Date filters select awards with transaction activity in the period. Amounts below are lifetime award obligations. IDV values remain separate.
PROJECT NC ERFO NP BLRI 2024-1(4) THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED…Department of Transportation$3.8M obligationsEnds Jun 30, 2027
PROJECT TN ERFO FS CHRKE804 2020-1(1) THE PROJECT CONSISTS OF REPAIRS TO ROCKY TOP ROAD (FS 402) FOR A LENGTH OF 3.43 MILES, INCLUDING ROADWAY AND DITCH RECONDITIONING, AGGREGATE…Department of Transportation$2.8M obligationsEnds Oct 31, 2027
KY NP CUGA BRG(1) THE WORK INCLUDES REPLACING SUPERSTRUCTURE, CLEANING AND PAINTING RUSTED AREAS OF STEEL ARCH ALONG THE FOUNDATIONS, REMOVING FLOOD DEBRIS AND FALLEN TREES…Department of Transportation$1.1M obligationsEnds Aug 31, 2028
PROJECT TN ERFO FS CHRKE804 2021-1(1): THE PROJECT CONSISTS OF REPAIRING STORM AND FLOOD DAMAGE ON HURRICANE GAP ROAD (FS 31). THE SCOPE OF WORK INCLUDES DESIGN SERVICES, SLOPE…Department of Transportation$1.2M obligationsEnds Nov 22, 2027
PROJECT NC NP BLRI 2M28; NC NP BLRI 2M29: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 336.7, 336.75, 336.85, 336.95, 337.2, 338.2 AND MP 338.4. THE WORK INCLUDES SLIDE…Department of Transportation$19.0M obligationsEnds Jun 21, 2027
PROJECT PA ERFO FW CHV 2020-1(1): THE PROJECT CONSISTS OF THE REHABILITATION OF BACK NINE TRAIL, RIDGE NATURE TRAIL AND RIDGE NATURE PARKING AREA. THE WORK INCLUDES REMOVING AND…Department of Transportation$961.8K obligationsEnds Jul 31, 2027
THE PROJECT CONSISTS OF THE RECONSTRUCTION OF HATCHERY ENTRANCE ROAD (ROUTE 010), VISITOR OVERFLOW PARKING (ROUTE 900), VISITOR PARKING (ROUTE 903), AND 301AZ WITHIN THE NASHUA…Department of Transportation$716.7K obligationsEnds Dec 31, 2027
KY NP MACA 16(1), 200(1): THE PROJECT CONSISTS OF RECONFIGURATION OF THE INTERSECTION OF CAVE CITY ROAD AND FROZEN NIAGARA ROAD. THE WORK INCLUDES INTERSECTION AND ROADWAY…Department of Transportation$1.7M obligationsEnds Jan 21, 2027
PROJECT NC NP BLRI 2M31; NC NP BLRI 2N24; NC NP BLRI 2M26, 2N22: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 344.3 TO 351.9. THE WORK INCLUDES SLIDE REPAIRS, CULVERT…Department of Transportation$29.8M obligationsEnds Jun 21, 2027
PROJECT MS NP NATR 3P28: THE PROJECT CONSISTS OF MILLING AND ROAD OVERLAY OF ACCESS RAMPS TO INTERSTATE 55. THE WORK ALSO INCLUDES BRIDGE REPAIR, SIGNING, PAVEMENT STRIPING AND…Department of Transportation$3.1M obligationsEnds Oct 31, 2028
PROJECT NP-CHAT 102(1), 906(1), 907(1), 908(1): THE PROJECT CONSISTS OF REHABILITATION/RECONSTRUCTION OF THE ROADWAY AND PARKING AREAS, MILLING AND ASPHALT OVERLAY, INSTALLATION…Department of Transportation$3.1M obligationsEnds Jul 31, 2026
NRE-2926, DOGE APPROVED 7/15 080109 RHELM CON ROAD MAINTENANCE CONTRACTDepartment of Agriculture$206.7K obligationsEnds Sep 19, 2026
PROJECT TN NP GRSM 10N(5) THE PROJECT CONSISTS OF REPAIRING STORM DAMAGE ON NEWFOUND GAP ROAD WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES CONSTRUCTING A…Department of Transportation$2.1M obligationsEnds May 31, 2027
PROJECT AR FW BLD 11(1): THE PROJECT CONSISTS OF ROADWAY RECONSTRUCTION AND RESURFACING OF GRANARY SOUTH ROAD (ROUTE 011). THE WORK INCLUDES BANK STABILIZATION, AGGREGATE BASE…Department of Transportation$2.1M obligationsEnds Mar 9, 2027
PROJECT MS NP NATR BMS FY24(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 14 BRIDGES ALONG THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES THE REPAIR OF…Department of Transportation$529.9K obligationsEnds Feb 28, 2028
MDHP RP-18-03, CONSTRUCTION OF FIVE RISER PIPE GRADE CONTROL STRUCTURES.Department of Defense$1.7M obligationsEnds Sep 28, 2029
PROJECT LA NP JELA 7530-001P THE PROJECT CONSISTS OF THE REHABILITATION OF STRUCTURE 7530-001P OVER BAYOU DES FAMILLES IN THE JEAN LAFITTE NATIONAL HISTORICAL PARK AND PRESERVE…Department of Transportation$270.5K obligationsEnds Oct 29, 2025
AR ERFO FS OZSTF810 2022-1(1): THE PROJECT CONSISTS OF THE PERMANENT SLIDE REPAIR OF WHITE ROCK ROAD (NFSR 1003) AND EAST FLY GAP ROAD (NFSR 1503). THE WORK INCLUDES ROADWAY…Department of Transportation$5.7M obligationsEnds May 10, 2027
PROJECT NC NP BLRI 2F12: THE PROJECT CONSISTS OF ROADWAY RECONSTRUCTION AND DRAINAGE REPAIRS AT MP 276.35. THE WORK INCLUDES BRIDGE WORK; GUARD WALL CONSTRUCTION; LOWER RETAINING…Department of Transportation$1.5M obligationsEnds Jul 10, 2025
PROJECT MS ERFO FW HILL 2020-1(1): THE PROJECT CONSISTS OF THE REMOVAL AND RECONSTRUCTION OF TWO BOARDWALKS AND THE REHABILITATION OF ALLIGATOR SLOUGH NATURE TRAIL AND PARKING…Department of Transportation$2.3M obligationsEnds Apr 30, 2027
PROJECT OH ERFO FS WAYNE914 2021-1(1) THE PROJECT CONSISTS OF THE REPAIR AND RECONSTRUCTION OF VESUVIUS ROAD (FS 1955) AND HANGING ROCK SPUR A (FS 105A). THE WORK INCLUDES THE…Department of Transportation$4.7M obligationsEnds May 9, 2028
PROJECT TX FTFW SAMA 10(1)_2: THE PROJECT CONSISTS OF THE REHABILITATION AND REALIGNMENT OF THE ENTRANCE ROAD WITHIN THE SAN MARCOS AQUATIC RESOURCES CENTER.Department of Transportation$2.3M obligationsEnds Feb 10, 2025
PROJECT ME NP ACAD BRG(1): THE PROJECT CONSISTS OF BRIDGE REHABILITATION AND REPAIR OF WILDWOOD ENTRANCE AND JORDAN POND-SEAL HARBOR BRIDGES. THE WORK INCLUDES CUTTING WEEP HOLE…Department of Transportation$1.9M obligationsEnds Mar 12, 2025