Date filters select awards with transaction activity in the period. Amounts below are lifetime award obligations. IDV values remain separate.
FLATWOODS GYM HVAC REHAB. REPLACE TWO NON-OPERATING PACKAGE HVAC SYSTEMS ALONG WITH DUCT WORK AND GAS PIPE THAT PROVIDES HEAT AND COOLING TO THE GYMNASIUM.Department of Agriculture$140.5K obligationsEnds Nov 30, 2026
PA ERFO NP DEWA 2021-1(1) THE PROJECT CONSISTS OF REMOVING EXISTING ASPHALT PAVEMENT, CONVERT EXISTING GRAVEL BASE COURSE TO GRAVEL TRAIL, AND ROADWAY EXCAVATION TO PLACE 4 INCH…Department of Transportation$656.3K obligationsEnds May 24, 2027
PROJECT DC NP NAMA 18(1), 19(1), 25(2): THIS PROJECT CONSISTS OF 2-INCH MILL AND ASPHALT OVERLAY AND PAVEMENT MARKINGS ON HENRY BACON DR NW, 23RD STREET NW, 23RD STEET SW, DANIEL…Department of Transportation$2.3M obligationsEnds Nov 30, 2027
CARL-REPAIR EQUIPMENT STORAGE SHEDDepartment of the Interior$263.1K obligationsEnds Mar 8, 2027
MASONRY REPAIRGeneral Services Administration$32.7K obligationsEnds Dec 4, 2026
ROCR 338662 MERIDIAN HILL FOUNTAINDepartment of the Interior$11.4M obligationsEnds Oct 15, 2026
OFFICE BUILDOUT-USCOA AT THE LEWIS F POWELL JR US CH ANNEX IN RICHMOND, VAGeneral Services Administration$29.7K obligationsEnds Oct 31, 2026
EO 14398 - FLAGPOLE REPLACEMENTS AT FORT WASHINGTON PARK (FOWA) AND FORT MCHENRY NATIONAL MONUMENT AND HISTORIC SHRINE (FOMC)Department of the Interior$590.7K obligationsEnds Oct 31, 2027
POTOMAC JCC - PROJECT 4175 DESIGN BUILD ACQUISITION STORM WATER DRAINAGE REPAIR AND BUILDING 14 STRUCTURAL REPAIR THIS SCOPE OF WORK (SOW) INCLUDES DESIGN-BUILD SERVICES NEEDED…Department of Labor$3.4M obligationsEnds Oct 16, 2026
PORTSMOUTH FEDERAL BUILDING REMODEL KITCHENETTE, CARPET AND PAINT PROJECTS USCG.General Services Administration$119.6K obligationsEnds Aug 9, 2026
SCHENCK MULTIPLE BUILDING LIFE SAFETY - ARCHITECTURAL AND DOORS. DOOR AND HARDWARE REPLACEMENTS, REPAIRS, AND ADJUSTMENTS TO CORRECT INOPERABLE EGRESS OPENINGS TO COMPLY WITH…Department of Agriculture$63.2K obligationsEnds Aug 31, 2026
NAMA 350892 FREEDOM PLAZA BEAUTIFICATION AND FOUNTAIN REHABILITATIONDepartment of the Interior$10.5M obligationsEnds Sep 4, 2026
NACE 242190 - TELECOM, ROOF REPAIR, AND DOOR REPAIRDepartment of the Interior$191.6K obligationsEnds Jan 5, 2027
MULTI - PROVIDE TEMPORARY CHILLED WATER CONNECTIONS FOR SMZ.Smithsonian Institution$522.3K obligationsEnds Aug 25, 2026
REVITALIZE HISTORIC CORE.Smithsonian Institution$10.3K obligationsEnds Sep 28, 2026
CONSISTS OF THE REPAIR OF IMPROVED ACCESS AND PARK VISITOR EXPERIENCE AT FARMINGTON LANDING AND FORT FOOTE BY IMPROVING PARKING LOTS, ACCESS ROAD, AND VISITOR FACILITIES; THESE…Department of the Interior$215.3K obligationsEnds Nov 30, 2026
PROJECT VA NP GWMP MVT(8) THE PURPOSE OF THE PROJECT IS TO REPAIR AN EMBANKMENT FAILURE NEAR MOUNT VERNON TRAIL BRIDGE 26. A SLOPE FAILURE WAS IDENTIFIED BY A TRAIL USER ON…Department of Transportation$759.5K obligationsEnds Dec 30, 2028
COURTROOM PAINTING IN RICHMOND, VA AT THE UNITED STATES DISTRICT COURTGeneral Services Administration$17.6K obligationsEnds Nov 24, 2026
MINIMUM GUARANTEE TASK ORDER FOR NEWLY ISSUED SIMPLIFIED ACQUISITION OF BASE ENGINEER REQUIREMENTS MULTIPLE AWARD INDEFINITE DELIVERY - INDEFINITE QUANTITY CONTRACT.Department of Defense$2.0K obligationsEnds Jun 3, 2027
THIS PROJECT IS TO INSTALL THE BALLISTIC GLAZING FOR ALL CHAMBERS AT THE WALTER E. HOFFMAN COURTHOUSE LOCATED IN NORFOLK, VA, PROJECT TITLE: WINDOW BALLISTIC GLAZING OFF THE…General Services Administration$39.8K obligationsEnds Oct 1, 2026
NATIONAL CAPITAL PARKS- EAST FOLGER PARK REHABILITATIONDepartment of the Interior$2.1M obligationsEnds Jun 26, 2026
EO 14398 - GETTYSBURG NATIONAL MILITARY PARK (GETT) - REHABILITATE PENNSYLVANIA MONUMENT AND SPANGLER'S SPRING COMFORT STATIONSDepartment of the Interior$394.3K obligationsEnds Apr 2, 2027
REPAIR AREAS ON THE 1ST AND 2ND FLOORS DAMAGED BY THE CHILLER PIPE LEAK AT THE LEWIS F. POWELL COURTHOUSE IN RICHMOND VA, 23219.General Services Administration$61.8K obligationsEnds Aug 31, 2026
LAB RENOVATION AND RETROFITDepartment of the Interior$448.2K obligationsEnds Aug 7, 2026
NORFOLK FEDERAL BUILDING RETURN TO OFFICE FIT OUT, NORFOLK, VA. THIS PROJECT FITS OUT SPACE FOR THE RETURN TO OFFICE OF FEDERAL EMPLOYEES.General Services Administration$228.9K obligationsEnds Jul 5, 2026