN SCOPE GROWTH WORK AND INCORPORATE DESCOPE WORK FROM THE BASIC DELIVERY ORDER.
Mar 5, 2025P00014$6.5KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE WITHIN SCOPE GROWTH WORK.
Feb 27, 2025P00013$-1.0KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE DESCOPE WORK WITHIN THE SCOPE OF THE BASIC CONTRACT.
Feb 19, 2025P00012$-1.3KTHE PURPOSE OF THIS MODIFICATION IS TO DESCOPE WORK FROM THE BASIC CONTRACT.
Feb 13, 2025P00011$19.9KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE GROWTH WORK WITHIN THE SCOPE OF THE BASIC CONTRACT.
Feb 5, 2025P00010$-3.9KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE DESCOPE WORK FROM THE BASIC DELIVERY ORDER.
Jan 31, 2025P00009$-2.6KTHE PURPOSE OF THIS MODIFICATION IS TO DESCOPE WORK FROM THE BASIC CONTRACT.
Jan 29, 2025P00008$121.2KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE GROWTH WORK WITHIN THE SCOPE OF THE BASIC CONTRACT.
Jan 24, 2025P00007$9.4KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE WITHIN SCOPE OF GROWTH WORK.
Jan 21, 2025P00006$2.3KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE GROWTH WORK WITHIN THE SCOPE OF THE BASIC CONTRACT.
Jan 17, 2025P00004$134.3KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE ADDITIONAL LABOR COST FOR BOF TUBE INSTALLATION REQUIREMENT AS REQUESTED BY THE CONTRACTOR THROUGH A REQUEST FOR EQUITABLE ADJUSTMENT (REA) IN THE SCOPE OF THE BASIC CONTRACT.
Jan 17, 2025P00005$18.3KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE GROWTH WORK WITHIN THE SCOPE OF THE BASIC CONTRACT.
Dec 6, 2024P00003$109.2KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE GROWTH WORK WITHIN THE SCOPE OF THE BASIC CONTRACT
Dec 4, 2024P00002$4.6KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE GROWTH WORK WITHIN THE SCOPE OF THE BASIC CONTRACT.