Federal contract award

W912BU26PA008

THE CONTRACTOR SHALL REMOVE AND REPLACE IDENTIFIED SECTIONS OF STIFFENERS, WEB FRAMES, EQUIPMENT FOUNDATIONS, STUFFING TUBES, DECK PLATING, AND CO2 PIPING, AND PERFORM ALL REQUIRED EQUIPMENT REPAIRS ABOARD THE DREDGE MCFARLAND.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW2SD ENDIST PHILADELPHIA
NAICS336611 — Ship Building and Repairing
PSCJ019 — Maintenance, Repair and Rebuilding of Equipment: Ships, Small Craft, Pontoons, and Floating Docks
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$1.6M
Current contract value$1.6M
Potential contract value / ceiling$1.6M
Start dateMar 4, 2026
Current end dateJun 1, 2026
Potential end dateJun 1, 2026
Latest award activityApr 29, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 29, 2026P00003$499.2KTHE CONTRACTOR SHALL REMOVE AND REPLACE IDENTIFIED SECTIONS OF STIFFENERS, WEB FRAMES, EQUIPMENT FOUNDATIONS, STUFFING TUBES, DECK PLATING, AND CO2 PIPING, AND PERFORM ALL REQUIRED EQUIPMENT REPAIRS ABOARD THE DREDGE MCFARLAND.
Apr 15, 2026P00002$163.0KTHE CONTRACTOR SHALL REMOVE AND REPLACE IDENTIFIED SECTIONS OF STIFFENERS, WEB FRAMES, EQUIPMENT FOUNDATIONS, STUFFING TUBES, DECK PLATING, AND CO2 PIPING, AND PERFORM ALL REQUIRED EQUIPMENT REPAIRS ABOARD THE DREDGE MCFARLAND.
Apr 6, 2026P00001$192.5KTHE CONTRACTOR SHALL REMOVE AND REPLACE IDENTIFIED SECTIONS OF STIFFENERS, WEB FRAMES, EQUIPMENT FOUNDATIONS, STUFFING TUBES, DECK PLATING, AND CO2 PIPING, AND PERFORM ALL REQUIRED EQUIPMENT REPAIRS ABOARD THE DREDGE MCFARLAND.
Mar 4, 20260$774.0KTHE CONTRACTOR SHALL REMOVE AND REPLACE IDENTIFIED SECTIONS OF STIFFENERS, WEB FRAMES, EQUIPMENT FOUNDATIONS, STUFFING TUBES, DECK PLATING, AND CO2 PIPING, AND PERFORM ALL REQUIRED EQUIPMENT REPAIRS ABOARD THE DREDGE MCFARLAND.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.